Zhonghua Xu

Prof. Zhonghua Xu


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 March 2025 in Buildings
Verified
Journal Article
Open access
PDF file
YZYinhang Zhu
Yinhang Zhu
WWWeidong Wang
Weidong Wang
ZXZhonghua Xu
Zhonghua Xu
JCJin-jian Chen
Jin-jian Chen
JZJi Zhang
Ji Zhang
In order to exploit the deep underground space, the construction of ultra-deep excavation in Shanghai is growing rapidly. In multi-aquifer strata, deep excavations typically require dewatering of confined aquifers to ensure engineering safety. However, existing studies have seldom conducted in-depth analysis on the influence of the soil parameters and construction measures on the deformation of retaining structures. In this study, a three-dimensional hydro-mechanical numerical model was developed to evaluate the performances of excavation and dewatering of the foundation pit. The model was validated by comparing the calculated and measured wall deflections and groundwater drawdowns of a 45 m ultra-deep double-wall excavation in Shanghai. According to the characteristics of soil stratification and construction activities, three parameters were selected for subsequent analysis, including the hydraulic conductivity of aquitard below the bottom of the pit, the pumping rate in the second confined aquifer and the construction of TRD wall. The stress distributions on both sides of the diaphragm wall were examined to elucidate the deformation mechanism. The results indicate that the aquitard hydraulic conductivity directly affects the effective stress of the overlying aquifer, which plays a crucial role in resisting wall deflection. An increase in the hydraulic conductivity leads to smaller effective stress, greater wall deflection and larger ground settlement. While an appropriately increased pumping rate enhances effective stress, over-pumping may induce excessive wall deflection at depth and disproportionate ground settlement. The TRD wall is quite useful in terms of waterproofing but the effect on deformation control is limited. The findings of this study provide valuable insights for engineering practices and the optimization of deep excavation construction measures in multi-aquifer strata.

21 April 2025 in Buildings
Verified
Journal Article
Open access
PDF file
SWShuo Wang
Shuo Wang
WWWeidong Wang
Weidong Wang
ZXZhonghua Xu
Zhonghua Xu
QSQingjun Song
Qingjun Song
JQJiangu Qian
Jiangu Qian
To ensure the stability of deep foundation pits in confined aquifers, dewatering is often required. However, pumping from confined aquifers in large deep foundation pit groups may lead to significant environmental deformations. Therefore, field pumping and recharge tests are required to guide design of groundwater and environmental deformation control scheme. Focusing on a super-large deep foundation pit group in Shanghai, single-well pumping, multi-well pumping, and recharge tests were conducted in distinct geological zones (normally consolidated area and paleochannel zone). The hydraulic connectivity and spatiotemporal patterns of groundwater drawdown and soil settlement were systematically analyzed. The results show that: (1) There exists a certain hydraulic connection between the first and second confined aquifers. In the paleochannel area, the aquitard between the micro-confined and the first confined aquifer is insufficient to completely block hydraulic connectivity. (2) The ratio of ground surface settlement to groundwater drawdown is about 3.4 mm/m, and the deep soil settlement is significantly or even greater than the surface settlement, so it is necessary to strengthen the monitoring of deep settlement. (3) Recharge can elevate the groundwater and reduce settlement; however, it is difficult to eliminate the variation in settlement along the vertical direction.

2 February 2025 in Buildings
Verified
Journal Article
Open access
PDF file
HHHexiang Hu
Hexiang Hu
Yu TianYu Tian
Yu Tian
NZNeimeng Zheng
Neimeng Zheng
XDXiuli Du
Xiuli Du
HGHaishan Guo
Haishan Guo
ZXZhonghua Xu
Zhonghua Xu
The foundation pit area of Kunming International Comprehensive Transportation Hub is 56,800 m2, and the excavation depth ranges from 18 m to 25 m. Because the surrounding environment is very complex, the foundation pit is supported by an underground continuous wall and three layers of internal support system with seven rings. The force of this internal support system is coupled integrally, and the number of rings is the highest in the world at present. In this work, a finite element model considering the interaction between soil and the retaining structure is established. The Hardening Soil model with small strain stiffness is used to simulate and analyze the whole excavation process of the foundation pit. Considering the ultra-large plane size of the foundation pit, we cannot ignore the temperature effect, so the deformation of the underground continuous wall and the force of the internal support system under seasonal temperature variation are investigated. By comparing numerical simulation results with field measurements, the deformation of the ultra-large seven-ring internal support system, the deformation of the surrounding soil, and the axial force of the supports are analyzed. The results show that the finite element simulation agrees well with the measured data. This work provides a reliable method for analyzing ultra-large deep foundation pits.