Yunfei Zheng

Dr. Yunfei Zheng


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
12 March 2025 in Buildings
Verified
Journal Article
Open access
PDF file
RZRuichuan Zhao
Ruichuan Zhao
YZYunfei Zheng
Yunfei Zheng
YGYongjian Guo
Yongjian Guo
SLShaoshun Luan
Shaoshun Luan
SZSulei Zhang
Sulei Zhang
Subway tunnels excavated in soil–rock composite strata face great challenges due to the prevalence of inner defects. The instability of tunnels in these strata poses significant risks to construction safety. In this paper, indoor experiments are adopted to study the instability process of a subway tunnel in soil–rock composite strata influenced by inner cavities. A total of six groups of tests are designed based on the location of the cavity and the distance of the cavity from the tunnel. High-resolution monitoring techniques are employed to capture the real-time deformation and failure process of strata. The results show that a cavity in the strata significantly affects the stability of the strata after the tunnel excavation. The existence of a cavity increases ground deformation, and a cavity at different locations affects ground deformation. The strata around the cavity are the first to experience failure by the upper loads applied after the tunnel is excavated. The location of the cavity changes the stress distribution state of the strata and thus alters the emergence of cracks, which finally disturbs the collapse process and pattern of the composite strata. The probability and collapse range increase when the tunnel excavation impact zone is connected with the cavity weakening zone. The findings can provide technical support for the collapse prevention and safety control of subway tunnels in composite strata with internal defects.

8 December 2025 in Processes
Verified
Journal Article
Open access
PDF file
XHXusu He
Xusu He
YLYang Liu
Yang Liu
YZYunfei Zheng
Yunfei Zheng
XSXuantao Shi
Xuantao Shi
YCYanhua Cao
Yanhua Cao
SZSulei Zhang
Sulei Zhang
To reduce downtime of the Tunnel Boring Machine and improve construction efficiency of subway tunnels, the tunnel–station synchronous construction method was implemented in the Qingdao metro. In this method, the TBM advanced continuously through the station, while the upper station was excavated in stages using the primary support arch covering technique. Focusing on a construction scheme with low-grade temporary segments, this study develops a three-dimensional numerical model to investigate the mechanical response of shield lining during the simultaneous construction of a subway station and tunnel. The Mohr–Coulomb model and the Elastic model were employed to represent the mechanical behavior of the surrounding rock and support structure, respectively. The deformation, bending moment, axial force, and residual bearing capacity coefficients of the shield lining were systematically examined across six distinct construction stages. The results showed that asymmetric gradual unloading of the surrounding rock at the arch part caused the vertical displacement of the shield lining to be predominantly upward, with a maximum heave of 1.51 mm. Horizontal displacement exhibited significant asymmetry. During station arch excavation, asymmetric unloading led to an increase and clockwise shift in the bending moments of the shield lining. The axial forces transitioned from compression to tension at specific locations (40° and 240°), whereas the removal of temporary supports had only a minor influence. The maximum tensile stress of the shield lining increased by 3.35 times in Stage III and reached 0.69 MPa in Stage V, representing a 1.65-fold increase compared to the previous stage. Although the residual bearing capacity coefficient generally satisfied safety requirements throughout the construction process, it decreased to a minimum of 0.88 in Stage V, a 7% reduction relative to Stage IV, necessitating close monitoring. This study not only confirmed the safety of using temporary segments made of lower-grade concrete (C30) in tunnel–station synchronous construction but also provided valuable insights for optimizing construction schemes and controlling key risks, such as structural deformation, in similarly complex urban environments.