Byung Gyoo Kang

Dr. Byung Gyoo Kang


Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
31 July 2018 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
RJRuoyu Jin
Ruoyu Jin
TYTong Yang
Tong Yang
Poorang PiroozfarPoorang Piroozfar
Poorang Piroozfar
BKByung Gyoo Kang
Byung Gyoo Kang
Dariusz WanatowskiDariusz Wanatowski
Dariusz Wanatowski
LTLlewellyn Tang
Llewellyn Tang
Purpose: The purpose of this paper is to present a pedagogical practice in the project-based assessment of architectural, engineering and construction (AEC) students’ interdisciplinary building design work adopting BIM. This pedagogical practice emphasizes the impacts of BIM, as the digital collaboration platform, on the cross-disciplinary teamwork design through information sharing. This study also focuses on collecting students’ perceptions of building information modeling (BIM) effects in integrated project design. Challenges in BIM adoption from AEC students’ perspective were identified and discussed, and could spark further research needs. Design/methodology/approach: Based on a thorough review of previous pedagogical practices of applying BIM in multiple AEC disciplines, this study adopted a case study of the Solar Decathlon (SD) residential building design as the group project for AEC students to deliver the design work and construction planning. In total 13 different teams within the University of Nottingham Ningbo China, each group consisting of final year undergraduate students with backgrounds in architecture, civil engineering, and architectural environmental engineering, worked to deliver the detailed design of the solar-powered residential house meeting pre-specified project objectives in terms of architectural esthetics, structural integrity, energy efficiency, prefabrication construction techniques and other issues such as budget and scheduling. Each team presented the cross-disciplinary design plan with cost estimate and construction scheduling together within group reports. This pedagogical study collected students’ reflective thinking on how BIM affected their design work, and compared their feedback on BIM to that from AEC industry professionals in previous studies. Findings: The case study of the SD building project showed the capacity of BIM in enabling interdisciplinary collaboration through information exchange and in enhancing communication across different AEC fields. More sustainable design options were considered in the early architectural design stages through the cross-disciplinary cooperation between architecture and building services engineering. BIM motivated AEC student teams to have a more comprehensive design and construction plan by considering multiple criteria including energy efficiency, budget, and construction activities. Students’ reflections indicated both positive effects of BIM (e.g. facilitating information sharing) as well as challenges for further BIM implementation, for example, such as some architecture students’ resistance to BIM, and the lack of existing family types in the BIM library, etc. Research limitations/implications: Some limitations of the current BIM pedagogy were identified through the student group work. For example, students revealed the problem of interoperability between BIM (i.e. Autodesk Revit) and building energy simulation tools. To further integrate the university education and AEC industry practice, future BIM pedagogical work could recruit professionals and project stakeholders in the adopted case studies, for the purpose of providing professional advice on improving the constructability of the BIM-based design from student work. Practical implications: To further integrate the university education and AEC industry practice, future BIM pedagogical work could recruit professionals and project stakeholders in the adopted case study, for the purpose of providing professional advice in improving the constructability of the BIM-based design from student work. Originality/value: This work provides insights into the information technology applied in the AEC interdisciplinary pedagogy. Students gained the experience of a project-based collaboration and were equipped with BIM capabilities for future employment within the AEC job market. The integrated design approach was embedded throughout the team project process. Overall, this BIM pedagogical practice emphasized the link between academic activities and real-world industrial practice. The pedagogical experience gained in this BIM course could be expanded to future BIM education and research in other themes such as interoperability of building information exchange among different digital tools.

1 November 2018 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
JXJie Xu
Jie Xu
RJRuoyu Jin
Ruoyu Jin
Poorang PiroozfarPoorang Piroozfar
Poorang Piroozfar
YWYibin Wang
Yibin Wang
BKByung Gyoo Kang
Byung Gyoo Kang
TYTong Yang
Tong Yang
BIM has been undergoing continuous growth in the global architecture, engineering, and construction (AEC) industry. However, knowledge development within BIM management is lagging behind its implementation. This study initiates a BIM management–based framework involving BIM climate, which is measured by individual BIM practitioners’ perceptions. Subgroup comparison is highlighted in measuring perceptions. Regional variance in BIM climate is addressed in applying the framework by adopting an empirical case study within the context of China’s AEC industry. The case study uses Shanghai and Wenzhou, which represent a BIM-leading metropolitan city and a BIM-developing counterpart, respectively, for the comparative analysis of BIM climate. Based on data collected from a questionnaire survey sent to BIM practitioners from these two cities, it is revealed that Shanghai, as the BIM-leading city in China, has somewhat significant differences in BIM climate compared with Wenzhou. For example, Shanghai BIM practitioners perceive fewer challenges in BIM training, but higher risk in adopting BIM technology. This study contributes to both academic work and practice in BIM based on its initiation of the concept of BIM climate and the case study of BIM-climate comparison. Academically, this holistic study proposes the BIM management–related knowledge framework aiming to fill the knowledge gap in BIM climate and culture, and it could be further applied in subclimates and subcultures within BIM. Practically, the case study provides insights to stakeholders regarding regional variations in BIM climate when promoting BIM practice or establishing BIM guidelines.

1 December 2017 in IOP Conference Series: Materials Science and Engineering
Verified
Conference Paper
Open access
PDF file
BKByung Gyoo Kang
Byung Gyoo Kang
KLKaiwen Long
Kaiwen Long
CZCheng Zhang
Cheng Zhang
JHJian Li Hao
Jian Li Hao

4 October 2023
Verified
Book Chapter
Closed access
PDF file
BCBaotian Chang
Baotian Chang
BKByung Gyoo Kang
Byung Gyoo Kang
NZNan Zhang
Nan Zhang