As Digital Twins gain more traction and their adoption in industry increases, there is a need to integrate such technology with machine learning features to enhance functionality and enable decision making tasks. This has lead to the emergence of a concept known as Digital Triplet; an enhancement of Digital Twin technology through the addition of an ’intelligent activity layer’. This is a relatively new technology in Industrie 4.0 and research efforts are geared towards exploring its applicability, development and testing of means for implementation and quick adoption. This paper presents the design and implementation of a Digital Triplet for a three-floor elevator system. It demonstrates the integration of a machine learning (ML) object detection model and the system Digital Twin. This was done to introduce an additional security feature that enabled the system to make a decision, based on objects detected and take preliminary security measures. The virtual model was designed in Siemens NX and programmed via Total Integrated Automation (TIA) portal software. The corresponding physical model was fabricated and controlled using a Programmable Logic Controller (PLC) S7 1200. A control program was developed to mimic the general operations of a typical elevator system used in a commercial building setting. Communication, between the physical and virtual models, was enabled using the OPC-Unified Architecture (OPC-UA) protocol. Object recognition using “You only look once” (YOLOV3) based machine learning algorithm was incorporated. The Digital Triplet’s functionality was tested, ensuring the virtual system duplicated actual operations of the physical counterpart through the use of sensor data. Performance testing was done to determine the impact of the ML module on the real-time functionality aspect of the system. Experiment results showed the object recognition contributed an average of s to an overall signal travel time of s.
Currently, Kenya supplies its energy demand predominantly through hydroelectric power, which fluctuates due to poor and unpredictable rainfall in particular years. Geothermal energy is proposed as a clean and reliable energy source in meeting Kenya’s increasing energy demand. During geothermal drilling operations, disruptions due to tool wear and breakages increases the cost of operation significantly. Some of these causes can be mitigated by real-time monitoring of the tool head during operations. This paper presents the design and implementation of a digital twin model of a drilling tool head, represented as a section of a mechatronic assembly system. The system was modelled in Siemens NX and programmed via the TIA portal using S7 1200 PLC. The digital model was programmed to exactly match the operations of the physical system using OPC (open platform communications) standards. These operations were verified through the motion study by simultaneous running of the assembly system and digital twin model. The study results substantiate that a digital twin model of a geothermal drilling operation can closely mimic the physical operation.
The cement production process is energy intensive both in terms of the thermal energy (firing the kiln, drying and De carbonation) and electrical energy for driving the numerous drives within the process line. The average specific power consumption of the case study plant was 111 kWh/ton of cement with an average peak demand of 9.7 MW. The high cost of electric power at 0.14 USD/kWh results in very high cost of production that significantly lowers the company's profit margin and limits its competitive advantage. The generation of electrical power from waste heat recovery would reduce the electricity power bill through partially substituting the power procured from the national grid. This research evaluated the potential that the plant has for generating electrical power from the hot waste gases vented into the atmosphere and it was found that the plant has the potential to generate 3.4 MWh of electrical power. This results to a net potential to generate 2.89 MWh of electrical power after factoring in the auxiliary power consumption by Waste heat recovery plant system at 15%. This ultimately gave a reduction of 33% in the electricity power bill of the case study plant. The paper recommends the installation of a steam rankine cycle for the power generating plant. In this work the authors designed the steam boilers for the waste heat recovery plant for conversion of thermal energy to electrical energy, selected a commercial steam turbine and evaluated its economic feasibility and established that the designed plant would have a simple payback period of 2.7 years.
18 April 2012 in The International Journal of Advanced Manufacturing Technology