Meisu Zhong

Dr. Meisu Zhong


Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 December 2018 in Computers & Industrial Engineering
Verified
Journal Article
Closed access
YYYongsheng Yang
Yongsheng Yang
MZMeisu Zhong
Meisu Zhong
YDYasser Dessouky
Yasser Dessouky
OPOctavian Postolache
Octavian Postolache

28 July 2020 in Transactions of the Institute of Measurement and Control
Verified
Journal Article
Closed access
PDF file
MZMeisu Zhong
Meisu Zhong
YYYongsheng Yang
Yongsheng Yang
SSShu Sun
Shu Sun
YZYamin Zhou
Yamin Zhou
OPOctavian Postolache
Octavian Postolache
YGYing-En Ge
Ying-En Ge
With the continuous increase in labour costs and the demands of the supply chain, improving the efficiency of automated container terminals has been a key factor in the development of ports. Automated guided vehicles (AGVs) are the main means of horizontal transport in such terminals, and problems in relation to their use such as vehicle conflict, congestion and waiting times have become very serious, greatly reducing the operating efficiency of the terminals. In this article, we model the minimum driving distance of AGVs that transport containers between quay cranes (QCs) and yard cranes (YCs). AGVs are able to choose the optimal path from pre-planned paths by testing the overlap rate and the conflict time. To achieve conflict-free AGV path planning, a priority-based speed control strategy is used in conjunction with the Dijkstra depth-first search algorithm to solve the model. The simulation experiments show that this model can effectively reduce the probability of AGVs coming into conflict, reduce the time QCs and YCs have to wait for their next task and improve the operational efficiency of AGV horizontal transportation in automated container terminals.

22 January 2025 in Transport Policy
Verified
Journal Article
Closed access
CYChuanzhong Yin
Chuanzhong Yin
LZLingyong Zeng
Lingyong Zeng
XFXiaowen Fu
Xiaowen Fu
MZMeisu Zhong
Meisu Zhong

Verified
Journal Article
Open access
PDF file
YYYongsheng Yang
Yongsheng Yang
SSShu Sun
Shu Sun
MZMeisu Zhong
Meisu Zhong
JFJunkai Feng
Junkai Feng
FWFurong Wen
Furong Wen
HSHaitao Song
Haitao Song
A U-shaped automated container terminal (ACT) has been proposed for the first time globally and has been adopted to construct the Beibu Gulf Port ACT. In this ACT layout, the double cantilevered rail crane (DCRC) simultaneously provides loading and unloading services for the external container trucks (ECTs) and the automatic guided vehicles (AGVs) entering the yard. The DCRC has a complex scheduling coupling relationship with the AGV and the ECT, and its mathematical model is extremely complex. There is an urgent need to study a practical collaborative scheduling optimization model and algorithm for the DCRC, the AGV, and the ECT. In this paper, we optimize the process flow of DCRCs to study the refined collaborative scheduling model of DCRCs, AGVs and ECTs in U-shaped ACTs. Firstly, we analyze the operation process of the DCRC and divide the 16 loading and unloading conditions of the DCRC into four operation modes for process optimization. Secondly, different variables and parameters are set for the DCRC’s four operating modes, and a refined collaborative dispatching model for the DCRCs with AGVs and ECTs is proposed. Finally, a practical adaptive co-evolutionary genetic algorithm solves the model. Meanwhile, arithmetic examples verify the correctness and practicality of the model and algorithm. The experimental results show that the total running time of the DCRCs is the shortest in the U-shaped ACT when the number of quay cranes (QC) to DCRC and AGV ratios are 1:2 and 1:10, respectively. At the same time, the number of QCs and DCRCs has a more significant impact on the efficiency of the ACT than that of AGVs, and priority should be given to the allocation of QCs and DCRCs. The research results have essential guidance value for U-shaped ACTs under construction and enrich the theory and method of collaborative scheduling of U-shaped ACT equipment.

1 January 2019 in Mathematical Problems in Engineering
Verified
Journal Article
Open access
PDF file
MZMeisu Zhong
Meisu Zhong
YYYongsheng Yang
Yongsheng Yang
YZYamin Zhou
Yamin Zhou
Octavian Adrian PostolacheOctavian Adrian Postolache
Octavian Adrian Postolache
With the development of automated container terminals (ACTs), reducing the loading and unloading time of operation and improving the working efficiency and service level have become the key point. Taking into account the actual operation mode of loading and unloading in ACTs, a mixed integer programming model is adopted in this study to minimize the loading and unloading time of ships, which can optimize the integrated scheduling of the gantry cranes (QCs), automated guided vehicles (AGVs), and automated rail‐mounted gantries (ARMGs) in automated terminals. Various basic metaheuristic and improved hybrid algorithms were developed to optimize the model, proving the effectiveness of the model to obtain an optimized scheduling scheme by numerical experiments and comparing the different performances of algorithms. The results show that the hybrid GA‐PSO algorithm with adaptive autotuning approaches by fuzzy control is superior to other algorithms in terms of solution time and quality, which can effectively solve the problem of integrated scheduling of automated container terminals to improve efficiency.

25 June 2025 in Computers & Industrial Engineering
Verified
Journal Article
Closed access
YYYu-Qi Yin
Yu-Qi Yin
MZMeisu Zhong
Meisu Zhong
YGYing-En Ge
Ying-En Ge