Pramuk Unahalekhaka

Dr. Pramuk Unahalekhaka

orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 May 2020 in IEEE Access
Verified
Journal Article
Open access
PUPramuk Unahalekhaka
Pramuk Unahalekhaka
PSPanot Sripakarach
Panot Sripakarach
This paper presents an analysis of the appropriate size and installation position of a battery energy storage system (BESS) for reducing reverse power flow (RPF). The system focused on photovoltaic (PV) system power plants. The RPF from the distribution system into the transmission systems impacts the power system due to the increased penetration of the PV system, which produces more power than load. The analysis was divided into three parts: 1) Analysis of the initial load and capacity of the PV power plant; 2) Analysis of the initial load and the load when the capacity of the PV power plant is increased; 3) Analysis of the increased load and capacity of the PV power plant. The stability of the system for each position of the BESS guided the analysis of the reduction of the RPF according to two criteria: reducing the RPF directly and smoothing the distribution load curve. The analysis of the appropriate installation position of the BESS was compared at three positions: 1) at a 115-kV bus; 2) at a 22-kV bus; 3) at a PV power plant. The results of this research showed that the BESS can reduce the RPF and increase the smoothing of the distribution load curve. It can also reduce energy loss and maximum power consumption. However, the appropriate installation position of the BESS was in the PV power plant, because this reduced the energy loss, power fluctuations and electricity production more than installing the BESS at a 115-kV bus or a 22- kV bus.

4 March 2025 in Energies
Verified
Journal Article
Open access
PDF file
NPNopphamat Promasa
Nopphamat Promasa
ESEkawit - Songkrohb
Ekawit - Songkrohb
SPSiamrat Phonkaphon
Siamrat Phonkaphon
KSKarun Sirichunchuen
Karun Sirichunchuen
CKChaliew Ketkaew
Chaliew Ketkaew
PUPramuk Unahalekhaka
Pramuk Unahalekhaka
This paper presents the optimization sizing of a battery energy storage system for residential use from load forecasting using AI. The solar rooftop panel installation and charging systems for electric vehicles are connected to the low-voltage electrical system of the Metropolitan Electricity Authority (MEA). The daily electricity demand for future load forecasting used the long short-term memory (LSTM) technique in order to analyze the appropriate size of the battery energy storage system (BESS) for residences. The solar rooftop installation capacity is 5.5 kWp, which produces an average of 28.78 kWh/day. The minimum actual daily load in a month is 67.04 kWh, comprising the base load and the load from charging electric vehicles, which can determine the size of the battery energy storage system as 21.03 kWh. For this research, load forecasting will be presented to find the appropriate size of BESS by considering the minimum daily load over the month, which is equal to 102.67 kWh, which can determine the size of the BESS to be 17.84 kWh. When comparing the size of BESS from actual load values with the load from the forecast, it can significantly reduce the size and cost of BESS.

7 March 2025 in Energies
Verified
Journal Article
Open access
PDF file
CPChatchanan Panapiphat
Chatchanan Panapiphat
ESEkawit - Songkrohb
Ekawit - Songkrohb
SPSiamrat Phonkaphon
Siamrat Phonkaphon
KSKarun Sirichunchuen
Karun Sirichunchuen
PUPramuk Unahalekhaka
Pramuk Unahalekhaka
This paper presents placement optimization for battery energy storage system installation using a fuzzy expert system. Nowadays, the Bangkok Metropolitan Administration (BMA) has installed CCTV cameras for surveillance, deterrence, and to record events as evidence for legal proceedings. However, in some areas, there is no BESS, so when the power goes out, recording cannot continue. This article uses a Fuzzy Logic Expert System to assess critical areas for the consideration of future BESS installation in Bangkok. The key factors include (1) the number of CCTV image requests from the Bangkok Metropolitan Administration, (2) the duration of power outages from the BMA, and (3) the total power consumption of the CCTV in each subdistrict. The study results show that the fuzzy expert system can effectively handle ambiguous data and improve decision-making. The Latkrabang and Lamphlatiew subdistricts have the most critical points where investment in BESS installation is most appropriate. The size of the BESS was determined based on the maximum recorded power outage duration of 57 min, with the backup power design for the BESS set at 1 h. The DIgSILENT program was used to determine the size of the BESS at each critical point, which was calculated to be 160.2 Wh.

2 February 2026 in Algorithms
Verified
Journal Article
Open access
PDF file
CPChatchanan Panapiphat
Chatchanan Panapiphat
ESEkawit - Songkrohb
Ekawit - Songkrohb
SPSiamrat Phonkaphon
Siamrat Phonkaphon
PUPramuk Unahalekhaka
Pramuk Unahalekhaka
This research develops a decision support system for prioritizing Battery Energy Storage System (BESS) installations at existing closed-circuit television (CCTV) camera locations experiencing power interruptions in Latkrabang subdistrict. The methodology integrates nine validated features: outage frequency, downtime duration, maximum outage duration, Net Present Value (NPV), combined ROI, outage impact score, annual BESS cost, combined risk score, and UPS installation cost, derived from historical power outage records (2020–2023) and engineering economics calculations. An unsupervised K-means clustering algorithm, validated through silhouette analysis and the elbow method, categorizes installations into five risk levels, namely critical, very high, high, medium, and low, addressing the absence of predefined ground truth labels. Subsequently, Support Vector Machine (SVM) with hyperparameter optimization classifies priority installations using stratified train-test splitting (80:20). The model was initially developed and validated using 82 CCTV cameras from Lamphla Tiew subdistrict (the pilot area). The validated model was then successfully applied to 101 CCTV cameras in Latkrabang subdistrict (the target area), identifying 27 critical installation points requiring immediate BESS deployment. The weighted recommendation system balances data-driven clustering with scoring: NPV (35%), outage impact (25%), combined ROI (20%), maximum outage duration (10%), and BESS cost efficiency (10%).

30 June 2026 in Clean Energy Science and Technology
Verified
Journal Article
Open access
SPSiamrat Phonkaphon
Siamrat Phonkaphon
ESEkawit Songkohb
Ekawit Songkohb
KSKarun Sirichunchuen
Karun Sirichunchuen
PUPramuk Unahalekhaka
Pramuk Unahalekhaka
This research presents the optimal sizing and costing of the solar system and battery energy storage system for automotive industrial base on load forecasting with nonlinear autoregressive using exogenous inputs of neural networks. The model uses hourly electricity consumption data from industrial plants, local temperature, and working or holiday days as training, validation, and testing data. For the annual and seasonal electricity forecasting models, the electricity consumption data is divided by season in Thailand, namely summer season (February–May), rainy season (June–September), and winter season (October–January). The experimental results found that the seasonal forecasting model was more effective, with a mean squared error (MSE) of 0.014, which is lower than the annual forecasting model with an MSE of 0.0161. The data obtained from seasonal electricity forecasting will be used in the design of solar systems and Battery Energy Storage Systems (BESS) using PVsyst software. The results from the system simulation show that the system consists of 336 solar panels with a total capacity of 208 kWp and a BESS system with a capacity of 1,565.4 kWh. It can produce 310,201 kWh of electricity per year and deliver 77,983 kWh of energy to the grid. Finally, this project can pay back within 7.2 years.