This study presents a stability analysis of a high‐steep rock slope with two faults during excavations and evaluates the effectiveness of a proposed reinforcement method using prestressed anchor cables. A 3D finite difference model was established based on the strength reduction method using FLAC3D software. The influence of various fault conditions and the effectiveness of the reinforcement on the slope stability during the excavation process were analyzed and compared to field monitoring data. The numerical analysis and field monitoring results showed that the fault close to the slope surface (f20) was prone to the local instability under external forces caused by the excavation, but a fault further away from the slope surface (f14) had insignificant influence on the stability of the slope. Based on the numerical analysis results, the proposed reinforcement measure can increase the factor of safety (FOS) of the slope by 19.2%. The field monitoring data also showed that the displacement of the monitoring point gradually decreased after the reinforcement, and the deformation of the slope was effectively controlled.
19 June 2025 in Construction and Building Materials
Time-dependent deformation of surrounding rocks during construction and service directly affects the structural safety of hydraulic tunnels. Specifically, the creep effect on the cross-fault diversion tunnels is particularly significant. In recent years, a variety of research has focused on the impact of creep on operating cross-fault diversion tunnels. However, there is a lack of consideration for the creep phenomenon during the construction-operation period. This study proposes a simulation method of segment linings deformation of cross-fault diversion tunnel combining deformation monitoring, creep constitutive identification, and creep during construction operation. According to the measured time-displacement data of the surrounding rock, the suitable creep constitutive model is selected by a regression-comparison method. Subsequently, the three-dimensional numerical model of the cross-fault tunnel is established, with the tunnel excavation and long-term creep calculation carried out under the creep effect of the surrounding rock. In addition, the intelligent inversion model was adopted to obtain the basic parameters of the surrounding rock. The results show that fault directly affects the rock mass characteristics near the fault. The radius of influence is about one time the tunnel diameter from the fault. The vertical deformation of segment linings of the vault and inverted arch tends to be subsidence when the fault is above the tunnel; however, the trend is inverse when the fault is under the tunnel. This work gives targeted engineering suggestions and provides a scientific basis for designing and constructing diversion tunnels under complicated geological structures.
In this paper, the early drying shrinkage coefficients of different hydraulic cement mortars are calibrated through laboratory experiments for moderate-heat Portland cement (MHPC) and low-heat Portland cement (LHPC). By developing an improved mesoscale modeling approach, a 3D highly detailed simulation of concrete was generated, which incorporates the phases of mortar, aggregates, and interfacial transition zone (ITZ). The simulation result is in good agreement with the concrete early drying shrinkage experiment, exhibiting an error of less than 4.99% after 28 days. Subsequently, the mesoscale model is employed to explain the influence of the ambient humidity, cement type, and aggregate volume ratio on the early drying shrinkage performance of concrete. The results show that the early drying shrinkage coefficient of the LHPC is approximately 82% of the MHPC. Additionally, the depth of ambient humidity influence is about 15 mm from the concrete surface after 28 days. The early drying shrinkage can be controlled by increasing ambient humidity via the LHPC or raising the aggregate volume ratio. The mass-loss rate of concrete decreases as the ambient humidity or aggregate volume ratio increases during the process of drying shrinkage. Furthermore, the results quantify the influence patterns of various factors on drying shrinkage, thereby facilitating their application in assessing the cracking time induced by early drying shrinkage in roller-compacted concrete (RCC) dams. This provides theoretical guidance for crack prevention in concrete structures and aids in developing strategies for the construction of crack-free dams.
23 January 2025 in Archives of Civil and Mechanical Engineering