Due to the poor stability of the roof and floor of the roadway in the 3-1 coal seam of Chahasu Coal Mine, traditional gob-side entry retaining (GER) methods fail to meet the production safety requirements. To address this, a GER technology using paste backfill was proposed. This study reveals the stability mechanism of the surrounding rock in GER with paste backfill through theoretical analysis, numerical simulation, and industrial experiments. First, theoretical analysis was conducted to determine the overburden movement characteristics under varying backfill ratios. Uniaxial compressive tests on the paste material demonstrated that its bearing capacity reaches a relatively stable state after 14–28 days of curing. Second, numerical simulations were performed to study the deformation patterns of the surrounding rock and mine pressure characteristics under backfill ratios of 65%, 75%, 85%, and 95%. The Strain-Softening model was used to calibrate the backfill material parameters. The results showed that as the backfill ratio increased, the support provided by the backfill material improved, leading to enhanced bearing capacity of the overlying strata, reduced mine pressure intensity, significantly decreased deformation of the roadway, and substantially improved stability of the surrounding rock. Third, under a backfill ratio of 95%, the evolution of the abutment stress during face advancement was investigated. It was found that as the working face advanced, the backfill material and the overlying strata gradually formed a stable composite structure, with the abutment stress in the mining area stabilizing over time. Finally, to address the issue of insufficient initial strength and limited support capacity of the paste backfill material, a comprehensive control system for surrounding rock stability was proposed. This system integrates a basic bolt-mesh-cable support structure with localized reinforcement using portal hydraulic supports. Field industrial practices demonstrated that after applying this comprehensive control technology, the convergence of roof and floor was approximately 190 mm and the convergence of two ribs was about 140 mm, effectively ensuring the stability of surrounding rock in GER with paste backfill working face.
Aiming at the broken failure of anchor cable in the mining roadway roof during the mining process, the lagging support scheme of anchor cable is proposed. Based on the results of indoor anchor cable pull‐out test, the Cable element in FLAC3D is modified to realize the extension breaking of anchor cable in the calculation process. Furthermore, the minimum principal stress and volume strain rate mutation point are used as the failure criteria of the anchor cable. Through the comparative analysis of five anchor cable lagging support schemes of 6208 transport tunnel in Wangzhuang Mine Coal, the results demonstrate that the lagging support reduces the initial support resistance of the supporting structure. With the increase of lagging time, the ability of anchor cable to adapt to deformation increases gradually. When the lagging time reaches the gentle area of roadway deformation, its ability to adapt to deformation remains stable. Finally, it was determined that the support should start at 10–15 m of the anchor cable lagging head of the 6208 transport tunnel. Industrial tests show that the lagging support scheme ensures that the anchor cable can withstand a certain deformation, and the support body has no broken failure, which effectively controls the large mining‐induced deformation of surrounding rock.
To address severe stress concentration, excessive convergence, and instability of the roadside backfill body (RBB) in gob-side entry retaining (GER) under thick and hard roof conditions, this study investigates the control mechanism of main roof fracture position on surrounding rock stability, using the 3−101 working face of Huoluowan Coal Mine as a case study. A combined approach integrating theoretical analysis, numerical simulation, and field investigation is adopted. A statically indeterminate mechanical model based on masonry beam theory is established to characterize the lateral roof fracture behavior. The deflection and bending moment distributions are derived, and a criterion for fracture position determination is developed based on the maximum bending moment condition. The theoretical results indicate that the natural fracture position is located approximately 9.4–11.2 m inside the gob boundary. Numerical simulations using UDEC Trigon under different fracture positions (−2 m, 1 m, 5 m, and 9 m) show that fracture location significantly affects the mechanical response of GER. Fractures occurring above the roadway or RBB induce large deformation levels and more extensive plastic zones, while gob-side fracture conditions correspond to relatively lower disturbance levels and improved structural stability. The RBB exhibits shear-dominated failure characteristics, and the displacement distribution is non-uniform along height, with larger deformation in the middle-to-upper region. To improve stability, a coordinated control strategy combining anchor cable reinforcement and directional long-distance hydraulic fracturing (HF) is proposed to regulate the main roof fracture position through the formation of artificial weak planes. Field monitoring results show that the maximum displacements of the roof, floor, and ribs are 558 mm, 233.5 mm, and 71.3 mm, respectively, with a convergence ratio of 19.8%. Borehole imaging confirms the development of hydraulic fractures within the designed roof stratum, supporting the effectiveness of the proposed control approach. These results demonstrate that the fracture position of the main roof plays a key role in controlling GER stability, and its regulation provides an effective means for improving roadway performance under complex geological conditions.