Yanpeng Zhu

Prof. Yanpeng Zhu


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 June 2021 in Arabian Journal of Geosciences
Verified
Journal Article
Closed access
PDF file
ZZZhuangfu Zhao
Zhuangfu Zhao
YZYanpeng Zhu
Yanpeng Zhu
SYShuaihua Ye
Shuaihua Ye

6 February 2024 in Scientific Reports
Verified
Journal Article
Open access
PDF file
ZZZHAO ZHUANGFU
ZHAO ZHUANGFU
YZYanpeng Zhu
Yanpeng Zhu
HHHongjie Hou
Hongjie Hou
LLLian Li
Lian Li
In the stability analysis of loess fill slope, the fissure nature of loess is often ignored, which makes the stability calculation of fill slope too conservative. Based on the upper limit theory of plastic limit analysis, the stability analysis model of loess-filled fissured slope supported by frame prestressed anchors was established. Considering the tensile strength cut-off yield property of soil, the stability coefficient of slope was calculated, and the influence of different factors on slope stability was analyzed. The results show that ignoring the fissures in loess will overestimate the stability of the fill slope, and the support structure can significantly improve the stability of the loess-filled fissure slope. The research results of this paper can further enrich the stability analysis theory of loess-filled fissured slope supported by frame prestressed anchors, which is of great significance to guide engineering practice.

4 July 2022 in Scientific Reports
Verified
Journal Article
Open access
PDF file
ZZZHAO ZHUANGFU
ZHAO ZHUANGFU
YZYanpeng Zhu
Yanpeng Zhu
SYShuaihua Ye
Shuaihua Ye
Combined with the deformation characteristics of flexible retaining structure, the horizontal displacement calculation method of loess fill slope supported by frame prestressed anchors is proposed. Based on the minimum potential energy method, the analytical solution of horizontal displacement of slope under self-weight and additional load is derived, and the influence of soil parameters and supporting structure parameters on displacement is analyzed. The proposed calculation method is applied to a practical engineering and compared with the numerical simulation, which shows that the method is reasonable and reliable. The minimum potential energy method is clear in concept and simple in solving the horizontal displacement of loess fill slope supported by frame prestressed anchors. The calculation method proposed in this paper can be applied to the structural optimization design of loess fill slope supported by frame prestressed anchors, and further enrich the displacement calculation theory of slope supported by flexible retaining structure.

21 August 2025 in Geotechnical and Geological Engineering
Verified
Journal Article
Closed access
PDF file
ZZZHAO ZHUANGFU
ZHAO ZHUANGFU
YZYanpeng Zhu
Yanpeng Zhu
XYXin Yang
Xin Yang
BBBingjie Bai
Bingjie Bai