Jinbo Song

Prof. Dr. Jinbo Song


Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
21 March 2016 in Scientometrics
Verified
Journal Article
Closed access
PDF file
JSJinbo Song
Jinbo Song
HZHonglian Zhang
Honglian Zhang
WDWanli Dong
Wanli Dong

1 February 2020 in Energy
Verified
Journal Article
Closed access
Pan XiongfengPan Xiongfeng
Pan Xiongfeng
SGShucen Guo
Shucen Guo
CHCuicui Han
Cuicui Han
MWMengyang Wang
Mengyang Wang
JSJinbo Song
Jinbo Song
XLXianchun Liao
Xianchun Liao

1 January 2019 in International Journal of Project Management
Verified
Journal Article
Closed access
HWHuanming Wang
Huanming Wang
YLYuhai Liu
Yuhai Liu
WXWei Xiong
Wei Xiong
JSJinbo Song
Jinbo Song

1 September 2016 in Journal of Management in Engineering
Verified
Journal Article
Closed access
OBOusseni Bagaya
Ousseni Bagaya
JSJinbo Song
Jinbo Song
A well-functioning construction industry is a prerequisite for the development process to take place. In this regard, the aim of this study is to identify the most frequent, severe, and important causes of schedule delays affecting public constructions projects in Burkina Faso to enhance the managerial capability of project managers. This research was conducted by questionnaire survey to solicit the causes of schedule delays from 140 Burkinabé experts (clients, contractors, and consultants). After analyzing their frequency, severity, and importance index using a quantitative statistical method, the top five most important delay factors were ranked as follows: financial capability of the contractor, financial difficulties of the owner, equipment availability of the contractor, slow payments for completed work, and poor subcontractor performance by the contractor. A comparison of the causes of schedule delays in 11 countries to validate the results of the study showed that financial capability of th...

1 January 2018 in Journal of Management in Engineering
Verified
Journal Article
Closed access
JSJinbo Song
Jinbo Song
Yibo HuYibo Hu
Yibo Hu
ZFZhuo Feng
Zhuo Feng
The public-private partnership (PPP) mode is increasingly being applied to implement infrastructure projects worldwide to alleviate the shortage of government funds and experience. However, many PPP projects encounter crises and are even terminated before the expiration of the PPP contract due to a variety of factors that differ from general risks. Based on 23 selected PPP projects in China, this paper uses a multicase study to identify and analyze factors that influence early termination. Eleven influencing factors are identified as the main causes of the early termination of PPP projects in China. Among them, government decision error and government payment default are the most common factors. Counterstrategies are proposed to mitigate the impact of these factors. The results are expected to serve as a reference and provide inspiration for the host governments and private sectors of PPP projects.

1 September 2021 in Technovation
Verified
Journal Article
Closed access
XPXiongfeng Pan
Xiongfeng Pan
SGShucen Guo
Shucen Guo
MLMengna Li
Mengna Li
JSJinbo Song
Jinbo Song