Chatchanan Panapiphat

Mr. Chatchanan Panapiphat


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 March 2025 in Energies
Verified
Journal Article
Open access
PDF file
CPChatchanan Panapiphat
Chatchanan Panapiphat
ESEkawit - Songkrohb
Ekawit - Songkrohb
SPSiamrat Phonkaphon
Siamrat Phonkaphon
KSKarun Sirichunchuen
Karun Sirichunchuen
PUPramuk Unahalekhaka
Pramuk Unahalekhaka
This paper presents placement optimization for battery energy storage system installation using a fuzzy expert system. Nowadays, the Bangkok Metropolitan Administration (BMA) has installed CCTV cameras for surveillance, deterrence, and to record events as evidence for legal proceedings. However, in some areas, there is no BESS, so when the power goes out, recording cannot continue. This article uses a Fuzzy Logic Expert System to assess critical areas for the consideration of future BESS installation in Bangkok. The key factors include (1) the number of CCTV image requests from the Bangkok Metropolitan Administration, (2) the duration of power outages from the BMA, and (3) the total power consumption of the CCTV in each subdistrict. The study results show that the fuzzy expert system can effectively handle ambiguous data and improve decision-making. The Latkrabang and Lamphlatiew subdistricts have the most critical points where investment in BESS installation is most appropriate. The size of the BESS was determined based on the maximum recorded power outage duration of 57 min, with the backup power design for the BESS set at 1 h. The DIgSILENT program was used to determine the size of the BESS at each critical point, which was calculated to be 160.2 Wh.

2 February 2026 in Algorithms
Verified
Journal Article
Open access
PDF file
CPChatchanan Panapiphat
Chatchanan Panapiphat
ESEkawit - Songkrohb
Ekawit - Songkrohb
SPSiamrat Phonkaphon
Siamrat Phonkaphon
PUPramuk Unahalekhaka
Pramuk Unahalekhaka
This research develops a decision support system for prioritizing Battery Energy Storage System (BESS) installations at existing closed-circuit television (CCTV) camera locations experiencing power interruptions in Latkrabang subdistrict. The methodology integrates nine validated features: outage frequency, downtime duration, maximum outage duration, Net Present Value (NPV), combined ROI, outage impact score, annual BESS cost, combined risk score, and UPS installation cost, derived from historical power outage records (2020–2023) and engineering economics calculations. An unsupervised K-means clustering algorithm, validated through silhouette analysis and the elbow method, categorizes installations into five risk levels, namely critical, very high, high, medium, and low, addressing the absence of predefined ground truth labels. Subsequently, Support Vector Machine (SVM) with hyperparameter optimization classifies priority installations using stratified train-test splitting (80:20). The model was initially developed and validated using 82 CCTV cameras from Lamphla Tiew subdistrict (the pilot area). The validated model was then successfully applied to 101 CCTV cameras in Latkrabang subdistrict (the target area), identifying 27 critical installation points requiring immediate BESS deployment. The weighted recommendation system balances data-driven clustering with scoring: NPV (35%), outage impact (25%), combined ROI (20%), maximum outage duration (10%), and BESS cost efficiency (10%).