Clemente Irigaray

Dr. Clemente Irigaray

Civil Engineering Departemnt, University of Granada, Spain

Research Focus & Metrics

Academic Career Length

24Years (2003-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
31 October 2006 in Bulletin of Engineering Geology and the Environment
Verified
Journal Article
Closed access
PDF file
JCJ. Chacón
J. Chacón
Clemente IrigarayClemente Irigaray
Clemente Irigaray
Tomás FernándezTomás Fernández
Tomás Fernández
RHRachid El Hamdouni
Rachid El Hamdouni

4 November 2008 in Natural Hazards
Verified
Journal Article
Closed access
PDF file
JJJ. D. Jiménez-Perálvarez
J. D. Jiménez-Perálvarez
Clemente IrigarayClemente Irigaray
Clemente Irigaray
RHRachid El Hamdouni
Rachid El Hamdouni
JCJ. Chacón
J. Chacón

2 October 2010 in Bulletin of Engineering Geology and the Environment
Verified
Journal Article
Closed access
PDF file
JJJ. D. Jiménez-Perálvarez
J. D. Jiménez-Perálvarez
Clemente IrigarayClemente Irigaray
Clemente Irigaray
RHRachid El Hamdouni
Rachid El Hamdouni
JCJ. Chacón
J. Chacón

1 November 2003 in Natural Hazards
Verified
Journal Article
Closed access
PDF file
Clemente IrigarayClemente Irigaray
Clemente Irigaray
Tomás FernándezTomás Fernández
Tomás Fernández
JCJ. Chacón
J. Chacón

27 April 2017 in Geosciences
Verified
Journal Article
Open access
PDF file
Tomás FernándezTomás Fernández
Tomás Fernández
JGJose Luis García
Jose Luis García
CCCarlos Colomo
Carlos Colomo
JCJavier Cardenal-Escarcena
Javier Cardenal-Escarcena
Jorge DelgadoJorge Delgado
Jorge Delgado
JCJosé Chacón
José Chacón
In this work a detailed analysis of the temporal evolution of the Almegíjar landslide is presented. It is a rock slide located in the Alpujarras region (Granada, Spain) that has developed over the last 30 years. Six datasets and photogrammetric flights corresponding to the years 1956, 1984, 1992, 2001, 2008, and 2010 were surveyed. The more recent flight of 2010 combined an aerial digital camera and a LiDAR sensor and was oriented by means of in-flight data and tie points. This 2010 flight allowed for the generation of a reliable and high-precision Digital Terrain Model (DTM). The other flights were oriented using second-order ground control points transferred from the 2010 flight, and the corresponding DTMs were prepared by automatic matching and subsequent editing from the stereoscopic models. After comparing the DTMs of different dates, it has been observed that the landslide was triggered after 1984 and since then has evolved in an irregular pattern with periods of variable activity. On average, the ground surface dropped more than 8 m in depleted zones and rose nearly 4 m in the accumulation zones, with a velocity catalogued as very slow (about 15–30 cm/year) over a time span corresponding to a degree VIII of diachroneity. The total volume of the mobilized mass of this large contemporary slide was about 300 × 103 m3.