Mohammad Mojtahedi

Dr. Mohammad Mojtahedi

School of Built Environment, UNSW, Sydney, New South Wales, Australia

Research Focus & Metrics

Academic Career Length

19Years (2008-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
6 July 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
HMHafiz Suliman Munawar
Hafiz Suliman Munawar
Fahim UllahFahim Ullah
Fahim Ullah
Siddra QayyumSiddra Qayyum
Siddra Qayyum
SKSara Imran Khan
Sara Imran Khan
Mohammad MojtahediMohammad Mojtahedi
Mohammad Mojtahedi
Floods have been a major cause of destruction, instigating fatalities and massive damage to the infrastructure and overall economy of the affected country. Flood-related devastation results in the loss of homes, buildings, and critical infrastructure, leaving no means of communication or travel for the people stuck in such disasters. Thus, it is essential to develop systems that can detect floods in a region to provide timely aid and relief to stranded people, save their livelihoods, homes, and buildings, and protect key city infrastructure. Flood prediction and warning systems have been implemented in developed countries, but the manufacturing cost of such systems is too high for developing countries. Remote sensing, satellite imagery, global positioning system, and geographical information systems are currently used for flood detection to assess the flood-related damages. These techniques use neural networks, machine learning, or deep learning methods. However, unmanned aerial vehicles (UAVs) coupled with convolution neural networks have not been explored in these contexts to instigate a swift disaster management response to minimize damage to infrastructure. Accordingly, this paper uses UAV-based aerial imagery as a flood detection method based on Convolutional Neural Network (CNN) to extract flood-related features from the images of the disaster zone. This method is effective in assessing the damage to local infrastructures in the disaster zones. The study area is based on a flood-prone region of the Indus River in Pakistan, where both pre-and post-disaster images are collected through UAVs. For the training phase, 2150 image patches are created by resizing and cropping the source images. These patches in the training dataset train the CNN model to detect and extract the regions where a flood-related change has occurred. The model is tested against both pre-and post-disaster images to validate it, which has positive flood detection results with an accuracy of 91%. Disaster management organizations can use this model to assess the damages to critical city infrastructure and other assets worldwide to instigate proper disaster responses and minimize the damages. This can help with the smart governance of the cities where all emergent disasters are addressed promptly.

1 March 2017 in International Journal of Disaster Risk Reduction
Verified
Journal Article
Closed access
Mohammad MojtahediMohammad Mojtahedi
Mohammad Mojtahedi
BOBee Lan Oo
Bee Lan Oo

8 January 2019 in Buildings
Verified
Journal Article
Open access
PDF file
Kamyar KabirifarKamyar Kabirifar
Kamyar Kabirifar
Mohammad MojtahediMohammad Mojtahedi
Mohammad Mojtahedi
The Construction Industry is a complex and fragmented industry worldwide with regards to its supply chain, products, and processes, and is faced with a similar dilemma as faced by manufacturers during its time in past decades. Scope, time, and cost are the triple constraints of project management and leading factors in defining the project performance. Productivity and efficiency of each construction project is measured through its triple constraints, therefore the factors that affect project success are significantly important. Despite the importance of understanding project performance indicators, few empirical studies have been conducted over the last decade in terms of analyzing the factors that determine the performance of high-rise buildings in Engineering, Procurement, and Construction (EPC) projects. Hence, the aim of this paper is to analyze and rank EPC critical activities across large-scale residential construction projects in Iran, by using the TOPSIS method as a multi-attribute group decision-making technique. Results indicate that engineering design, project planning and controls are significant factors contributing to the project performance. In addition, engineering has a pivotal role in project performance and this significance is followed by the construction phase. On the contrary, all believe procurement is more important than Construction phase.

1 November 2019 in International Journal of Disaster Risk Reduction
Verified
Journal Article
Closed access
CLChinh Luu
Chinh Luu
JMJason von Meding
Jason von Meding
Mohammad MojtahediMohammad Mojtahedi
Mohammad Mojtahedi

1 April 2010 in Safety Science
Verified
Journal Article
Closed access
Mohammad MojtahediMohammad Mojtahedi
Mohammad Mojtahedi
SMS. Meysam Mousavi
S. Meysam Mousavi
AMAhmad Makui
Ahmad Makui

26 August 2019 in Buildings
Verified
Journal Article
Open access
PDF file
Samad SepasgozarSamad Sepasgozar
Samad Sepasgozar
Reyhaneh KarimiReyhaneh Karimi
Reyhaneh Karimi
Sara ShirowzhanSara Shirowzhan
Sara Shirowzhan
Mohammad MojtahediMohammad Mojtahedi
Mohammad Mojtahedi
SESabbar Ebrahimzadeh
Sabbar Ebrahimzadeh
DMDavid McCarthy
David McCarthy
Delay is one of the main challenges of construction projects, and there is still much to overcome in order to reach near zero delay in all construction projects. This project aims to conduct a systematic critical review including a bibliography analysis on delay literature in construction. The main questions consider what has been learnt from a decade investigating delay causes and effects in the construction literature and what factors have been missed in the literature. This paper also presents a new and challenging question regarding how digital tools and associated technologies may prevent any delay in construction projects, which can change the research direction from delay investigations to identifying prevention factors. The paper identifies the delay dataset, including 493 papers investigating delay in construction, and establishes a specific dataset of papers focusing on delay effects and causes (DEC), including 94 selected papers covering different factors examined in over 29 countries such as Iran, India, Turkey, Bangladesh, Saudi Arabia, the United Arab Emirates (UAE), Cambodia, Oman, Malaysia, Taiwan, China, Vietnam, the US, the UK, and Egypt. In addition, the paper identifies 30 critical factors with the frequency of occurrences over three times in the DEC dataset and computes their medians of ranking. This paper also discusses digital tools and methods that can be used for delay analysis and preventions, including MS Project, Oracle Primavera P6, and Open Plan by Deltek. The paper discusses the project schedule delay analysis from project management methodology perspectives. It also discusses the current method’s limitations and future directions, which are based on the identification of the deficiency areas. In total, four overlooked factors are identified and suggested, including faulty data analysis, unmatched structure of the research questionnaires with new knowledge and standards [e.g., Project Management Body of Knowledge (PMBOK)], overlooked effects of digital technologies [e.g., Digital twin, Navisworks, Building Information Model (BIM), Geographic Information System (GIS), and Integrated Project Delivery (IPD)], and ignored job-site technologies. In addition, the paper presents the DEC model for future studies, including four main key factors. These factors are resources (e.g., project budgets, labour, material, equipment, and digital tool), project context, stakeholders performance (e.g., owner/client, consultant/designer, contractor, vendor/supplier), and external factors (e.g., ground condition, site location, regulation, natural disaster), which may significantly affect delay prevention and should be concurrently considered in the future delay investigations, since they may be required for designing an effective mitigation strategy when these proof points are identified. This would significantly help to utilise digital systems to prevent time overruns in different construction contexts.