The present work aims to carry out free vibration and buckling analysis of functionally graded hybrid reinforced laminated composite plates under thermal conditions. Finite element-based solutions are presented within the framework of recently proposed higher-order zigzag theory. Different variations of concentration of graphene platelets and fibers within the plate across its thickness are considered. First, the plate polymer is assumed to be reinforced using graphene platelets and then with fibers. The multiscale material properties of hybrid reinforced plates are obtained using the Halpin–Tsai micromechanical model. The nature of the distribution of graphene platelets and fibers across the thickness of the plate widely governs the free vibration behavior of functionally graded hybrid reinforced composite plates. The number of layers and shape factors also affect the free vibration behavior of functionally graded hybrid reinforced composite plates.
Construction projects in metro areas often experience big delays, which make the projects take longer, cost more, and use resources less efficiently. Getting rid of these delays is necessary to make the project run more smoothly and waste less material, which is in line with the ideals of smarter production. This study’s goal is to find, examine, and rank the most important reasons that cause Indian metro projects to be late while also suggesting long-term answers that use lean methods. This study is needed because train projects are becoming more complicated, and people want more environmentally friendly building methods. A total of 38 people from the government, business, and other building sectors filled out an organized questionnaire poll that was used to collect data. To get a full picture of the delay factors, a quantitative approach was used. This included a Likert scale, ranking, percentage analysis, the relative importance index (RII), and SPSS analysis. These methods were picked to make sure that the delays were accurately measured and that answers could be put in order of importance. This study found 19 specific reasons for delay and put them into seven main groups. The results show that delays are mostly caused by links to utilities and other equipment outside the building. Lean methods, which focus on reducing waste and making the best use of resources, are suggested as good ways to cut down on these delays and encourage better production in metro building projects.