Weixin Zhou

Ms. Weixin Zhou


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 December 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
BXBo Xu
Bo Xu
WXWubin Xu
Wubin Xu
SJSun Jin
Sun Jin
HZHanwen Zhang
Hanwen Zhang
YXYuanbin Xiao
Yuanbin Xiao
WZWeixin Zhou
Weixin Zhou
The road environment of open-pit mines is complex and unstructured. Unmanned construction machinery driving faces huge challenges. Improving the accuracy and speed of obstacle detection during driving is of great significance to ensuring the safety of mine automation construction and improving the efficiency of overall unmanned operations. In view of the fact that the current obstacle detection algorithm struggles to strike a balance between high precision and real-time performance, and there are problems such as difficulty in model deployment or unsuitability for practical applications, a lightweight open-pit mine driving obstacle detection algorithm based on improved YOLOv8s is proposed, which is committed to improving the driving safety of unmanned engineering machinery in open-pit mines. In order to enhance the ability of the backbone to capture features, the idea of the guidance module (CGBlock) of contextual information is introduced to construct a new CGC2f module; the efficient squeeze excitation (ESE) attention mechanism is embedded in the feature fusion layer to make the model pay more attention to the channels containing important feature information; in order to enhance the model’s learning ability for obstacles of different sizes in the open-pit mine, a more suitable dynamic head network (DyHead) is used at the output end; in order to further improve real-time performance, the layer-based adaptive amplitude pruning (LAMP) score algorithm is used to prune redundant weight parameters. To verify the effectiveness of the algorithm in this paper, an experimental verification is carried out on the constructed open-pit mine driving obstacle dataset. The results show that compared with YOLOv8s, the mAP50 of this algorithm reaches 95.3%, the detection speed is increased by 40.2%, the model parameters are reduced by 71.2%, and the calculation amount is reduced by 73.7%. It meets the requirements of real-time and high-precision obstacle detection in open-pit mine driving and provides technical support for smart mine driving.

25 March 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
YXYuanbin Xiao
Yuanbin Xiao
SJSun Jin
Sun Jin
WXWubin Xu
Wubin Xu
WZWeixin Zhou
Weixin Zhou
BXBo Xu
Bo Xu
HZHanwen Zhang
Hanwen Zhang
This study introduces an enhanced ORB-SLAM3 algorithm to address the limitations of traditional visual SLAM systems in feature extraction and localization accuracy within the challenging terrains of open-pit mining environments. It also tackles the issue of sparse point cloud maps for mobile robot navigation. By combining point-line features with a Micro-Electro-Mechanical System (MEMS) Inertial Measurement Unit (IMU), the algorithm improves the feature matching’s reliability, particularly in low-texture areas. The method integrates dense point cloud mapping and an octree structure, optimizing both navigation and path planning while reducing storage demands and improving query efficiency. The experimental results using the TUM dataset and conducting tests in a simulated open-pit mining environment show that the proposed algorithm reduces the absolute trajectory error by 44.33% and the relative trajectory error by 14.34% compared to the ORB-SLAM3. The algorithm generates high-precision dense point cloud maps and uses an octree structure for efficient 3D spatial representation. In simulated open-pit mining scenarios, the dense mapping outperforms at reconstructing complex terrains, especially in low-texture gravel and uneven surfaces. These results highlight the robustness and practical applicability of the algorithm in dynamic and challenging environments, such as open-pit mining.

27 November 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
HZHanwen Zhang
Hanwen Zhang
SJSun Jin
Sun Jin
BLBing Li
Bing Li
BXBo Xu
Bo Xu
YXYuanbin Xiao
Yuanbin Xiao
WZWeixin Zhou
Weixin Zhou
Gravel is the most frequently used material in infrastructure construction. However, the irregular shape of the gravel pile makes it challenging for the loader to predict a stable shoveling position, which can easily result in partial collapse or a complete landslide, thereby posing a serious threat to the equipment. In view of the imperfect method of determining the shoveling position of the pile by the current unmanned loader and the high hardware requirements for the deployment of the identification model, this paper first establishes a mathematical model of the loader, and preliminarily determines the influence of the concave and convex edges of the gravel pile on the shoveling position selection through discrete element joint simulation; secondly, the influence of the pile with different edge curvatures on the loader operation process is analyzed in the simulation software, and the radar map is used to further identify the superior position features; finally, Ghost Net is used as the backbone network, the RFB module is introduced into the Backbone, and the CBAM attention mechanism is integrated into the C3 module to identify the lightweight YOLOv5s shoveling position. Discrete element analysis and a lightweight network model were used in the above study to find the safest and most effective shoveling positions. During the test that mimicked how the loader would actually shovel, the number of parameters in the improved model was cut down to 32.5% of the original, the number of calculations was cut down to about 55.2% of the original, and the average accuracy of finding the shoveling position of the gravel pile reached 98%.

