Bermawi Priyatna Iskandar

Prof. Dr. Bermawi Priyatna Iskandar

orcid

Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications

19 March 2018 in IOP Conference Series: Materials Science and Engineering
Verified
Conference Paper
Open access
PDF file
BIBermawi Priyatna Iskandar
Bermawi Priyatna Iskandar
RWR Wangsaputra
R Wangsaputra
UPU S Pasaribu
U S Pasaribu
HHHennie Husniah
Hennie Husniah
In the last two decades, the business of lease products (or equipment) has grown significantly, and many companies acquire equipment through leasing. In this paper, we propose a new lease contract under which a product (or equipment) is leased for a period of time with maximum usage per period (e.g. 1 year). This lease contract has only a time limit but no usage limit. If the total usage per period exceeds the maximum usage allowed in the contract, then the customer (as a lessee) will be charged an additional cost. In general, the lessor (OEM) provides a full coverage of maintenance, which includes PM and CM under the lease contract. It is considered that the lessor offers the lease contract for a remanufactured product. We presume that the price of the lease contract for the remanufactured product is much lower than that of a new one, and hence it would be a more attractive option to the customer. The decision problem for the lessee is to select the best option offered that fits to its requirement, and the decision problem for the lessor is find the optimal maintenance efforts for a given price of the lease option offered. We first find the optimal decisions independently for each party, and then the joint optimal decisions for both parties.

25 August 2018
Verified
Book Chapter
Closed access
PDF file
HHH. Husniah
H. Husniah
UPU. S. Pasaribu
U. S. Pasaribu
BIBermawi Priyatna Iskandar
Bermawi Priyatna Iskandar

27 October 2019
Verified
Book Chapter
Closed access
PDF file
HHHennie Husniah
Hennie Husniah
ACAndi Cakravastia
Andi Cakravastia
BIBermawi Priyatna Iskandar
Bermawi Priyatna Iskandar

23 September 2024 in Polymers
Verified
Journal Article
Open access
PDF file
Yogi Hendra AgustionYogi Hendra Agustion
Yogi Hendra Agustion
SCShia-Chung Chen
Shia-Chung Chen
CFChing-Te Feng
Ching-Te Feng
BIBermawi Priyatna Iskandar
Bermawi Priyatna Iskandar
Microcellular injection molding (MuCell®) using supercritical fluid (SCF) as a foaming agent to achieve weight reduction has become popular in carbon emission reduction. In the typical MuCell® process, SCF N2 is commonly used. Although SCF CO2 exhibits high solubility and can achieve a high weight reduction, controlling the foaming is not easy, and its foaming cells are usually larger and less uniform, which limits its industrial application. Our previous studies have shown that gas counter pressure (GCP) can improve the foaming quality effectively. Here, we investigated whether or not the CO2 SCF foaming quality could be improved, and weight reduction was achieved for polycarbonate (PC) material. This is quite important for the electronics industry, in which most of the housing for devices is made of PC materials. MuCell® was subjected to molding experiments using the parameters of the SCF dosage, melt temperature, mold temperature, and injection speed. The results revealed that using CO2 gas for the PC material can reduce the size of microcellular cells to 40 µm and increase the cell densities to 3.97 × 106 cells/cm3. Using GCP significantly improved the microcellular injection-molded parts by reducing the cell size to 20.9 µm (a 45.41% improvement) and increasing the cell density to 8.04 × 106 cells/cm3 (a 102.48% improvement). However, implementing GCP may slightly decrease the target weight reduction. This study reveals that microcellular injection molding of PC parts using SCF CO2 can achieve high-quality foaming and reduce the weight by about 30%.

3 April 2023 in International Journal of Technology
Verified
Journal Article
Closed access
NSNur Faizatus Sa'idah
Nur Faizatus Sa'idah
ACAndi Cakravastia
Andi Cakravastia
UPUdjianna Sekteria Pasaribu
Udjianna Sekteria Pasaribu
BIBermawi Priyatna Iskandar
Bermawi Priyatna Iskandar
In this paper, we study a two- dimensional Maintenance Service Contract (MSC) characterized by two limits (dimensions) of age and usage. It is considered that an agent offers a two-dimensional MSC by guaranteeing a certain level of equipment available to consumers. The agent needs to reduce the total maintenance cost to offer competitive MSC prices. Preventive maintenance actions (PM) are periodically carried out, and each PM action is considered to improve reliability modeled by reducing the failure rate function. Two decision variables (the PM interval (T) and the reduction in the intensity function are obtained by considering two performance measures that are relevant to agents and consumers (i.e., availability and total maintenance cost). A numerical example is presented by considering three types of equipment usage rates: low, medium, and high. The optimization of the two performance measures can ensure availability targets and, at the same time, minimize total maintenance costs.