This research aims to bridge the information gap pertaining to the utilization of building information modeling (BIM) in steel building projects. Therefore, a systematic literature review (SLR) was conducted to synthesize the available uses. This research involved three phases—planning, execution, and reporting—according to the PRISMA guide, which includes the main aspects of identification, screening, and eligibility. As a result of the SLR, it is evident how and where BIM facilitates steel building projects, which were grouped into three different categories according to their main BIM topics. One of the uses that stands out as a common denominator across the different processes is “early integration”. Early integration allows for optimization of the design based on existing resources, directly affecting the cost and time of steel building projects in a positive manner.
Construction is a key industry that significantly contributes to the global gross domestic product and generates substantial revenues. However, it faces challenges such as errors and high costs. The aim of this study is to demonstrate the methodology of applying building information modeling integration for the design, fabrication, and erection of steel buildings, called BIM-DFE, in a real-world scenario. This is the first study in which this methodology is applied in an actual case. Two steel building projects with similar design typologies were selected. The first project was executed using computer-aided design and traditional BIM techniques during the planning, design, and fabrication phases. The BIM-DFE methodology was applied to the same phases in the second project. The results of the two projects were compared quantitatively. The experiments suggest that the application of the BIM-DFE methodology reduced the development time in the planning phase, incorporated manufacturing constraints in the design phase, and significantly reduced assembly times in the fabrication phase. This study confirmed the feasibility of applying BIM-DFE methodology in an actual case scenario, which is the result of collaboration between the scientific community and the industry in steel building projects.
This study aims to design a BIM integration model for steel building projects (BIM-DFE). It was developed in the following three phases: (i) theoretical phase, (ii) validation phase, and (iii) statistical analysis for the theoretical phase. A literature review was conducted to study the applications of BIM in steel building projects and to develop an integrated BIM process map for the construction lifecycle of steel buildings. Subsequently, in the validation phase, 32 participants were invited to complete a two-round Delphi questionnaire to validate the BIM-DFE proposal. The participants were classified according to their knowledge level (skilled or expert). Based on the literature review, a process map that integrates BIM in different phases of a steel building project was created. In the first round of the Delphi questionnaire for the validation phase, the various groups studied (skilled vs. expert) were in moderate agreement with the BIM-DFE proposal; however, after the second round, this agreement became better. Therefore, this study contributes to the current body of knowledge by providing a BIM integration model to improve the management of steel building projects as defined by critical stakeholders in the steel industry. In addition, a real-time case is presented to elucidate a part of the research contribution.
15 March 2010 in International Journal of Solids and Structures
La metodología Building Information Modeling (BIM) supone un importante avance cualitativo en el desarrollo de proyectos constructivos, tanto de edificación como de ingeniería civil. Esta metodología se está abriendo paso rápidamente en el ámbito profesional, especialmente en edificación.Con el fin de preparar lo mejor posible al alumnado de cara a su desarrollo profesional, se hace indispensable incluir esta metodología dentro de los estudios relacionados con la ingeniería civil. Sin embargo, son muy pocos los grados o másteres habilitantes relacionados que cubran estas necesidades. La ETSICCP tomó la decisión de incorporar cuatro asignaturas plenamente enfocadas al trabajo en BIM en cuatro titulaciones diferentes (tres de ellas habilitantes), impartiéndose por primera vez en el curso 2018/19.En esta comunicación se presenta el desarrollo de contenidos y metodología docente para estas cuatro asignaturas, destacando las oportunidades y dificultades en su implantación, así como los primeros resultados obtenidos.