Yanfang Wen

Prof. Dr. Yanfang Wen

orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
25 July 2024 in Buildings
Verified
Journal Article
Open access
PDF file
YWYanfang Wen
Yanfang Wen
DHDinglei Huang
Dinglei Huang
ZCZHI Cao
ZHI Cao
With the rapid development of urban rail transportation, people’s demand for subways has gradually manifested itself. The inherent complex attributes of subway project construction determine that subway project construction has a relatively high risk, resulting in huge losses. This paper takes the opportunistic behavior of the subway project as the research object, proposes the opportunistic behavior identification process, and constructs the opportunistic behavior identification model based on the BP neural network. Firstly, through the collection and analysis of subway accident cases, the main forms of opportunistic behavior are summarized, and the primary characteristic indicators for opportunistic behavior recognition are extracted using cluster analysis. Secondly, a recognition model based on a BP neural network is designed. The number of neurons in the input layer, hidden layer, and output layer of the model is determined, and the recognition model is subsequently trained and tested to validate its feasibility. Finally, the constructed opportunistic behavior recognition model is applied to an actual subway construction project, revealing that the construction enterprise of the project in question exhibits a high level of opportunistic behavior risk. Overall, the research results of this paper have important theoretical significance and practical value for the management level of subway project construction enterprises under the new situation and the identification and governance of opportunistic behavior of subway project construction enterprises.

25 November 2025 in Buildings
Verified
Journal Article
Open access
PDF file
YWYanfang Wen
Yanfang Wen
CZChenyu Zhang
Chenyu Zhang
PCPing Cao
Ping Cao
YWYunhe Wang
Yunhe Wang
As a vital component of urban transportation systems, subways play a crucial role in the development of a city. However, opportunistic behaviors by subway construction contractors frequently occur, adversely affecting project objectives. This study employs literature review methods to identify six key dimensions that influence the governance of opportunistic behaviors by subway project contractors, thereby constructing a theoretical model of governance factors. Based on this theoretical framework, hypothesis testing and questionnaire design were conducted. Structural Equation Modeling (SEM) path analysis identified construction process management as the direct cause influencing the governance of opportunistic behavior by subway project contractors, exerting a direct effect on such governance. Meanwhile, industry standardization, external oversight mechanisms, project governance quality, contractor credit evaluation, and internal organizational controls within the construction firm were identified as indirect governance factors. A system dynamics model was employed for dynamic simulation analysis of the governance system, revealing the dynamic evolution of opportunistic behavior governance levels under various influencing factors. Scenario simulations identified the pathway, industry standardization → internal controls within the construction organization → project governance quality → construction process management → opportunistic behavior governance, as yielding the lowest frequency of opportunistic behavior occurrence and optimal governance levels. The findings provide a governance basis for addressing the frequent occurrence of opportunistic behavior in subway construction projects.