Minh Phuc Duong

Dr. Minh Phuc Duong

orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2024 in Bulletin of Electrical Engineering and Informatics
Verified
Journal Article
Open access
PDF file
CHChiem Trong Hien
Chiem Trong Hien
MDMinh Phuc Duong
Minh Phuc Duong
HPHuu Ly Pham
Huu Ly Pham
This research presents the implementation of a modern meta-heuristic algorithm called the skill optimization algorithm (SOA) to solve the optimal power flow problem (OPF). An IEEE 30-bus transmission system is selected to test the real performance of SOA. The main objective function of the study is to minimize the total fuel cost (TFC) of all thermal units. To clarify the high performance of SOA, a classical meta-heuristic named particle swarm optimization (PSO) is also applied for comparison. All results reached by SOA are compared with those of PSO on different criteria. Particularly, SOA has reached smaller cost than PSO by $1.04, equivalent to 0.13% of PSO’s TFC. Furthermore, SOA has reached a more stable performance by finding better average and maximum TFC over fifty runs. The evaluation of these criteria indicates that SOA completely outperforms PSO. Besides, the optimal solution reached by SOA satisfies all considered constraints with zero violation of the dependent variables. Therefore, SOA is highly suggested to handle the OPF problem.

6 January 2025 in Sustainability
Verified
Journal Article
Open access
PDF file
MDMinh Phuc Duong
Minh Phuc Duong
MLMy-Ha Le
My-Ha Le
TNThuan Thanh Nguyen
Thuan Thanh Nguyen
Quan Minh DuongQuan Minh Duong
Quan Minh Duong
ADAnh Tuan Doan
Anh Tuan Doan
The study applies the black kite algorithm (BKA), equilibrium optimizer (EO), and secretary bird optimization algorithm (SBOA) to optimize the placement of electric vehicle charge stations (EVCSs), wind turbine stations (WTSs), photovoltaic units (PVUs), and capacitor banks (CAPBs) in the IEEE 69-node distribution power grid. Three single objectives, including power loss minimization, grid power minimization, and total voltage deviation improvement, are considered. For each objective function, five scenarios are simulated under one single operation hour, including (1) place-only EVCSs; (2) place EVCSs and PVUs; (3) place EVCSs, PVUs, and CAPBs; (4) EVCSs and WTSs; and (5) EVCSs, PVUs, WTSs, and CAPBs. The results indicate that the EO can find the best solutions for the five scenarios. The results indicate that the EO and SBOA are the two powerful algorithms that can find optimal solutions for simulation cases. For one operating day, the total grid energy that is supplied to base loads and charge stations is 80,153.1 kWh, and many nodes at high load factors violate the lower limit of 0.95 pu. As for installing more renewable power sources, the energy that the base loads and charge stations need to supply from the grid is 39,713.4 kWh. As more capacitor banks are installed, the energy demand continues to be reduced to 39,578.9 kWh. The energy reduction is greater than 50% of the demand of all base loads and charge stations. Furthermore, the voltage can be significantly improved up to higher than 0.95 pu, and a few nodes at a few hours fall into the lowest range. Thus, the study concludes that the economic and technical aspects can be guaranteed for DPGs with additional installation of EVCSs.

27 November 2025 in Energy Reports
Verified
Journal Article
Open access
ATAnh-Tuan Tran
Anh-Tuan Tran
MDMinh Phuc Duong
Minh Phuc Duong
PTPham Truong
Pham Truong
Jae Woong ShimJae Woong Shim
Jae Woong Shim
CLChee Peng Lim
Chee Peng Lim

22 March 2025 in Sensors
Verified
Journal Article
Open access
PDF file
LKLe Chi Kien
Le Chi Kien
LTLoi Duc Tran
Loi Duc Tran
MDMinh Phuc Duong
Minh Phuc Duong
TNThuan Thanh Nguyen
Thuan Thanh Nguyen
This paper applies the Chameleon Swarm Algorithm (CSA) and Snow Geese Algorithm (SGA) for optimizing the placement of electric vehicle charge stations (EVCSs), renewable energy sources (RESs), and shunt capacitors (SCs). The actual power ranges of the EVCSs of the Vinfast company in Vietnam are used to check the stabilization of the IEEE 85-node distribution power grid by considering four penetration levels of EVCSs, namely 25%, 50%, 75%, and 100%. All penetration levels of EVCSs violate the operating load voltage limits, and the grid cannot work for all the penetration levels. Different scenarios are performed to find the minimum RES penetration level and the most possible SC penetration level to satisfy the operating voltage limits. The use of only SCs cannot satisfy the voltage limits even for the 25% EVCS penetration level. The placement of RESs provides the capability to maintain voltage within the allowed range for 25% and 50% EVCS penetration but not for 75% and 100%. Using both RESs and SCs, the operating voltage limits are satisfied by using RESs with 1385 kW (about 30.44% of loads and EVCSs) and SCs with 2640 kVAr for the 75% EVCS penetration level and using RESs with 2010 kW (about 38.58% of loads and EVCSs) and SCs with 2640 kVAr (100% of loads) for the 100% EVCS penetration level. The study indicates that the installation of EVCSs should be calculated for stable operation of the distribution power grid, and the combination of both RESs and SCs can satisfy the maximum penetration level of EVCSs in the distribution power grids.


15 December 2024 in Energies
Verified
Journal Article
Open access
PDF file
LKLe Chi Kien
Le Chi Kien
HPHuu Ly Pham
Huu Ly Pham
MDMinh Phuc Duong
Minh Phuc Duong
PTPhan Minh Tan
Phan Minh Tan
This paper examines the effectiveness of a pumped storage hydropower plant (PSHP) when combined with other plants. System 1 examines the contribution of the PSHP to reducing fuel costs for thermal power plants. System 2 examines the optimization of operations for power systems with energy storage and uncertain renewable energies to maximize total profit based on four test system cases: Case 1: neglect the PSHP and consider wind and solar certainty; Case 2: consider the PSHP and wind and solar certainty; Case 3: neglect the PSHP and consider wind and solar uncertainty; and Case 4: consider the PSHP and wind and solar uncertainty. Cases 1 and 2 focus on systems that assume stable power outputs from these renewable energy sources, while Cases 3 and 4 consider the uncertainty surrounding their power output. The presence of a PSHP has a key role in maximizing the system’s total profit. This proves that Case 2, which incorporates a PSHP, achieves a higher total profit than Case 1, which does not include a PSHP. The difference is USD 17,248.60, representing approximately 0.35% for a single day of operation. The total profits for Cases 3 and 4 are USD 5,089,976 and USD 5,100,193.80, respectively. Case 4 surpasses Case 3 by USD 10,217.70, which is about 0.2% of Case 3’s total profit. In particular, the PSHP used in Cases 2 and 4 is a dispatching tool that aims to achieve the highest profit corresponding to the load condition. The PSHP executes its storage function by using low-price electricity at off-peak periods to store water in the reservoir through the pumping mode and discharge water downstream to produce electricity at periods with high electricity prices using the generating mode. As a result, the total profit increases. A modified slime mould algorithm (MSMA) is applied to System 2 after proving its outstanding performance compared to the jellyfish search algorithm (JS), equilibrium optimizer (EO), and slime mould algorithm (SMA) in System 1.