Robert Lopez

Dr. Robert Lopez

orcid

Research Focus & Metrics

Academic Career Length

17Years (2010-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2016 in Journal of Management in Engineering
Verified
Journal Article
Closed access
Heap-Yih ChongHeap-Yih Chong
Heap-Yih Chong
RLRobert Lopez
Robert Lopez
JWJun Wang
Jun Wang
XWXiangyu Wang
Xiangyu Wang
ZZZeyu Zhao
Zeyu Zhao
The uses of building information modeling (BIM) in building and infrastructure projects are numerous. Most previous BIM case examples focused on buildings, and limited studies have reported on the adoption and use of BIM in infrastructure projects. Therefore, this research aims to analyze and compare the adoption and use of BIM in infrastructure projects, particularly in constructing major road projects in Australia and the People’s Republic of China. The related BIM uses and associated technologies of the projects were analyzed based on a case study approach. Subsequently, a number of comparative analyses were conducted on the cultural and managerial aspects between the projects, as well as different BIM uses between buildings and infrastructure projects. The results show both case studies had quite similar uses of BIM, yet the adopted managerial strategies and issues encountered were rather different. The evolution of BIM uses from buildings to infrastructure projects is also discussed. The rese...

1 August 2010 in Journal of Performance of Constructed Facilities
Verified
Journal Article
Closed access
RLRobert Lopez
Robert Lopez
PLPeter Love
Peter Love
David John EdwardsDavid John Edwards
David John Edwards
PDPeter R. Davis
Peter R. Davis
Construction and engineering practitioners have found it increasingly difficult to learn from their mistakes, particularly with regard to the prevention, identification and/or containment of design errors. Yet, design errors have been the root cause of numerous catastrophic accidents that have resulted in the death and injury of workers and members of the public. This paper examines and classifies the nature of error and design error causation in construction and engineering projects. A review of the normative literature revealed that design errors are caused by an array of factors that can work interdependently. A generic framework is developed that classifies design error according to people, the organization, and project is presented. The paper suggests that people, over and above organizational and project management strategies, have the greatest propensity to reduce errors through the process of situated learning and knowing. This is because the working environment provided by an organization and the...

1 May 2012 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
RLRobert Lopez
Robert Lopez
PLPeter Love
Peter Love
Design errors can adversely influence project performance and can contribute to failures, accidents, and loss of life. Although there has been a considerable amount of research that has examined design error causation, little is known about design error costs. With increasing emphasis placed on the use of nontraditional forms of procurement methods as a result of various government reports and the advent of Building Information Modelling there is a general perception that design error costs will be significantly less than those projects procured by traditional means. By using a questionnaire survey, estimates for design error costs were obtained from 139 projects. The mean direct and indirect costs for design errors were revealed to be 6.85 and 7.36% of contract value, respectively. Design error costs were found not to significantly vary with procurement method and project type used. Although the research provides invaluable insights into practitioners’ perceptions of design errors costs, their ac...

1 September 2012 in Accident Analysis & Prevention
Verified
Journal Article
Closed access
PLPeter Love
Peter Love
RLRobert Lopez
Robert Lopez
DEDavid J. Edwards
David J. Edwards
YGYang M. Goh
Yang M. Goh

1 July 2013 in Structure and Infrastructure Engineering
Verified
Journal Article
Closed access
PLPeter Love
Peter Love
RLRobert Lopez
Robert Lopez
David John EdwardsDavid John Edwards
David John Edwards
Design errors can severely jeopardise safety and contribute to failures in construction and engineering projects. Such failures can have devastating economic, environmental and social consequences. Significant efforts have been made to reduce the incidence of failures through learning from previous disasters and events by modifying building and engineering codes and standards accordingly. Design errors, however, remain an innate feature of construction and engineering projects despite the considerable amount of knowledge that has been accumulated to date. Most errors are identified during construction and require rework, but there is always a potential for some to remain undetected and contribute to failure, and as a result potentially contribute to accidents and loss of life. An examination of the literature research suggests that a series of pathogenic influences contribute to errors and failure. Thus, this paper article examines the circumstances and issues that contributed to a series of construction and engineering failures to enable development of a learning framework that can be used to mitigate design errors and potential failures and accidents.

19 July 2022 in Buildings
Verified
Journal Article
Open access
PDF file
RLRobert Lopez
Robert Lopez
Heap-Yih ChongHeap-Yih Chong
Heap-Yih Chong
Conrad PereiraConrad Pereira
Conrad Pereira
Limited empirical and qualitative studies focus on the detailed processes and obstacles for coordinating off-site prefabrication between builders and suppliers. This research aims to identify and address the obstacles that currently prevent the further expansion of off-site prefabrication, with a research scope on timber and mechanical/electrical/plumbing (MEP) services in construction projects. The focal point of this research is to highlight their obstacles. A total of forty interviews were conducted and analyzed from four builders’ organizations and four suppliers’ organizations to ascertain their obstacles in coordinating the practice of off-site prefabrication. The results found the builder’s obstacles were sustainability, quality assurance (QA), mass production, CAD/BIM, technological support, commercial arrangements, system building, buffering in supply, schedule monitoring, productivity, flexibility, engagement, risks, and multiple supply arrangements. The supplier’s obstacles were design, financing and subcontracting, coordination, recognized practices, risks, multiple supply arrangements, and constraints. Moreover, the builders and suppliers had identified some ways to harmonize off-site prefabrication of timber. Some examples of timber prefabrication technology include joinery, doors and/or windows, structural floor/wall/roof frames, partitions, trusses, stairs, balustrades, and others. MEP services with in situ construction comprise the use of power sources and working coordination. The most important outcome of this investigation is that these obstacles can be addressed through collaboration and coordination. This is because there is a traditionally a lack of collaboration amongst builders and their suppliers. Furthermore, there is a lack of coordination between them in general. The research contributes to the improved timber and MEP services collaboration and coordination in off-site prefabrication, which can be referred to by other approaches of modular construction.