The reasonable delay time of millisecond-delay blasting using digital electronic detonators can significantly reduce the vibration effects induced by tunnel blasting. This study proposes a method for calculating the delay time for cut holes, easer holes and periphery holes, considering the rocks breaking effect as well as wave superposition theory. And then according to the actual layout diagram of the tunnel holes, the delay time calculation formulas of different holes are put forward. Then the delay times were calculated according to the formulas and applied in the field tests. The velocities, rocks breaking and wave superposition cancellation of the vibration using different delay times are analyzed with digital electronic detonators. Then the optimum delay times of different holes were obtained and applied to New Hongyan tunnel project. The velocity and frequency of the vibration with digital electronic detonators are analyzed, compared with non-electronic detonators. The effects of charge and delay time on the velocity and principal frequency of a blasting seismic wave are discussed. The results indicate that the delay time for the holes must be prioritized to achieve breaking effects in the rock with the simultaneous formation of a new free surface, next considering the wave superposition cancellation. When the delay time of cut holes was 5 ms, the rocks breaking effect and wave superposition cancellation effect both worked well. The velocity of the vibration induced by the cut holes blasting was about only 0.46–0.51 cm/s. When the delay time was 6 ms or much longer, the rocks breaking effect would fail. With regard to the easer holes and periphery holes, the optimum delay time of them were all 5ms. The vertical peak particle velocity was reduced from 2.974 cm/s to 0.901 cm/s with digital electronic detonators. Therefore, the velocity had decreased by 69.70% than non-electronic detonators, which was caused by reducing the single simultaneous explosive charge and setting optimum delay time. The proposed delay time calculation method is demonstrated to be sufficiently accurate and can thus be used as a guideline to reduce tunnel blasting vibrations.
1 December 2023 in Frontiers of Structural and Civil Engineering
The artificial freezing method can effectively improve the stability of strata and provide favorable conditions for the construction safety of shield tunnel in water-rich strata. Based on the frozen shield tunneling project of a metro station, which is close to important buildings, a reasonable freezing method and parameters are proposed in this paper. The simulation model was established by using Plaxis 3D finite element software (Version 2017). The numerical model was verified based on a large amount of field data. The characteristics of segment deformation, ground surface settlement and vertical displacement of buildings were compared between frozen layer and nonfrozen layer during shield tunnel excavation. It was found that segment deformation in the nonfrozen layer is three times that in the frozen layer. The surface settlement above the frozen layer is less than 2 mm. Expansion excavation of shield tunnel was carried out to meet the space function of subway station using artificial freezing method. The deformation of frozen layer was compared between full section excavation and partial excavation. It was found that the deformation of the former is 4.5 times that of the latter, so the partial excavation was chosen as the main research object. Subsequently, the characteristics of vertical displacement and surface settlement of buildings under partial excavation were studied. It was found that the vertical settlement of buildings away from the frozen layer is greater than that of buildings near the frozen layer. All settlement values meet the requirements, thus ensuring the feasibility of partial excavation and ensuring the safety of construction.
Damage characteristics and dynamic stress response of aging masonry structures for blast‐induced ground motion were performed using high‐order local modal analysis method. A complete investigation of damage types and locations of aging masonry buildings due to tunnel blasting vibration were performed by on‐site survey. A typical 2‐storey aging masonry building located above a tunnel was selected for dynamic response analysis. The experimental dynamic characteristics of the structure were determined by using the operational modal analysis (OMA) method. Finite element models for the masonry structures were updated by modifying material parameters based on OMA results. The first five natural frequencies of the updated finite element models ranged from 8.80–24.99 Hz, and the first five modes were global modes. The sixth to twentieth natural frequencies ranged from 26.10–36.34 Hz, and the sixth to twentieth modes were local modes whose deformation was greater than the global deformation. Since the principal frequencies of the tunnel blast vibration were mostly higher than the natural global modes’ frequencies and were much closer to the natural frequencies of local members, local members experienced more intensive vibrations compared to the main body structure. The principal compressive stress (PCS) and principal tensile stress (PTS) of local members were several times greater than that of the main body structure. Therefore, local members of the masonry building suffered most from the tunnel blasting vibration. Corners due to stress concentration, the contact area between brick and concrete, local members, and precast floor seams are prone to damage during tunnel blasting. With the vibration velocity increasing, the PCS and PTS of local members gradually increase. But, the PTS ratio of local members decreases with the increase of peak particle velocities. The dynamic response analysis result and the damage locations using high‐order local modal analysis method are in accordance with the damage found at the site.
When shield machine traverses through hard rock mass, disc cutters will be abraded to different degrees. Excessive height difference exists between adjacent disc cutters, which critically affects the rock‐breaking efficiency. Relying on a shield section of hard rock mass in Qingdao, the disc cutter abrasions are measured on site, and the reason for low construction efficiency is analysed. Subsequently, the discrete element method is used to study the rock‐breaking law under different height differences of disc cutters. The ultimate cutter height difference for rock breaking is obtained. According to this, the cutter adjustment scheme is proposed to reduce the cutter height differences on site. Comparing shield tunnelling parameters before and after the cutter adjustment, it is found that the construction efficiency is significantly improved. The results are of great significance for improving the rock‐breaking efficiency and increasing advancing speed of shield in hard rock mass.