/ He

Dr. / He


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
22 July 2024 in Materials
Verified
Journal Article
Open access
PDF file
ZYZhijie Yu
Zhijie Yu
SLShujie Liu
Shujie Liu
JZJiwei Zhang
Jiwei Zhang
/H/ He
/ He
QTQinghao Tian
Qinghao Tian
JSJinze Sun
Jinze Sun
Polycarboxylate superplasticizers BMC-L and BMC-S were utilized as modifiers in the formulation of novel cement-based grouting materials. Indoor tests were conducted on 32 groups of cement slurries, varying by water–cement ratio (0.5:1 and 0.6:1) and modifier content (0, 2‰, 4‰, 6‰, 8‰, 10‰, 12‰, and 14‰), to test their density, funnel viscosity, water separation rate, and stone rate. Four groups of slurry modified with BMC-L were selected as the preferred slurry, and the apparent viscosity test, uniaxial, and triaxial compression test of the slurry stone body were conducted. The study investigated the influence of BMC-L on various properties of the slurry, including its apparent viscosity, uniaxial compressive strength, stress–strain relationships, shear strength parameters, and elastic modulus. Ultimately, the pore structure and phase composition of the slurry stone body were detected by Nuclear Magnetic Resonance (NMR) and X-ray Diffraction (XRD), and the impact of BMC-L on slurry performance was examined from a microstructural perspective. Results indicate that the two polycarboxylate superplasticizers exert minimal influence on the density and water separation rate of the slurry. Within the effective incorporation range of the polycarboxylate superplasticizer, increasing the dosage correlates with a decrease in both the stone rate and viscosity of the slurry. BMC-L significantly enhances the mechanical properties of the slurry stone body by promoting more complete cement hydration and reducing porosity. The uniaxial compressive strength of slurry stone body with a 6 ‰ BMC-L dosage reached 29.7 MPa after 7 days and 38.5 MPa after 28 days of curing, representing increases of 118.4% and 64%, respectively, compared to masonry with 0 BMC-L dosage. The shear strength parameters and elastic modulus of the slurry stone body also showed corresponding increases.

19 May 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
FXFuxing Xie
Fuxing Xie
ZZZhixuan Zhang
Zhixuan Zhang
/H/ He
/ He
DCDongdong Chen
Dongdong Chen
The fault fracture zone has the characteristics of low strength and poor water resistance. These factors often lead to stress concentration and significant deformation during roadway excavation. In order to improve the anti-deformation ability and strength of the surrounding rock and reduce the support pressure, taking the roadway passing through the F2 fault in the Wugou coal mine as an example, the evolution characteristics of the surrounding rock of the roadway passing through the fault were studied using FLAC3D numerical simulation software, and the stress evolution law and failure characteristics of the surrounding rock in three stages of the roadway driving through the fault fracture zone were analyzed. The slurry diffusion characteristics under different grouting hole layouts were studied using COMSOL software, and the effectiveness of ground directional grouting (combined directional drilling technology with ground grouting technology) reinforcement technology was explored via similar simulation experiments. After the pre-grouting reinforcement of the surrounding rock by the ground directional hole in the field, the fault fracture zone was successfully excavated. The key technical system of the shield roadway passing through the fault based on the directional drilling and ground grouting technology was summarized and put forward. The three-hole drilling and the circumferential four-hole drilling layouts were used to realize the grouting in the fault fracture zone. Engineering practice shows that ground directional grouting has significant advantages and improves the mechanical properties of the broken weak surrounding rock. The deformation of the roadway roof is 128 mm, and the deformation of the two sides is controlled within 100 mm. This method greatly improves the stability of the roadway and has been verified by the field results.

1 February 2020 in IOP Conference Series: Earth and Environmental Science
Verified
Conference Paper
Open access
/H/ He
/ He
XGXiaogeng Gao
Xiaogeng Gao
XFXuhai Feng
Xuhai Feng
In order to ensure the safe and rapid excavation of the shaft, the blind shaft of MAO PING mine was treated by pre-grouting. The “S” borehole directional drilling was used, and the clay cement grout was selected as the grouting material. After the completion of the construction, the remaining water inflow of the shaft grouting section was measured to be 4.83m3/h by water pressure test. The blind shaft pre-grouting project has been successfully implemented, and its design and construction technology have important guiding significance for the application of water prevention and control in mining areas which located in southwest China.