Heap-Yih Chong

Prof. Dr. Heap-Yih Chong

Curtin University, Perth, Western Australia, Australia
+1
orcid

Research Focus & Metrics

Academic Career Length

17Years (2010-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2017 in Journal of Cleaner Production
Verified
Journal Article
Closed access
Heap-Yih ChongHeap-Yih Chong
Heap-Yih Chong
CLCen-Ying (Celine) Lee
Cen-Ying (Celine) Lee
XWXiangyu Wang
Xiangyu Wang

20 July 2015 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
JRJohn Rogers
John Rogers
Heap-Yih ChongHeap-Yih Chong
Heap-Yih Chong
Christopher Nigel PreeceChristopher Nigel Preece
Christopher Nigel Preece
Purpose: – Building Information Modelling (BIM) technology has been well received by the Malaysian construction industry, yet the adoption rate is extremely slow. Many areas of adoption issues and know how regarding BIM were investigated. However, no prior research has considered the perspective from engineering consulting services (ECS) firms. Therefore, the purpose of this paper is to explore the overview and adoption of BIM from the perspective of Malaysian ECS firms, with its objectives first, to determine the perceptions, barriers, governmental support and intentions in adopting BIM, and second, to identify the key drivers for adopting BIM within two years.Design/methodology/approach: – The primary data were collected from focus group interview and questionnaire survey to achieve the first objective, and subsequently, the second objective was achieved based on Pearson relationship analysis.Findings: – The results show that the firms have a concept of BIM that equates to industry authorities’ norms; yet the lack of well-trained personnel, guidance and governmental supports were identified as the main barriers to adoption. Nevertheless, the firms were prepared to adopt BIM where market demands and competitive advantage were the main drivers to adoption within two years.Originality/value: – A different perspective has been highlighted in adoption of BIM. It renders a new insight into the effective adoption and use of BIM from the ECS firms’ perspective.

16 February 2017 in Sustainability
Verified
Journal Article
Open access
PDF file
Ting-Kwei WangTing-Kwei Wang
Ting-Kwei Wang
QZQian Zhang
Qian Zhang
Heap-Yih ChongHeap-Yih Chong
Heap-Yih Chong
XWXiangyu Wang
Xiangyu Wang
Construction supply chain management is a unique and problematic issue within the construction industry due to its inevitable external risks and variations. The resilience capability of a supplier is of significance in supplier selection; a supplier selected in the context of a resilient construction supply chain (RCSC) is referred to in this research as a “resilient construction supplier”. This paper proposes a supplier selection framework tailored to effective information integration for supply chain management. The proposed framework works by integrating building information modeling (BIM) and a geographic information system (GIS) in a RCSC. BIM and GIS together provide highly transparent construction material information, enhanced supply chain status visualization, and workable access information for supplier selection. Supplier performance is evaluated via seventeen resilient criteria under a combined methodology consisting of the analytic hierarchy process (AHP) and grey relational analysis (GRA); AHP and GRA weigh the criteria and rank the suppliers respectively. By varying the weightings given to each criterion, sensitivity analysis was conducted to identify the criteria of resilience which impact the selection priorities of suppliers. An illustrative example is also provided to show the overall process of the proposed framework.

1 February 2017 in Renewable and Sustainable Energy Reviews
Verified
Journal Article
Closed access
PWPeng Wu
Peng Wu
Yongze SongYongze Song
Yongze Song
WSWENCHI SHOU
WENCHI SHOU
HCHunglin Chi
Hunglin Chi
Heap-Yih ChongHeap-Yih Chong
Heap-Yih Chong
MSMonty Sutrisna
Monty Sutrisna

1 November 2016 in Journal of Management in Engineering
Verified
Journal Article
Closed access
Heap-Yih ChongHeap-Yih Chong
Heap-Yih Chong
RLRobert Lopez
Robert Lopez
JWJun Wang
Jun Wang
XWXiangyu Wang
Xiangyu Wang
ZZZeyu Zhao
Zeyu Zhao
The uses of building information modeling (BIM) in building and infrastructure projects are numerous. Most previous BIM case examples focused on buildings, and limited studies have reported on the adoption and use of BIM in infrastructure projects. Therefore, this research aims to analyze and compare the adoption and use of BIM in infrastructure projects, particularly in constructing major road projects in Australia and the People’s Republic of China. The related BIM uses and associated technologies of the projects were analyzed based on a case study approach. Subsequently, a number of comparative analyses were conducted on the cultural and managerial aspects between the projects, as well as different BIM uses between buildings and infrastructure projects. The results show both case studies had quite similar uses of BIM, yet the adopted managerial strategies and issues encountered were rather different. The evolution of BIM uses from buildings to infrastructure projects is also discussed. The rese...

28 September 2014 in Journal of Intelligent & Robotic Systems
Verified
Journal Article
Closed access
PDF file
JWJun Wang
Jun Wang
WSWeizhuo Sun
Weizhuo Sun
WSWENCHI SHOU
WENCHI SHOU
XWXiangyu Wang
Xiangyu Wang
CWChangzhi Wu
Changzhi Wu
CSCenfei Sun
Cenfei Sun