ZHI Cao

Mr. ZHI Cao


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
12 January 2025 in Sustainability
Verified
Journal Article
Open access
PDF file
PCPing Cao
Ping Cao
JWJiawei Wang
Jiawei Wang
DHDinglei Huang
Dinglei Huang
ZCZHI Cao
ZHI Cao
DLDanyang Li
Danyang Li
Energy-saving renovation of rural residences is an effective means of promoting sustainable rural development. This study focuses on a single-story rural residential building located in Tongchuan City, Shaanxi Province, China (a cold region), as a case study. Retrofits were conducted on the exterior windows, roof, and exterior walls, with the addition of a sunroom. Using life cycle assessments (LCAs) and orthogonal experimental methods combined with value engineering principles, we calculated various indicators including the energy efficiency improvement rate, implied carbon emissions, proportion of implied carbon emissions, carbon footprint, carbon reduction rate, carbon payback period, and investment payback period. The impact of traditional retrofitting measures on these indicators was analyzed. The results indicate that carbon emissions from the production of building materials are a key concern among the embodied carbon emissions from the retrofits, while transportation, construction, and demolition contribute minimally. Changes in the depth of the sunroom had the most significant impact on comprehensive indicators, followed by changes to the roof. After retrofitting, the carbon reduction rate was underestimated by 9.35% to 12.02% due to embodied carbon emissions. The carbon payback period for all schemes is estimated to be between 3.27 and 4.21 years. Based on current market conditions, developing corresponding carbon economics can enhance the economic viability of the project. This approach extends the investment payback period by more than 7% while also helping to narrow the income gap between urban and rural residents to some extent. Overall, the environmental impact assessment of the alternative schemes promotes sustainable rural development and provides scientific and effective guidance for the construction of project decision-making evaluation systems and architectural designers.

16 April 2025 in Buildings
Verified
Journal Article
Open access
PDF file
PCPing Cao
Ping Cao
ZCZHI Cao
ZHI Cao
DHDinglei Huang
Dinglei Huang
JWJiawei Wang
Jiawei Wang
Building Information Modeling (BIM) has recently gained popularity in the public building industry, and BIM is widely implemented in the construction industry in many developed countries around the world. In this paper, in order to evaluate the application level of BIM technology in assembly buildings in China, five maturity levels of BIM application in assembly buildings are established based on the commonly used maturity model, including the initial level, the starting level, the management level, the integration level, and the continuous optimization level. In order to construct a maturity evaluation index system for BIM application in prefabricated buildings, the literature review method was chosen to identify the indexes initially, the indexes were optimized by combining the questionnaire survey method, and using the balanced scorecard model, the maturity evaluation index system for BlM application in prefabricated buildings consisting of one target level, five guidance levels, thirteen graded element levels and thirty-one secondary index levels were identified. Based on this framework, the study establishes a maturity assessment model for BIM application in prefabricated buildings through three methodological integrations. First, the hierarchical analysis method Analytic Hierarchy Process (AHP) was employed to assign weights to indexes within the evaluation system. Subsequently, the Entropy Weight Method (EWM) was utilized to systematically construct the index system. This quantitative foundation was then combined with fuzzy comprehensive evaluation principles to develop the integrated assessment model. The practical application of this model was demonstrated through a case study of a prefabricated building project in China. The assessment results revealed that the project’s BIM application maturity level falls within the transitional phase “between the management level and integrated level”, indicating progressive but not yet fully optimized implementation. The result verifies the validity of the assessment model and proposes corresponding optimization suggestions based on the assessment results.

25 July 2024 in Buildings
Verified
Journal Article
Open access
PDF file
YWYanfang Wen
Yanfang Wen
DHDinglei Huang
Dinglei Huang
ZCZHI Cao
ZHI Cao
With the rapid development of urban rail transportation, people’s demand for subways has gradually manifested itself. The inherent complex attributes of subway project construction determine that subway project construction has a relatively high risk, resulting in huge losses. This paper takes the opportunistic behavior of the subway project as the research object, proposes the opportunistic behavior identification process, and constructs the opportunistic behavior identification model based on the BP neural network. Firstly, through the collection and analysis of subway accident cases, the main forms of opportunistic behavior are summarized, and the primary characteristic indicators for opportunistic behavior recognition are extracted using cluster analysis. Secondly, a recognition model based on a BP neural network is designed. The number of neurons in the input layer, hidden layer, and output layer of the model is determined, and the recognition model is subsequently trained and tested to validate its feasibility. Finally, the constructed opportunistic behavior recognition model is applied to an actual subway construction project, revealing that the construction enterprise of the project in question exhibits a high level of opportunistic behavior risk. Overall, the research results of this paper have important theoretical significance and practical value for the management level of subway project construction enterprises under the new situation and the identification and governance of opportunistic behavior of subway project construction enterprises.

14 April 2025 in Buildings
Verified
Journal Article
Open access
PDF file
PCPing Cao
Ping Cao
DLDanyang Li
Danyang Li
ZCZHI Cao
ZHI Cao
DHDinglei Huang
Dinglei Huang
JWJiawei Wang
Jiawei Wang
Critical paths are widely used in project schedule management, but most existing studies ignore the volatility and dynamic characteristics of project duration, which increases the risk of project implementation. This paper proposes a dynamic optimization model of random duration and the EVM (earned value method) based on critical path technology. The random duration based on a lognormal distribution is introduced into critical path technology, and the completion probability model is established to evaluate the fluctuation of the project completion schedule. Then, the earned value correction model is established and combined with performance indicators to improve the dynamic management system of proactive scheme scheduling and reactive scheme scheduling. The proposed method can fully consider the fluctuation and dynamics of the project duration, effectively reduce the errors caused by the uncertain fluctuation of the duration, and further improve scientific management and reduce management costs.