18 November 2024 in Sensors
Verified
Journal Article
Open access
PDF file
YXYuanbin Xiao
Yuanbin Xiao
WXWubin Xu
Wubin Xu
BLBing Li
Bing Li
HZHanwen Zhang
Hanwen Zhang
BXBo Xu
Bo Xu
WZWeixin Zhou
Weixin Zhou
As mining technology advances, intelligent robots in open-pit mining require precise localization and digital maps. Nonetheless, significant pitch variations, uneven highways, and rocky surfaces with minimal texture present substantial challenges to the precision of feature extraction and positioning in traditional visual SLAM systems, owing to the intricate terrain features of open-pit mines. This study proposes an improved SLAM technique that integrates visual and Inertial Measurement Unit (IMU) data to address these challenges. The method incorporates a point–line feature fusion matching strategy to enhance the quality and stability of line feature extraction. It integrates an enhanced Line Segment Detection (LSD) algorithm with short segment culling and approximate line merging techniques. The combination of IMU pre-integration and visual feature restrictions is executed inside a tightly coupled visual–inertial framework utilizing a sliding window approach for back-end optimization, enhancing system robustness and precision. Experimental results demonstrate that the suggested method improves RMSE accuracy by 36.62% and 26.88% on the MH and VR sequences of the EuRoC dataset, respectively, compared to ORB-SLAM3. The improved SLAM system significantly reduces trajectory drift in the simulated open-pit mining tests, improving localization accuracy by 40.62% and 61.32%. The results indicate that the proposed method demonstrates significance.

10 February 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
WZWeixin Zhou
Weixin Zhou
WXWubin Xu
Wubin Xu
SJSun Jin
Sun Jin
YXYuanbin Xiao
Yuanbin Xiao
YLYu Xian Liu
Yu Xian Liu
BXBo Xu
Bo Xu
When pouring concrete overhead, a pump truck boom’s vibration has a big effect on how accurately the concrete is poured. This is especially true during fixed-point pouring, where the boom’s vibration is likely to cause the pouring position to deviate, which lowers the quality of the construction. It is difficult to forecast the dynamic reaction of the pump truck boom in a construction setting because of the constantly shifting external factors (wind speed, pipeline stress during pumping, etc.), which makes it difficult to guarantee casting accuracy. This study suggests a non-random vibration analysis technique for pump truck booms based on the interval process theory in order to address this issue. A dynamic excitation analysis method based on rigid–discrete coupling is proposed, taking into account the response influence of the material characteristics in the transportation process. The pumping process of concrete materials in the conveying pipeline is simulated using discrete element simulation technology to determine the system’s stress conditions under pumping conditions. The dynamic response characteristics of the pump truck boom under operating conditions are revealed by using non-random vibration analysis with the mathematical model that has been created based on the particular specifications of the pump truck boom. This study employs the Newmark-β technique for numerical computation to solve the dynamic equations and characterize the displacement response envelope under uncertain system parameter settings. The experimental findings demonstrate that the suggested approach may accurately capture the upper and lower bounds of the boom dynamic response, offering a trustworthy way to assess the dynamic behavior while pumping. The technique can reliably predict the dynamic displacement boundary and control the casting position deviation within a predefined range by accurately predicting the dynamic displacement range of the pump truck’s boom end and efficiently constructing the displacement envelope under uncertain dynamic excitation. For numerical computation, use the Newmark-β algorithm. This outcome confirms the substantial enhancement of the proposed method regarding pouring precision in construction settings, offering a novel solution and technical guidance for vibration control in engineering projects.