With the increase of mining depth and strength, the evolution of bolt axial force is increasingly becoming important for ensuring the reliability and safety of support. To improve the problem of the existing coal mine roadway pressure-monitoring method, whereby it is difficult to continuously monitor the axial force of the bolt over a long period of time, a full rod fiber bragg grating (FBG) force-measuring bolt and system were designed based on the principle of fiber grating sensing. It was found that a trapezoidal groove is a relatively better groove. The linearity between the center wavelength offset of the fiber grating and the axial force was more than 0.99, and the conversion formula between the axial force of the bolt rod and the wavelength change of the fiber grating were obtained. The real-time monitoring revealed that the axial force of the bolt obviously changed before and after compression. The axial force distribution curve can be divided into the stable zone, growth zone, and peak zone. The influence of the roadway abutment pressure was approximately 130 m ahead of the working face, and the peak area was within the 25–35 m range of the advance working face. The axial force of the bolt rod at the end of the anchorage linearly increased with the tail end of the bolt, the axial force of the free segment was the largest, and the overall stress was essentially the same. The application results demonstrate the feasibility and effectiveness of the FBG full-length force bolt.
For large underground coal mines producing 10 million tons a year, rapid excavation and stability of deep roadways are pivotal to ensure sustainable, safe, and efficient production. This paper provides a case study of Hulusu Coal Mine in Inner Mongolia, where roadway excavation speed was insufficient to meet production needs. Moreover, deformation in the roofs of the roadways was severe. To achieve rapid excavation and control the stability of deep roadways, a new support system was proposed and constructed in a roadway at a depth of 640 m. The system consisted of long flexible bolts pretensioned to high levels and spaced at large intervals. Roadway excavation and construction of a support system were conducted simultaneously. Field measurements indicated that the new support system effectively controlled deformation and fracture development during excavation and mining. Maximum displacements of the roof during excavation and mining were 10 and 30 mm, respectively. The axial load on bolts surged during excavation as a result of slight deformations caused by excavation operations. This active response of the bolts is beneficial to the prevention of roof deformation during excavation and mining. During mining, fissures propagated up to only a depth of 1.4 m into the surrounding rock mass. The new support system formed a thick reinforced anchorage zone, which greatly improved the bearing capacity of the roof. Compared with the previous support system, the new system allowed the maximum excavation speed (31.5 m/day) to increase by 85.3%. This successful case provides a practical reference for similar roadway projects.