Xuesheng Liu

Dr. Xuesheng Liu


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
6 November 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
RZRuojun Zhu
Ruojun Zhu
XYXizhan Yue
Xizhan Yue
YGYD Gao
YD Gao
XLXuesheng Liu
Xuesheng Liu
Xuebin LiXuebin Li
Xuebin Li
KWKun Wang
Kun Wang
The superposition effect of the advanced support pressure of the working face in the final mining stage and the lateral support stress of the roadway is a key factor affecting the stability of the retracement channel. To study the stress evolution of the retracement channel under the super-thick nappe and the timing of strengthening support, this paper takes the mining of the 360808 working face in Xinji No. 1 Mine as the engineering background, analyzes the occurrence conditions of the working face and the measured rock pressure law, and constructs a roof structure model of the retreat area. The UDEC discrete element numerical simulation software was used to analyze the evolution characteristics of concentrated stress and the failure law of surrounding rock around the retracement channel under gradual excavation conditions. Based on the relationship between the position of the main roof fracture and the stability of the surrounding rock of the retracement channel, the instability mechanism of the surrounding rock of the retracement channel was revealed. A mechanical model of the surrounding rock of the retracement channel under the condition of a gradient coal pillar was established, and the energy criterion K for the instability of the surrounding rock was obtained. The method of adding anchor cables to strengthen the support of the surrounding rock of the retracement channel was proposed. The results indicate that the accumulation of energy in the surrounding rock of the retracement channel is greater than the internal consumption of energy, which is the direct reason for the instability of the surrounding rock of the retracement channel. The time to strengthen the support of the roof is when the working face is 15 m away from the retracement channel. According to the analysis of on-site monitoring results, the roof convergence and the two-sides convergence before and after strengthening the support were reduced by 90 mm and 140 mm, respectively. Under the strengthening of support, the slope of the retracement channel in the 360808 working face is slight, without roof fall, and the surrounding rock of the channel is effectively controlled, which is of great significance for ensuring the safe application of the retracement channel. It has reference value for the safety production of surrounding mines and is conducive to promoting the sustainable development of local resource-based society and economy.

23 March 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
ZHZhendi Huang
Zhendi Huang
KWKun Wang
Kun Wang
XLXuesheng Liu
Xuesheng Liu
YZYongqiang Zhao
Yongqiang Zhao
XLXuebin Li
Xuebin Li
YZYu Zhou
Yu Zhou
Adjacent, multi-working face mining can expand the range of disturbed overburden, increasing the risk of triggering roof water inrush, which threatens the safe operation of coal mines. In this paper, we propose a risk identification method for roof water inrush under multi-working face mining conditions based on the theory of Key Strata and Full Mining Disturbance. Firstly, the key strata of the overburden are determined based on lithological and structural data from exploration boreholes. A formula is then derived to calculate the critical dimension (L) of the working face that could induce a fracture in the key stratum. The relationship between L and the combined width of the preceding and adjacent working faces is analyzed to assess whether the key stratum is fractured and how it affects the preceding working face. Finally, the height of the water-conducting fracture zone is predicted. The impact of repeated disturbances from multi-working face mining is evaluated to determine whether the height of the water-conducting fracture zone in the preceding working face increases, thereby enabling risk identification for roof water inrush under multi-working face mining conditions. Taking the multi-working faces of the Banji Coal Mine in Anhui Province as a case study, the predicted height of the water-conducting fracture zone is 60 m, with no risk of delayed roof water inrush in the preceding working face. Both numerical simulation results and field measurements of the development height of the water-conducting fracture zone confirm the effectiveness of this method. It is capable of accurately predicting the development height of the water-conducting fracture zone under multi-working face mining conditions and identifying the associated risk of roof water inrush, thus providing a valuable reference for ensuring safe mining operations in multi-working face mining conditions.

22 December 2022 in Materials
Verified
Journal Article
Open access
PDF file
RZRuojun Zhu
Ruojun Zhu
XYXizhan Yue
Xizhan Yue
XLXuesheng Liu
Xuesheng Liu
ZSZhihan Shi
Zhihan Shi
Xuebin LiXuebin Li
Xuebin Li
During the mining activity under the super-thick nappe formed by thrust fault, the law of mine pressure behavior is complex, and it is difficult to control the deformation and failure of surrounding rock. Combined with the actual engineering conditions, the influence of different roof lithology conditions, the thickness of nappe, the mining height, the size of the barrier coal pillar, and the creep time on mine pressure behavior was studied by UDEC numerical simulation software. The results showed that with the advancement of the coal face, due to the influence of the mining of the coal face and the slip dislocation of the super-thick nappe along the thrust faults, the roof-to-floor convergence, the two-sided convergence, and the maximum concentrated stress in the roadway-concentrated areas are significantly increased. For the above five influencing factors, the greater the thickness of the nappe and the mining height, the longer the creep time, and the stronger the ground pressure behavior. The larger the size of the barrier coal pillar, the stronger the roof lithology, and the gentler the ground pressure behavior. The research results can provide some reference for monitoring the law of ground pressure behavior in roadway-concentrated areas under super-thick nappe.