Yiwei Qiu

Dr. Yiwei Qiu


Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 December 2022 in Applied Energy
Verified
Journal Article
Closed access
RQRuomei Qi
Ruomei Qi
JLJiarong Li
Jiarong Li
Jin LinJin Lin
Jin Lin
YSYonghua Song
Yonghua Song
JWJiepeng Wang
Jiepeng Wang
JWJian Wang
Jian Wang

18 August 2023 in Renewable Energy
Verified
Journal Article
Closed access
YQYiwei Qiu
Yiwei Qiu
BZBuxiang Zhou
Buxiang Zhou
TZTianlei Zang
Tianlei Zang
YZYi Zhou
Yi Zhou
SCShi Chen
Shi Chen
JLJin Lin
Jin Lin

29 April 2020 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
YQYiwei Qiu
Yiwei Qiu
Jin LinJin Lin
Jin Lin
FLFeng Liu
Feng Liu
YSYonghua Song
Yonghua Song
GCGang Chen
Gang Chen
LDLijie Ding
Lijie Ding
To exploit the massive solar energy available in the region, photovoltaic plants have been built in the mountain areas in Southwest China, coexisting with many small cascaded run-of-the-river hydropower plants, interconnected by short-distance transmission lines. Network constraints inside these systems are often negligible. However, due to the volatile nature of solar power and the weak connection to the external power grid, without proper coordination, solar power curtailment and water spillage are inevitable. To address this issue, this paper proposes an ultra-short-term stochastic generation control method for cascaded hydropower to mitigate solar power volatility. Two technical challenges are specifically addressed: to tackle the time-varying stochastic volatility of solar power, the Ito process model is introduced; to characterize the spatial-temporal hydraulic coupling of the cascaded hydropower plants and river operation constraints, a state-space dynamic river model derived from shallow water equations is included. Followingly, a stochastic control (SC) approach for hydropower generation based on stochastic programming is proposed, where hydropower generation commands are parameterized as affine functions of measured solar power, enabling quick response to solar power volatility. Simulation of a real-life cascaded hydro-solar system and a modified system verifies the proposed control method.

30 December 2022 in IEEE Transactions on Sustainable Energy
Verified
Journal Article
Closed access
XCXiang Cheng
Xiang Cheng
Jin LinJin Lin
Jin Lin
FLFeng Liu
Feng Liu
YQYiwei Qiu
Yiwei Qiu
YSYonghua Song
Yonghua Song
SWSirui Wu
Sirui Wu
Large-scale green hydrogen production system combining wind farms and electrolysis systems is an important way to low-carbon energy system. The flexible and fast ramping capability of the electrolysis system provides the possibility for a wind-electrolysis joint system (WEJS) to provide secondary frequency regulation (SFR) to reduce the production cost of green hydrogen. To increase the biddable capacity and improve the full load hours, this paper proposes a cooperative power allocation strategy for wind turbines and electrolyzers responding to the down and up AGC signals respectively. Furthermore, this paper proposes a more accurate method for estimating the daily hydrogen production due to response to the up ramping of automatic generation control (AGC) signals to ensure that the joint system meets the hydrogen production contract when providing SFR. Based on the above two points, this paper proposes a multi-timescale control framework and robust bidding optimization for a WEJS participating in energy and regulation markets. Case studies demonstrate that the relative error of daily hydrogen production can be controlled at 3.37%. The full load hours of the electrolysis systems can be increased by 50.21% compared with only participation in the energy market.

1 February 2018 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
YQYiwei Qiu
Yiwei Qiu
Hao WuHao Wu
Hao Wu
YSYonghua Song
Yonghua Song
JWJianhui Wang
Jianhui Wang
Power system static voltage stability region boundary (SVSRB) is a complicated hypersurface in parameter space. Due to inequality constraints such as generator reactive power limits, different critical points on the SVSRB may be related to different groups of active constraints and can be associated with different types of loadability limit, which makes it difficult to approximate the whole SVSRB at once or assemble many local approximations of the SVSRB. To overcome the difficulty, this paper proposes an approach for globally approximating the whole SVSRB considering generator reactive power limits at one go. First, a parametric optimization model incorporating all inequality constraints is formulated to describe the SVSRB, where the optimal solutions are the critical points on the SVSRB. The optimality condition, i.e., parametric Karush-Kuhn-Tucker conditions (KKT conditions), is also derived. Then, by applying the Galerkin method to the parametric KKT conditions in an interior-point-method-like manner, the whole SVSRB is approximated and represented using a single polynomial expression. Case studies in a 10-bus system and IEEE 300-bus system verify the effectiveness and accuracy of the proposed method.

1 May 2019 in Applied Energy
Verified
Journal Article
Closed access
YDYi Ding
Yi Ding
WCWenqi Cui
Wenqi Cui
SZShujun Zhang
Shujun Zhang
HHHongxun Hui
Hongxun Hui
YQYiwei Qiu
Yiwei Qiu
YSYonghua Song
Yonghua Song