Alexander Dummer

Dr. Alexander Dummer

orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 March 2022 in International Journal of Solids and Structures
Verified
Journal Article
Open access
ADAlexander Dummer
Alexander Dummer
MNMatthias Neuner
Matthias Neuner
GHGuenter Hofstetter
Guenter Hofstetter

27 March 2022 in Engineering Fracture Mechanics
Verified
Journal Article
Open access
SSS. Smaniotto
S. Smaniotto
MNMatthias Neuner
Matthias Neuner
ADAlexander Dummer
Alexander Dummer
TCTobias Cordes
Tobias Cordes
GHGuenter Hofstetter
Guenter Hofstetter

20 August 2024 in Computer Methods in Applied Mechanics and Engineering
Verified
Journal Article
Open access
MNMatthias Neuner
Matthias Neuner
ADAlexander Dummer
Alexander Dummer
SVS. Abrari Vajari
S. Abrari Vajari
PGPeter Gamnitzer
Peter Gamnitzer
HGH. Gimperlein
H. Gimperlein
GHG. Hofstetter
G. Hofstetter

22 November 2022 in Construction and Building Materials
Verified
Journal Article
Open access
ADAlexander Dummer
Alexander Dummer
SSStefan Smaniotto
Stefan Smaniotto
GHGuenter Hofstetter
Guenter Hofstetter

25 April 2024 in Computer Methods in Applied Mechanics and Engineering
Verified
Journal Article
Open access
ADAlexander Dummer
Alexander Dummer
MNMatthias Neuner
Matthias Neuner
PGPeter Gamnitzer
Peter Gamnitzer
GHGünter Hofstetter
Günter Hofstetter

7 May 2020 in Structural Engineering International
Verified
Journal Article
Open access
MNMatthias Neuner
Matthias Neuner
ADAlexander Dummer
Alexander Dummer
MSMagdalena Schreter
Magdalena Schreter
GHGuenter Hofstetter
Guenter Hofstetter
TCTobias Cordes
Tobias Cordes
KBKonrad Bergmeister
Konrad Bergmeister
The Brenner Base Tunnel (BBT), a 64 km long railway tunnel between Austria and Italy, is under construction at the time of writing. The complete tunnel system of the BBT will comprise railway tunnels as well as exploration, emergency, ventilation and access tunnels. The latter are tunnels with generally lower requirements on the serviceability, watertightness, durability, surface quality or availability. In some cases, a single permanent shotcrete lining can fulfill the reduced requirements and offers a very economic tunnel design. Realistic assessment of the load-bearing capacity of shotcrete linings is particularly required for early and large deformations in deep tunnels. This is the motivation for a more sophisticated approach to the back-analysis of a permanent shotcrete lining of a single lined rescue tunnel of the BBT. Thus, a detailed finite element model is developed for analyzing the bearing capacity of the permanent shotcrete lining on the basis of an advanced constitutive model considering the time-dependent and nonlinear material behavior of shotcrete. The material model represents the time-dependent evolution of material properties due to hydration of shotcrete, hardening and softening material behavior, the latter resulting in cracking or crushing of shotcrete, creep and shrinkage. In the finite element model, the time-dependent construction process of the drill-and-blast method for tunnels driven by partial face excavation is considered. The material parameters for the shotcrete model were calibrated based on an experimental program, performed with specimens sampled directly on the construction site of the BBT.