To study the influence of the laser power, scanning speed, and cleaning water content on the laser cleaning effect and obtain the best cleaning parameters, this paper conducted a simulation analysis of the laser cleaning process and carried out a pulse laser cleaning of porcelain insulators experiment to verify. The results show that the cleaning rate gradually increases as the laser power increases from 20 W to 25 W. As the scanning speed increases from 1000 mm/s to 2500 mm/s, the laser overlapping rate gradually decreases, and the cleaning takes the lead in increasing and then decreasing. The appropriate cleaning water content is conducive to laser cleaning; when the water content is 0.115 g, the cleaning efficiency reaches the highest value of 98.20%. When the laser power is 25 W, and the scanning speed is 2000 mm/s, the cleaning efficiency can reach the highest value of 96.87%. This paper shows that the reasonable choice of cleaning parameters can effectively clean the insulator surface filth and obtain a better surface morphology.
The high amplitude and steep overvoltage generated by the breaking of the vacuum circuit breaker in the wind farm damages the inter-turn insulation of the transformer. There is a certain difference between the simulation results of the traditional reignition model and the measured overvoltage. It is necessary to improve the simulation model to simulate the overvoltage condition of the transformer more accurately and then select appropriate overvoltage protection measures. In this paper, based on the physical process of dielectric recovery during the opening process of the vacuum circuit breaker, a model of dielectric strength recovery is built to simulate the arc reignition of the vacuum circuit breaker. The model was applied to compare the overvoltage protection effects of RC snubbers, surge arresters, and choke coils. The simulation results show that the overvoltage amplitude and reignition times calculated by the model proposed in this paper are closer to the measured values. Compared with the traditional linear curve reignition model, the accuracy was increased by 24% and 51.2%, respectively. The parameter value of RC snubbers, the connection mode of surge arresters, and the combination mode of choke coil have an influence on overvoltage suppression. Finally, a suitable suppression scheme is proposed by installing a combined arrester on the high-voltage side of the transformer and connecting a choke coil in series, which can limit the phase-to-ground voltage and the phase-to-phase voltage to 2.43 p.u and 3.24 p.u, respectively, and reduce the steepness from 157.2 kV/μs to 22.3 kV/μs.
Most of the previous literatures of the transmission line inspection robot along the ground wire tend to focus on the obstacle‐surmounting method and motion characteristics. There is less research on the mechanics calculation of the corresponding ground wire. Most of the existing robots are designed with the wheel‐claw mechanism. There is less research on other types of robots. A caterpillar track robot along the ground line is designed in this study. The optimisation design of the obstacle‐surmounting method is carried out. The typical 500 kV transmission line model is established. The stress of the ground wire in the process of robot moving along the ground wire is calculated and analysed under different control climate conditions with the help of the finite element method. The results show that the stress of the ground line has a certain safety margins. However, it may exceed the safety range under harsh climate conditions when the transmission line has heavy gradient. The inspection robot operations need reasonable planning according to the calculation results and the transmission line conditions.
With the continuous expansion of urban cable scale and the increase in service time, the fire accident risk of cable tunnels also increases. Defects in the configuration of fire prevention measures lead to many fire accidents and seriously affect the reliability of power supply. First, the detection data of a typical tunnel fire accident are analyzed in this study. The results show that the main problems are the unreasonable installation position of fire extinguishers, the lack of fire prevention measures between intermediate joints, and the insufficient fire prevention performance of interlayer fire barriers. Then, the field test of cable tunnel fire is carried out in a cable tunnel to be put into operation. The test data show that the high-temperature area is mainly concentrated on the top of the tunnel, and the insufficient suspension height of the fire extinguisher will affect the trigger time. The energy of a short circuit accident is large, the cable burns and spreads rapidly, and the delayed triggering may lead to large fire to extinguish effectively. Comparing the simulation and test results of abnormal characteristic parameters in fire, the temperature error is less than 4%. The fire power development curve is obtained through simulation, and the burner power is set to test the fire prevention and extinguishing devices. Finally, the optimal configuration scheme of the fire anomaly data detection equipment and fire-extinguishing products is proposed. The temperature drop rate increases by 135%.