The misalignment of segments in installation is a common issue in the construction of TBM tunnels. This raises a question of whether misalignment affects the operation safety of a hydraulic TBM tunnel. Using a water transfer engineering project as an example, this paper built a three-dimensional finite element model composited with segment, grout layer and surrounding rock for the numerical analysis of the behavior of single-directionally misaligned segments. The crown or invert segment was separately misaligned towards to the center of segment ring in a value of 5 mm, 10 mm, 20 mm, 30 mm or 40 mm. The strength grade of the segment concrete was C50. A weaker surrounding rock composed of V-class rock was considered for the tunnel. The results indicate that the misalignment of the crown or invert segment, respectively, creates the tensile stress in the inner surface of the corresponding segment, the tensile stress will be over the limit of C50 concrete when the misalignment is over 30 mm, indicating a risk of concrete cracking. The contact surfaces of the segment ring basically remain in compression, and the locating pins between the segment rings exhibit an evident increase in tensile stress at misaligned positions. The key points that can be obtained from this study are that a special supervision is needed to ensure the accuracy of segment installation, and strengthening measures are needed for existing misaligned segments.
In the operation period of long-distance water delivery tunnels, safety may be impacted by the risks that arise from different aspects including the complex geological conditions with fault fracture zones and karst caves, the diverse environment affecting structural safety and stability, and the construction defects of tunnels. It is crucial to assess and mitigate potential risks to ensure operation safety. To address this challenge, this study presents a systemic risk assessment for the operation safety of a real project of a water delivery tunnel. The potential risks of this project were first summarized based on the analytical hierarchy process (AHP), and a model that integrates the AHP and fuzzy comprehensive evaluation (FCE) was built to effectively quantify and categorize risks for the project in its operation stage. Results of the assessment indicate that the risk of this tunnel operation can be classified at a moderate grade with a calculted specific risk score of 43.935, with the high-risk factors including segment lining cracking, flow control, and regular maintenance. In response to the high-risk factors, the preventative and control measures are proposed to guide effective risk management. The model presented offers an efficient risk assessment tool for water delivery tunnels, aiding decision makers making more rational management decisions in complex and uncertain environments.