Huawei Tong

Huawei Tong


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
27 October 2022 in Buildings
Verified
Journal Article
Open access
PDF file
JCJian Chen
Jian Chen
HTHuawei Tong
Huawei Tong
JYJie Yuan
Jie Yuan
YFYingguang Fang
Yingguang Fang
RGRenguo Gu
Renguo Gu
Clay soil is a common building foundation material, and its permeability is very important for the safety of foundation pits and the later settlement of buildings. However, the traditional Kozeny-Carman (K-C) equation shows serious discrepancies when predicting the permeability of clay in building foundation treatment. Therefore, solving the application of K-C equation in clay is a problem faced by the engineers and scholars. In this paper, the influence of clay mineralogy on pore structure and permeability is analyzed, and then the effective e (eeff) and effective SSA (Seff) are proposed. Based on the eeff and Seff, the permeability prediction model modified on Kozeny-Carman is built. Then, seepage experiments are conducted on two types of clay samples to test this prediction model; at the same time, the MIP combining freeze-drying methods are used to obtain the Seff and eeff. Through the discussion of the test results, three main conclusions are obtained: (1) there are invalid pores in clay due to the influence of clay mineral, this is the reason for which K-C equation is unsuitable for clay; (2) the eeff and Seff can reflect the structural state of clay during seepage; (3) the results of the permeability prediction model in this paper agree well with the test results, which indicates that this prediction model is applicable to clay. The research results of this paper are significant to solve the academic problem that K-C equation is not applicable to clay and significant to ensure the safety of building foundation pits in clay areas.

7 January 2021 in Materials
Verified
Journal Article
Open access
PDF file
JZJitong Zhao
Jitong Zhao
HTHuawei Tong
Huawei Tong
Yi ShanYi Shan
Yi Shan
Jie YuanJie Yuan
Jie Yuan
QPQiuwang Peng
Qiuwang Peng
JLJunling Liang
Junling Liang
Microbial-induced calcite precipitation (MICP) has been a promising method to improve geotechnical engineering properties through the precipitation of calcium carbonate (CaCO3) on the contact and surface of soil particles in recent years. In the present experiment, water absorption and unconfined compressive strength (UCS) tests were carried out to investigate the effects of three different fiber types (glass fiber, polyester fiber, and hemp fiber) on the physical and mechanical properties of MICP-treated calcareous sand. The fibers used were at 0%, 0.10%, 0.15%, 0.20%, 0.25%, 0.30%, 0.35%, and 0.40% relative to the weight of the sand. The results showed that the failure strain and ductility of the samples could be improved by adding fibers. Compared to biocemented sand (BS), the water absorption of these three fiber-reinforced biocemented sands were, respectively, decreased by 11.60%, 21.18%, and 7.29%. UCS was, respectively, increased by 24.20%, 60.76%, and 6.40%. Polyester fiber produced the best effect, followed by glass fiber and hemp fiber. The optimum contents of glass fiber and polyester fiber were 0.20% and 0.25%, respectively. The optimum content of hemp fiber was within the range of 0.20–0.25%. Light-emitting diode (LED) microscope and scanning electron microscope (SEM) images lead to the conclusion that only a little calcite precipitation had occurred around the hemp fiber, leading to a poor bonding effect compared to the glass and polyester fibers. It was therefore suggested that polyester fiber should be used to improve the properties of biocemented sand.

12 January 2022 in International Journal of Civil Engineering
Verified
Journal Article
Closed access
PDF file
Jie YuanJie Yuan
Jie Yuan
DLDonglin Lei
Donglin Lei
Yi ShanYi Shan
Yi Shan
HTHuawei Tong
Huawei Tong
XFXiaotian Fang
Xiaotian Fang
JZJitong Zhao
Jitong Zhao

