Irina Temiz

Dr. Irina Temiz

Department of Electrical Engineering, Uppsala University, Lägerhyddsvägen 1, 75121 Uppsala, Sweden
orcid

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
Verified
Journal Article
Open access
PDF file
GGGianmaria Giannini
Gianmaria Giannini
Irina TemizIrina Temiz
Irina Temiz
Paulo Jorge Rosa SantosPaulo Jorge Rosa Santos
Paulo Jorge Rosa Santos
ZSZahra Shahroozi
Zahra Shahroozi
JRJose Victor Ramos
Jose Victor Ramos
Francisco Taveira PintoFrancisco Taveira Pinto
Francisco Taveira Pinto
Absorbing wave power from oceans for producing a usable form of energy represents an attractive challenge, which for the most part concerns the development and integration, in a wave energy device, of a reliable, efficient and cost-effective power take-off mechanism. During the various stages of progress, for assessing a wave energy device, it is convenient to carry out experimental testing that, opportunely, takes into account the realistic behaviour of the power take-off mechanism at a small scale. To successfully replicate and assess the power take-off, good practices need to be implemented aiming to correctly scale and evaluate the power take-off mechanism and its behaviour. The present paper aims to explore and propose solutions that can be applied for reproducing and assessing the power take-off element during experimental studies, namely experimental set-ups enhancements, calibration practices, and error estimation methods. A series of recommendations on how to practically organize and carry out experiments were identified and three case studies are briefly covered. It was found that, despite specific options that can be strictly technology-dependent, various recommendations could be universally applicable.

Verified
Journal Article
Open access
PDF file
MCMaria Angeliki Chatzigiannakou
Maria Angeliki Chatzigiannakou
Irina TemizIrina Temiz
Irina Temiz
MLMats Leijon
Mats Leijon
Since 2008, Seabased Industry AB (SIAB) has manufactured and deployed several units of wave energy converters (WECs) of different design. The WECs are linear generators with point absorber buoy systems that are placed on the seabed, mounted on a gravitation concrete foundation. These deployments have taken place in different areas, using different deployment vessels. Offshore deployments of WECs and underwater substations have so far been complicated procedures, that were both expensive and time-consuming. The focus of this paper is to discuss these deployments in terms of economy and time efficiency, as well as safety. Because seven vessels have been used to facilitate the deployments, an evaluation on the above basis is carried out for them. The main conclusions and certain solutions are presented for the various problems encountered during these deployments and the vessel choice is discussed. It is found that the offshore deployment process can be optimized in terms of cost, time efficiency and safety with a careful vessel choice, use of the latest available technologies and detailed planning and organizing.

1 December 2018 in Renewable Energy
Verified
Journal Article
Closed access
Irina TemizIrina Temiz
Irina Temiz
Jennifer LeijonJennifer Leijon
Jennifer Leijon
BEBoel Ekergård
Boel Ekergård
CBCecilia Boström
Cecilia Boström

10 August 2022 in Energies
Verified
Journal Article
Open access
PDF file
CFChristoffer Fjellstedt
Christoffer Fjellstedt
MUMd Imran Ullah
Md Imran Ullah
JFJohan Forslund
Johan Forslund
EJErik Jonasson
Erik Jonasson
Irina TemizIrina Temiz
Irina Temiz
KTKarin Thomas
Karin Thomas
Marine energy resources could be crucial in meeting the increased demand for clean electricity. To enable the use of marine energy resources, developing efficient and durable offshore electrical systems is vital. Currently, there are no large-scale commercial projects with marine energy resources, and the question of how to design such electrical systems is still not settled. A natural starting point in investigating this is to draw on experiences and research from offshore wind power. This article reviews different collection grid topologies and key components for AC and DC grid structures. The review covers aspects such as the type of components, operation and estimated costs of commercially available components. A DC collection grid can be especially suitable for offshore marine energy resources, since the transmission losses are expected to be lower, and the electrical components could possibly be made smaller. Therefore, five DC collection grid topologies are proposed and qualitatively evaluated for marine energy resources using submerged and non-submerged marine energy converters. The properties, advantages and disadvantages of the proposed topologies are discussed, and it is concluded that a suitable electrical system for a marine energy farm will most surely be based on a site-specific techno-economic analysis.

Verified
Journal Article
Open access
PDF file
FRFlore Rémouit
Flore Rémouit
MCMaria Angeliki Chatzigiannakou
Maria Angeliki Chatzigiannakou
ABAnke Bender
Anke Bender
Irina TemizIrina Temiz
Irina Temiz
JSJan Sundberg
Jan Sundberg
Jens EngströmJens Engström
Jens Engström
Ocean renewable technologies have been rapidly developing over the past years. However, current high installation, operation, maintenance, and decommissioning costs are hindering these offshore technologies to reach a commercialization stage. In this paper we focus on the use of divers and remotely-operated vehicles during the installation and monitoring phase of wave energy converters. Methods and results are based on the wave energy converter system developed by Uppsala University, and our experience in offshore deployments obtained during the past eleven years. The complexity of underwater operations, carried out by either divers or remotely-operated vehicles, is emphasized. Three methods for the deployment of wave energy converters are economically and technically analyzed and compared: one using divers alone, a fully-automated approach using remotely-operated vehicles, and an intermediate approach, involving both divers and underwater vehicles. The monitoring of wave energy converters by robots is also studied, both in terms of costs and technical challenges. The results show that choosing an autonomous deployment method is more advantageous than a diver-assisted method in terms of operational time, but that numerous factors prevent the wide application of robotized operations. Technical solutions are presented to enable the use of remotely-operated vehicles instead of divers in ocean renewable technology operations. Economically, it is more efficient to use divers than autonomous vehicles for the deployment of six or fewer wave energy converters. From seven devices, remotely-operated vehicles become advantageous.