Mustafa Oral

Prof. Dr. Mustafa Oral

orcid

Research Focus & Metrics

Academic Career Length

35Years (1992-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 June 2006 in Fisheries Research
Verified
Journal Article
Closed access
CTCemal Turan
Cemal Turan
MOMustafa Oral
Mustafa Oral
BÖBayram Öztürk
Bayram Öztürk
EDErtuğ Düzgüneş
Ertuğ Düzgüneş

1 August 2007 in Image and Vision Computing
Verified
Journal Article
Closed access
MOMustafa Oral
Mustafa Oral
UDUmut Deniz
Umut Deniz

1 October 2010 in Automation in Construction
Verified
Journal Article
Closed access
EOEmel Laptali Oral
Emel Laptali Oral
MOMustafa Oral
Mustafa Oral

1 March 2012 in Automation in Construction
Verified
Journal Article
Closed access
MOMustafa Oral
Mustafa Oral
EOEmel Laptali Oral
Emel Laptali Oral
AAAhmet Aydın
Ahmet Aydın

1 November 2018 in Teknik Dergi
Verified
Journal Article
Closed access
PDF file
MOMustafa Oral
Mustafa Oral
SBSiamak Bazaati
Siamak Bazaati
SASerkan Aydinli
Serkan Aydinli
EOEmel Oral
Emel Oral
Construction Site Layout Planning (CSLP) comprises determining, sizing and placing of the temporary facilities within the boundaries of a construction site by considering many factors. Traveling distance between facilities and safety risks are two essential factors that need to be minimized while planning site layout of a construction project. Many studies treated CSLP as a single objective optimization problem. They have mainly focused on either diminishing the travel cost of resources on site without considering the safety aspect or vice versa. While a few of the studies have treated the problem as a multi-objective optimization problem, none of them included a risk assessment approach including crane-related constraints. Hence, a user-friendly CSLP model that includes a risk assessment approach for safety constraints is proposed by using a Multi-Objective Particle Swarm Optimization algorithm based on Pareto dominance approach to minimize both the construction safety risks of crane operated projects and the total traveling distance of the resources between temporary facilities.

20 April 2016 in International Journal of Civil Engineering
Verified
Journal Article
Closed access
PDF file
EOEmel Laptalı Oral
Emel Laptalı Oral
MOMustafa Oral
Mustafa Oral
MAMehmet Andaç
Mehmet Andaç