Ladislav Papánek

Mr. Ladislav Papánek


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 August 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
Branislav MicietaBranislav Micieta
Branislav Micieta
JSJolanta Staszewska
Jolanta Staszewska
MKMatej Kovalsky
Matej Kovalsky
MKMartin Krajcovic
Martin Krajcovic
Vladimira BinasovaVladimira Binasova
Vladimira Binasova
IAIvan Antoniuk
Ivan Antoniuk
The article deals with the design of an innovative system for scheduling piece and small series discrete production using a combination of parametric simulation models and selected optimization methods. An innovative system for solving production scheduling problems is created based on data from a real production system at the workshop level. The methodology of the innovative system using simulation and optimization methods deals with the sequential scheduling problem due to its versatility, which includes several production systems and due to the fact that in practice, several modifications to production scheduling problems are encountered. Proposals of individual modules of the innovative system with the proposed communication channels have been presented, which connect the individual elements of the created library of objects for solving problems of sequential production scheduling. With the help of created communication channels, it is possible to apply individual parameters of a real production system directly to the assembled simulation model. In this system, an initial set of optimization methods is deployed, which can be applied to solve the sequential problem of production scheduling. The benefit of the solution is an innovative system that defines the content of the necessary data for working with the innovative system and the design of output reports that the proposed system provides for production planning for the production shopfloor level. The DPSS system works with several optimization methods (CR—Critical Ratio, S/RO—Slack/Remaining Operations, FDD—Flow Due Date, MWKR—Most Work Remaining, WSL—Waiting Slack, OPFSLK/PK—Operational Flow Slack per Processing Time) and the simulation experiments prove that the most suitable solution for the FT10 problem is the critical ratio method in which the replaceability of the equipment was not considered. The total length of finding all solutions by the DPSS system was 1.68 min. The main benefit of the DPSS system is the combination of two effectively used techniques not only in practice, but also in research; the mentioned techniques are production scheduling and discrete computer simulation. By combining techniques, it is possible to generate a dynamically and interactively changing simulated production program. Subsequently, it is possible to decide in the emerging conditions of certainty, uncertainty, but also risk. To determine the conditions, models of production systems are used, which represent physical production systems with their complex internal processes. Another benefit of combining techniques is the ability to evaluate a production system with a number of emerging problem modifications.

26 March 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Patrik GrznárPatrik Grznár
Patrik Grznár
LPLadislav Papánek
Ladislav Papánek
MMMilan Marčan
Milan Marčan
Martin KrajčovičMartin Krajčovič
Martin Krajčovič
IAIvan Antoniuk
Ivan Antoniuk
LMLucia Mozolová
Lucia Mozolová
Flexible custom manufacturing is becoming increasingly important, and, in the near future, it will serve as a key method to counter growing competition and meet market demands across most industrial sectors. This situation necessitates the substantial reorganization of companies’ material and information flows, as traditional planning approaches focused on serial production and longer time horizons are gradually losing their effectiveness. An integrated digital twin system that unifies production and logistics planning is emerging as a promising solution. The proposed approach entails implementing a digital twin directly within custom manufacturing, enabling the continuous monitoring and real-time adjustment of production plans based on instant data from sensors and information systems. The system architecture is designed around multiple modules responsible for data collection and processing, scheduling, simulation, statistical analysis, and effective communication between the system and its users. By leveraging these components, the solution can flexibly adapt to any deviations or changes as they occur. Within the scope of this research, attention is devoted not only to the handling of dynamic and random data but also to the prioritization of individual orders. Equally emphasized is the role of intelligent communication tools, which promptly inform us about shifts in the production process and allow for rapid plan modifications to ensure the highest possible levels of efficiency and reliability.

1 December 2022 in MM Science Journal
Verified
Journal Article
Closed access
Martin KrajčovičMartin Krajčovič
Martin Krajčovič
IAIvan Antoniuk
Ivan Antoniuk
LPLadislav Papánek
Ladislav Papánek
RFRadovan Furmann
Radovan Furmann
Vladimira BinasovaVladimira Binasova
Vladimira Binasova
VBVsevolod Bastiuchenko
Vsevolod Bastiuchenko
Due to the rapid increase and development of new information technologies, it is now possible to collect real data from the production process, thereby creating an image of a real plant in a virtual environment. The concept of a digital twin in the design of production systems consists of creating a digital twin of the entire production plant, which consists of a digital, real and virtual enterprise, which is a fundamental difference between the design of production systems in the concept of a digital enterprise and in the concept using a digital twin. The paper deals with the methodology of data collection, layout creation and the company's digital twin. The practical benefits of the proposed solution are mainly from the point of view of reducing the necessary time when designing the production layout, especially in the phase of variant design. Closely related to this is the possibility of checking a larger set of solutions, taking into account various limiting conditions. As this proposed solution reduces the time required in the phase of variant design, costs necessary for the creation of a new or changing production layout are reduced.