25 November 2024 in Buildings
Verified
Journal Article
Open access
PDF file
HWHui Wang
Hui Wang
XLXinlong Li
Xinlong Li
WWWeilong Wen
Weilong Wen
GLGaoyu Liu
Gaoyu Liu
JCJian Chen
Jian Chen
HTHuawei Tong
Huawei Tong
In the context of urban space constraints, subway and underground projects have become crucial strategies to alleviate urban congestion and enhance residents’ quality of life. However, pit engineering, a frequent accident area in geotechnical engineering, urgently requires innovative safety monitoring technologies. Traditional monitoring methods face challenges such as high labor costs, lengthy monitoring cycles, high-risk working environments, and over-reliance on human judgment. To address these issues, this paper introduces an innovative monitoring system integrating Fiber Bragg Grating (FBG) sensing technology based on a subway pit project in Guangzhou. This system not only achieves fully automated data acquisition but also includes an intelligent monitoring cloud platform, providing unprecedented automated and intelligent monitoring solutions for support structures and the surrounding environment during mechanical shaft construction. The key findings of this paper include the following: (1) The breakthrough application of distributed optical fiber monitoring technology, including successfully deploying this advanced technology in complex pit engineering environments, enabling the precise and continuous monitoring of support structures and surrounding changes, and demonstrating its high effectiveness and intelligence in practical engineering. (2) The innovative design of an intelligent safety monitoring system. By integrating sensors and wireless communication technology, an efficient data networking architecture is constructed, supporting remote configuration and flexible adjustment of monitoring equipment, significantly enhancing data collection‘s real-time performance and continuity while greatly reducing safety risks for field staff, achieving an intelligent upgrade of monitoring work. (3) Comprehensive and accurate empirical analysis. During shaft excavation, the monitoring data collected by the system were stable and reliable, with all indicators maintained within reasonable ranges and closely matching expected changes caused by construction activities, validating the system’s practical application effectiveness in complex construction environments and providing a scientific basis for pit engineering safety management.

3 January 2025 in Buildings
Verified
Journal Article
Open access
PDF file
JLJianwang Li
Jianwang Li
WQWenrui Qi
Wenrui Qi
XLXinlong Li
Xinlong Li
GLGaoyu Liu
Gaoyu Liu
JCJian Chen
Jian Chen
HTHuawei Tong
Huawei Tong
Currently, subway and underground engineering projects are vital for alleviating urban congestion and enhancing citizens’ quality of life. Among these, excavation engineering for foundation pits involves the most accidents in geotechnical engineering. Although there are various construction methods, most face issues such as a large footprint, high investments, resource waste, and low mechanization. Addressing these, this paper focuses on a subway foundation pit project in Guangzhou using mechanical shaft sinking technology. Using intelligent cloud monitoring, we analyzed the stress–strain patterns of the cutting edge and segments. The results showed significant improvements in construction efficiency, cost reduction, safety, and resource conservation. Based on this work, this paper makes the following conclusions: (1) The mechanical shaft sinking method offers advantages such as small footprint, high mechanization, minimal environmental impact, and cost-effectiveness. The achievements include a 22.22% reduction in construction time, a 20.27% decrease in investment, and lower worker risk. (2) Monitoring confirmed that all cutting edge and segment values remained safe, demonstrating the method’s feasibility and rationality. (3) Analyzing shaft monitoring data and field uncertainties, this study proposes recommendations for future work, including precise segment lowering control and introducing high-precision total stations and GPS technology to mitigate tunneling and assembly inaccuracies. The research validates the mechanical shaft sinking scheme’s scientific and logical nature, ensuring safety and contributing to technological advancements. It offers practical insights, implementable suggestions, and significant economic benefits, reducing project investment by RMB 41,235,600. This sets a benchmark for subway excavation projects in South China and beyond, providing reliable reference values. Furthermore, the findings provide valuable insights and guidance for industry peers, enhancing overall efficiency and sustainable development in subway construction.

10 October 2026 in Applied Sciences
Verified
Journal Article
Open access
PDF file
ZLZongtao Lin
Zongtao Lin
HTHuawei Tong
Huawei Tong
YZYufan Zhang
Yufan Zhang
YCYongmin Cai
Yongmin Cai
WLWuzhang Luo
Wuzhang Luo
Karst cavities can cause substantial concrete loss, construction incidents, and inadequate bearing strata for bored piles. Advance drilling provides direct geological information but samples only a limited volume, while surface methods may lose resolution with depth and cross-borehole methods require multiple boreholes and additional tomographic processing. This study presents single-borehole high-density electrical resistivity profiling (SHERP) as a rapid, near-borehole screening method for karst cavities at pile locations. A high-density electrode cable and a Schlumberger-type acquisition sequence are used to generate apparent resistivity pseudo-sections that can be inspected on site without tomographic inversion. Three-dimensional finite-element forward models were used to examine the response of simplified soil–bedrock and water-filled cavity configurations. For the modeled conductivity contrast and acquisition geometry, the cavity produced a characteristic double-peaked, or ‘M-shaped’, anomaly in the pseudo-section because the conductive cavity redistributed the electric potential field as the current electrodes crossed the target depth. Field measurements from three boreholes at a karst site in Guangzhou, China, were then compared with borehole logs. Among the tested electrode spacings of 0.3, 0.5, and 1.0 m, the 0.3 m configuration provided the closest agreement with logged cavity boundaries and the highest vertical resolution under the investigated site conditions. SHERP is therefore proposed as a complementary method for screening possible off-axis cavities around pile locations and for supporting subsequent drilling and foundation design.