XiangHao Kong

Mr. XiangHao Kong


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
5 February 2025 in Sustainability
Verified
Journal Article
Open access
PDF file
XKXiangHao Kong
XiangHao Kong
LFLiang Feng
Liang Feng
PKPeng Ke
Peng Ke
Guanyu SongGuanyu Song
Guanyu Song
CXChuanliang Xiao
Chuanliang Xiao
The integration of distributed generation (DG) into distribution networks has significantly increased the strong coupling between power supply capacity and renewable energy acceptance capacity. Addressing this strong coupling while enhancing both capacities presents a critical challenge in modern distribution network development. This study introduces an innovative joint planning and reconstruction strategy for network and energy storage, designed to simultaneously enhance power supply capacity and renewable energy acceptance capacity. The proposed approach employs a bi-level optimization model: the upper level focuses on minimizing economic costs by determining the optimal locations and capacities of energy storage systems and the layout of network lines, while the lower level aims to maximize power supply and renewable energy acceptance capacities by optimizing line switch states. Additionally, this research quantifies the coupling relationship between these two capacities under uncertainty, providing a deeper understanding of their dynamic interaction. Advanced computational techniques, including Monte Carlo simulations and particle swarm optimization (PSO), are utilized to solve the model efficiently. Case studies demonstrate that the proposed strategy effectively enhances both power supply and renewable energy acceptance capacities. Furthermore, exploring the strong coupling relationship between these two capacities under various conditions not only optimizes the utilization of renewable energy in the power system and prevents resource waste, but also helps avoid the volatility impacts of renewable energy uncertainty on the power system in actual planning. Additionally, the network and energy storage joint planning and reconstruction strategy proposed in this study achieves cost minimization under the constraint of limited resources and simultaneously enhanced both capacities. The strategy provides feasible solutions for power grid planning in actual applications.