Anna Sobotka

Anna Sobotka

Auto-generated profile, based on publicly available information

Anna Sobotka

AGH University of Science and Technology

Research Focus & Metrics

Academic Career Length

29Years (1998-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 June 2018 in Automation in Construction
Verified
Journal Article
Closed access
PJPiotr Jaskowski
Piotr Jaskowski
ASAnna Sobotka
Anna Sobotka
ACAgata Czarnigowska
Agata Czarnigowska

31 March 2005 in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
Verified
Journal Article
Open access
PDF file
ASAnna Sobotka
Anna Sobotka
ACAgata Czarnigowska
Agata Czarnigowska
The paper discusses a number of construction project logistics problems, with focus on supply systems, and presents the results of recent survey of Polish contractors’ supply routines. On the basis of the survey, patterns of development of logistic systems have been described. The enclosed results of cost simulations indicate that outsourcing supply logistic processes, considering the current state of Polish construction market, may reduce costs. The paper emphasises that creating logistic guidelines of a project at its early stages of planning and then a design of integrated logistic service to the project may help find ways of making a construction project more effective.

1 August 2006 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
PJPiotr Jaskowski
Piotr Jaskowski
ASAnna Sobotka
Anna Sobotka
This paper attempts to use evolutionary algorithms to solve the problem of minimizing construction project duration in deterministic conditions, with in-time changeable and limited accessibility of renewable resources (workforce, machines, and equipment). Particular construction processes (with various levels of complexity) must be conducted in the established technological order and can be executed with different technological and organizational variants (different contractors, technologies, and ways of using resources). Such a description of realization conditions allows the method to also be applied to solving more complex problems that occur in construction practice (e.g., scheduling resources for a whole company, not only for a single project). The method’s versatility distinguishes it from other approaches presented in numerous publications. To assess the solutions generated by the evolutionary algorithm, the writers worked a heuristic algorithm (for the allocation of resources and the calculation of the shortest project duration). The results obtained by means of this methodology seem to be similar to outcomes of other comparable methodologies. The proposed methodology (the model and the computer system) may be of great significance to the construction industry. The paper contains some examples of the practical use of the evolutionary algorithm for project planning with time constraints.

10 July 2015 in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
Verified
Journal Article
Open access
RBRobert Bucoń
Robert Bucoń
ASAnna Sobotka
Anna Sobotka
During the use of buildings it becomes necessary to carry out repair works including modernisation. Deciding on the choice of repair solutions is a difficult and complex task. Building administrators have to consider both, the benefits of some repair works, and limitations due to the availability of funds. Selection of a repair solution, bearing in mind the above, requires a comprehensive approach that will allow assessment of the building condition and determining the repair scope required. The research conducted by the authors was aimed at developing a decision-making model and its computer-aided implementation, taking into account a number of operating demands. The system algorithm proposed comprises five stages including: building condition assessment, building use value evaluation, repair classification, multiple variants of repair and the choice of repair solutions. The article describes individual stages of the model in detail, giving numerical application examples of the method for repair solution choice for five multi-family houses.

1 January 2015 in Procedia Engineering
Verified
Journal Article
Open access
ASAnna Sobotka
Anna Sobotka
JCJoanna Czaja
Joanna Czaja
Waste minimization and recycling are principles of the concept of sustainable development that is now globally introduced. Construction in the sense of manufacturing goods and construction and exploitation of buildings generates a significant amount of waste. Therefore, the developing of the concept of waste management and the reverse logistics is implemented to the construction industry. A statement released by the European Commission on July 1, 2014, indicates, however, the presence of inefficient management of raw materials in construction. The primary purpose of initiatives published in the statement is to increase the efficiency of resource management by new and renovated buildings and also by the reduction of their overall impact on the environment that occurs in all phases of building life cycle. The main idea of the article is to define the concept of reverse logistics in relation to the construction industry and to analyze factors stimulating and conditioning the implementation of reverse logistics in construction projects, while giving the expected results. Physical flow of raw materials and products in the building life cycle has been analyzed. The article discusses the allocation of reverse logistics tasks among the participants of investment process, so that it has become an economically effective and profiting branch for construction companies along with a profitable environmental aspect. Problems that should be taken into consideration in order to manage the waste and raw material in construction in an effective way have also been indicated. As a conclusion, article shows an example of reverse logistics model, that may be the foundation for creating a decision making supporting system

1 December 2013 in Archives of Civil and Mechanical Engineering
Verified
Journal Article
Closed access
ACAgata Czarnigowska
Agata Czarnigowska
ASA. Sobotka
A. Sobotka