Cut blasting is one of the most essential processes to reduce blast-induced vibration in tunnel blasting. The long and large-diameter uncharged hole boring (LLB) method is an example of one of the cut blasting methods, which utilizes large-diameter uncharged holes drilled in the tunnel face. In this study, blasting simulations were performed to analyze its blasting mechanism, and the LLB method and the traditional burn-cut method were simulated to compare their blasting efficiency. A 3D numerical analysis using LS-DYNA code, a highly non-linear transient dynamic finite element analysis using explicit time integration, was used to simulate the blasting process, and a Johnson–Holmquist constitutive material model, which is optimal for simulating brittle materials under dynamic conditions, was used to simulate the rock behavior under blasting. The modified LLB method showed a 3.75-fold increase in the advance per round compared to the burn-cut method, due to the increased formation of long and large-diameter uncharged holes compared to blast holes. This modified LLB method used 30% less explosives, so its failure range was approximately 1.25 times less than that of the burn-cut method, but its advance was approximately 4 times larger than the burn-cut method, which was similar to the original LLB method. This confirmed that the modified LLB method is significantly more efficient in terms of increased blasting efficiency (particularly the advance per round) as well as reduced blast-induced vibration, compared to the traditional cut blasting method.
26 March 2024 in Tunnelling and Underground Space Technology
To mitigate unforeseen incidents, such as key block failure or tunnel collapse during excavation, an appropriate support pattern that correlates with the geological conditions of the rock mass at the tunnel face should be designed. Rock mass evaluations should be conducted through geological face mapping during the construction phase, alongside predictions based on field investigations during the design phase. When marked discrepancies are identified, it is customary to convene an on-site evaluation involving a committee of experts. This study develops a digital tunnel face mapping system that utilises mobile devices to facilitate online evaluations during the construction phase. This system effectively replaces the traditional on-site field evaluation method. Tunnel face mapping can be promptly accomplished using images captured at the excavation face, enabling rapid analysis. In conjunction with the mapping capabilities, the developed system was designed to digitally store geological information, which includes parameters such as rock strength distribution, the spacing and length of discontinuities observed during the mapping process, as well as data pertaining to weathering and the groundwater conditions of those discontinuities. This information was then correlated with the rock mass rating sheet to automate the determination of ratings for each parameter, ultimately leading to a conclusive classification of the rock mass quality. By employing this system for tunnel face mapping and rock quality evaluation, we significantly reduced the discrepancies in the evaluation results that often arise due to the subjective judgement of geologists, as well as human errors that can occur throughout the rating process.
20 November 2025 in Tunnelling and Underground Space Technology