Historic buildings that have survived to the present day have been subject to maintenance, repair, and overhaul. Repair work is being carried out so that it can be enjoyed by future generations. However, there have been changes in the construction technology: some construction products have been discontinued and replaced with others of different quality parameters, lower prices, etc. It is necessary to use substitute products during construction work—that is, replacement products that are shaped after the original. Therefore, there is a problem of selecting the best possible substitute material, taking into account many important factors, including the recommendations and requirements of the conservator. This paper presents a methodology for the process of material substitution planning and selection of a substitute with the use of multicriteria analysis, by implementing it in the refurbishment of a historic building façade.
Currently, more and more investments are carried out in areas with difficult ground conditions, where in addition there may be a high level of groundwater. Therefore, it is necessary to use technologies which ensure the safety of the building in the exploitation phase by, among others, ensuring appropriate leak-tightness of its underground part. The article focuses on presenting the application of watertight concrete system (WCS), also known as "white tub" technology, which is an effective way to protect the underground part of the building against the destructive effects of water. The aim of this paper is to present and analyze selected methods of securing the underground parts of erected buildings using the "white tub" technology. In this paper, the authors analyze and select the solution using a multi-criteria analysis. The presented method will be used on a selected object.
Artykuł przedstawia problematykę BIOZ logistykizaopatrzenia budowy w zasoby, na granicy zewnętrznego łańcuchadostaw i procesów wewnętrznych, obejmujących procesyprzyjęcia towarów, wjazdu i manewrowania środków transportowych,prac wyładunkowych i przeładunku na składy luburządzenia transportu poziomego, lub pionowego wykonawcyrobót. Ten obszar prac, jak wynika z przeprowadzonych badań,generuje wypadkowość i niestety nie podlega właściwej uwadzeuczestników przedsięwzięcia budowlanego ani też badaniom naukowym.W celu oceny stanu BIOZ w realizacji procesów zaopatrzeniabudowy w zasoby wykonano badania ankietowe, a otrzymaneinformacje poddano analizie.
Zabłocie is one of the most dynamically developing districts of Kraków. The aim of this article is to present the role of the Innovation Cluster in the revitalization of Zabłocie. The article discusses the historical background of the Zabłocie district and examines how the Innovation Cluster can influence its revitalization process. The article also analyzes the possible challenges associated with the implementation of the Innovation Cluster. Key issues include the adaptation of old industrial buildings to new functions, the need for infrastructure investment, and the risk posed by insufficient cooperation between the public and private sectors. In the context of the implementation of the Zabłocie cluster, investment management has played an important role. By integrating BIM technology with a cloud-based collaboration environment, decision-making processes were streamlined at every stage of construction. The cluster has the potential to become a catalyst for the transformation of Zabłocie. It serves as an example of sustainable development, where technological innovation, creative industries, and social responsibility align with infrastructure improvement and enhancing the quality of life in the urban environment.
Realizacja robót budowlanych w obiektach, które nie mogą zostać wyłączone z użytkowania, wymaga nie tylko zaawansowanego podejścia organizacyjnego, ale również elastyczności, innowacyjności i skutecznego zarządzania ryzykiem, aby zachować równowagę między postępem prac budowlanych a zapewnieniem ciągłości i bezpieczeństwa funkcjonowania zakładu. Stanowi to wyzwanie obarczone dużym ryzykiem dla wykonawcy, ale jednocześnie pozwala na zdobycie ogromnego doświadczenia i kompetencji, dając tym samym przewagę na konkurencyjnym rynku usług budowlanych. Artykuł opisuje wyzwania i możliwości związane z realizacją inwestycji budowlanych oraz ryzyka i korzyści wynikające z integracji działań budowlanych z funkcjonowaniem zakładu pracy.