Maria Angeliki Chatzigiannakou

Maria Angeliki Chatzigiannakou


Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
Verified
Journal Article
Open access
PDF file
MCMaria Angeliki Chatzigiannakou
Maria Angeliki Chatzigiannakou
Irina TemizIrina Temiz
Irina Temiz
MLMats Leijon
Mats Leijon
Since 2008, Seabased Industry AB (SIAB) has manufactured and deployed several units of wave energy converters (WECs) of different design. The WECs are linear generators with point absorber buoy systems that are placed on the seabed, mounted on a gravitation concrete foundation. These deployments have taken place in different areas, using different deployment vessels. Offshore deployments of WECs and underwater substations have so far been complicated procedures, that were both expensive and time-consuming. The focus of this paper is to discuss these deployments in terms of economy and time efficiency, as well as safety. Because seven vessels have been used to facilitate the deployments, an evaluation on the above basis is carried out for them. The main conclusions and certain solutions are presented for the various problems encountered during these deployments and the vessel choice is discussed. It is found that the offshore deployment process can be optimized in terms of cost, time efficiency and safety with a careful vessel choice, use of the latest available technologies and detailed planning and organizing.

Verified
Journal Article
Open access
PDF file
FRFlore Rémouit
Flore Rémouit
MCMaria Angeliki Chatzigiannakou
Maria Angeliki Chatzigiannakou
ABAnke Bender
Anke Bender
Irina TemizIrina Temiz
Irina Temiz
JSJan Sundberg
Jan Sundberg
Jens EngströmJens Engström
Jens Engström
Ocean renewable technologies have been rapidly developing over the past years. However, current high installation, operation, maintenance, and decommissioning costs are hindering these offshore technologies to reach a commercialization stage. In this paper we focus on the use of divers and remotely-operated vehicles during the installation and monitoring phase of wave energy converters. Methods and results are based on the wave energy converter system developed by Uppsala University, and our experience in offshore deployments obtained during the past eleven years. The complexity of underwater operations, carried out by either divers or remotely-operated vehicles, is emphasized. Three methods for the deployment of wave energy converters are economically and technically analyzed and compared: one using divers alone, a fully-automated approach using remotely-operated vehicles, and an intermediate approach, involving both divers and underwater vehicles. The monitoring of wave energy converters by robots is also studied, both in terms of costs and technical challenges. The results show that choosing an autonomous deployment method is more advantageous than a diver-assisted method in terms of operational time, but that numerous factors prevent the wide application of robotized operations. Technical solutions are presented to enable the use of remotely-operated vehicles instead of divers in ocean renewable technology operations. Economically, it is more efficient to use divers than autonomous vehicles for the deployment of six or fewer wave energy converters. From seven devices, remotely-operated vehicles become advantageous.

14 August 2019 in IET Smart Grid
Verified
Journal Article
Open access
PDF file
APArvind Parwal
Arvind Parwal
MFMartin Fregelius
Martin Fregelius
JLJennifer Leijon
Jennifer Leijon
MCMaria Angeliki Chatzigiannakou
Maria Angeliki Chatzigiannakou
OSOlle Svensson
Olle Svensson
MLMats Leijon
Mats Leijon
This study presents a step toward the grid connection of a wave‐energy park through an electric power conversion system (EPCS) developed and installed for the wave‐energy harvesting in Lysekil, Sweden. The EPCS comprises a rectifier, a DC bus, and an inverter followed by a harmonic filter (HF). The higher‐ and lower‐order harmonics injected by the inverter in a power quality context are investigated. The lower‐order voltage harmonics partially distort the voltage‐source inverter output grid current. A phase‐locked loop‐based (PLL) grid‐phase tracking is used to attenuate the lower‐order harmonics by reflecting the grid harmonics in the inverter output. An expression for the grid‐current harmonics as a function of the grid‐voltage harmonics has been derived and implemented. A mathematical model is derived to obtain a transfer function for the PLL, and finally, proportional–integral gains are tuned for stable system operation. An HF for mitigating the higher‐order harmonics has been implemented. The total harmonic distortion is evaluated experimentally, and the results fulfil the grid‐code requirements at various frequencies and harmonic orders.

12 June 2019 in Marine Systems & Ocean Technology
Verified
Journal Article
Open access
PDF file
MCMaria Angeliki Chatzigiannakou
Maria Angeliki Chatzigiannakou
LULiselotte Ulvgård
Liselotte Ulvgård
Irina TemizIrina Temiz
Irina Temiz
MLMats Leijon
Mats Leijon
Ocean can provide an inexhaustible amount of energy. Many marine energy converters have been developed but most of them have not surpassed the experimental phase due to the high costs in installation, operation, and maintenance. Since 2002 Uppsala University has developed and deployed several units of wave energy converters of various designs. The Uppsala University wave energy converter concept consists of a linear generator directly connected to a point absorber buoy that is mounted on a concrete gravity foundation. Uppsala University deployments have been carried out using different deployment vessels and methods. Three main methods were utilized for these deployments that are discussed in terms of cost, manpower, and time efficiency. Depending on the desired outcome—multiple- or single-device deployment, low budget, etc.—one of the proposed methods can be used for the optimal outcome.