Haibin Ding

Dr. Haibin Ding


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 May 2026 in Engineering Structures
Verified
Journal Article
Closed access
HDHaibin Ding
Haibin Ding
CLChenghui Lin
Chenghui Lin
CXChangjie Xu
Changjie Xu
CLC.W. Lim
C.W. Lim
ZLZhiyun Liu
Zhiyun Liu
LTLihong Tong
Lihong Tong

29 July 2023 in Computers and Geotechnics
Verified
Journal Article
Closed access
LTLihong Tong
Lihong Tong
LFLi Fu
Li Fu
CXChangjie Xu
Changjie Xu
HDHaibin Ding
Haibin Ding
MXMin Xiao
Min Xiao

25 November 2024 in Tunnelling and Underground Space Technology
Verified
Journal Article
Closed access
HDHaibin Ding
Haibin Ding
XWXuepeng Wang
Xuepeng Wang
LTLihong Tong
Lihong Tong
QLQi Lu
Qi Lu
CXChangjie Xu
Changjie Xu
LGLingxiao Guang
Lingxiao Guang

1 November 2023 in International Journal of Geomechanics
Verified
Journal Article
Closed access
LTL. H. Tong
L. H. Tong
WGWanglong Guo
Wanglong Guo
CXChangjie Xu
Changjie Xu
HDHaibin Ding
Haibin Ding

21 October 2023 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
WZWancai Zhong
Wancai Zhong
NHNianyong Huang
Nianyong Huang
NNNan Nie
Nan Nie
HDHaibin Ding
Haibin Ding
FGFeng Gao
Feng Gao
The rapid development of urban above- and underground transportation has brought an increasing number of deep foundation pit projects that close to existing urban viaducts. Excavation of the deep foundation pit projects leads to soil movement around the pile foundation, which adversely affects the adjacent existing pile foundation and seriously threatens the operation safety of the adjacent existing viaduct. In this paper, the three-dimensional numerical model of foundation pit excavation, viaduct, and pile foundation was established by using the MIDAS GTS against the background of the basement foundation pit project in the new Guangzhou Baiyun Station comprehensive transportation hub building, production, and life complex, where the interaction between foundation pit excavation and viaduct pile foundation was simulated. The influence of various excavation-related factors and different parameters of the pile foundation on lateral displacements of the pile body adjacent to the existing pile foundation was analyzed. The variables controlled in the numerical model included the different excavation depths of the foundation pit, the distance between the excavation surface and the adjacent pile foundation, the spatial effect of different excavation sequences, the diameter of the pile that adjacent to the existing pile foundation, and the elastic modulus of the bored occlusal pile support structure. The results indicated that the lateral displacement of the pile body of the bridge pile foundation was significantly affected by the excavation of the deep foundation pit. The excavation depth exerted the greatest influence on the lateral displacement of the pile foundation, followed by the distance between the pile foundation and the excavation surface, the excavation sequence of the foundation pit, and the elastic modulus and the diameter of the bored occlusive pile support structure. Among them, the pile foundation located at the corner of the foundation pit was negligibly affected by these influencing factors. The findings in this study can provide valuable experiences for similar projects.

30 October 2024 in Buildings
Verified
Journal Article
Open access
PDF file
PLPeijun Li
Peijun Li
WXWang Xuepeng
Wang Xuepeng
TLTang Xiao Lin
Tang Xiao Lin
ZHZhendong Huang
Zhendong Huang
GXGan Xun
Gan Xun
TLTang Xiao Lin
Tang Xiao Lin
Rainfall is one of the most important factors affecting slope stability. This study employed multi-source monitoring devices to observe the slope displacements in real time under rainfall infiltration and performed numerical simulations to investigate the effects of different rainfall conditions and anti-slip pile configurations on slope stability. Specifically, multi-source monitoring operations were conducted on the high and steep slopes along the Yunmao Expressway. Real-time data on slope deformation, rainfall, and displacement at the tops of anti-slip piles were collected and analyzed, and numerical simulations were conducted using Geo Studio finite-element software. The findings indicated that abrupt deformation of slopes occurs once a threshold rainfall amount is surpassed and sustained over a specific duration. Slope displacement decreased with increasing slope depth above the potential slip fracture surface, with a more rapid reduction in deformation rates observed in slopes reinforced with anti-slip piles. For equivalent rainfall amounts, short-duration, intense rainfalls led to a rapid decrease in the slope safety factor, which also recovered rapidly once the rainfall ceased, in contrast to long-duration, mild rainfalls. The presence and location of anti-slip piles significantly influenced slope stability; therefore, project implementation should carefully consider factors such as cost and duration for optimal decision making.