Simultaneous deployment of the electric vehicle charging stations (EVCSs) and distributed photovoltaic stations (DPVSs) in the distribution systems is an effective way to reduce greenhouse gas emissions, promote renewable power adoption, and achieve sustainable development in energy utilization. In this context, how to deploy the EVCSs and DPVSs in the distribution systems with a reasonable scheme is of great importance. In this article, a joint planning model is developed to optimize locations and capacities of the EVCSs and DPVSs simultaneously to reduce energy losses in the distribution systems. In the joint planning model, constraints on bus voltage deviations and line currents are both formulated as chance constraints to ensure that the distribution systems are in reasonable operating statues. To quantify these two chance constraints, a scenario-based method is developed to calculate the probabilistic power flow of the distribution systems during a typical planning day, in which random characters of the DPVS generations and the EVCS charging loads are both considered. The joint planning model of the EVCSs and DPVSs developed in this article is difficult to be solved by mathematical optimization methods. Therefore, genetic algorithm (GA) is customized and utilized to solve the joint planning model of the EVCSs and DPVSs. Finally, a case study based on IEEE 33-bus distribution systems validates the joint planning model and its solving algorithm.
In this paper, a finite-control-set model predictive virtual-flux control (FCS-MPVFC) for a three-phase Vienna rectifier is developed and implemented to achieve voltage sensorless control, which is very robust to distorted grid-side voltage operation. Firstly, by investigating the relationship between virtual-fluxes aroused from grid-side voltages and line voltages in d-q frame, the control object is directly associated with virtual-flux tracking error minimization. Secondly, the reference line virtual-flux is calculated based on the controllability of active/reactive power associated with the delay compensation and load angle. Thirdly, to enhance the steady-state performance, switching sequence rather than single switching vector is utilized during one sampling period. Furthermore, a redundant vector pre-selection is adopted to balance the neutral-point voltage. The proposed strategy is compared with the traditional finite-control-set model predictive current control (FCS-MPCC) method. Both simulated and experimental results verify the effectiveness of the proposed control algorithm.
30 July 2019 in IEEE Transactions on Power Systems
Phase swapping, which rebalances the unbalanced three-phase low voltage (LV, 415V) networks, improves network efficiency by reducing capacity waste and energy losses. A key challenge against phase swapping is that the majority of LV networks are data-scarce, i.e. there is a general lack of data in LV networks. In light of this, this paper proposes a new statistical approach to develop phase swapping guidance for data-scarce LV networks with neither time-series network measurements nor customer metering data. Firstly, given a set of data-rich LV networks (with time-series phase currents data collected at LV substations throughout a year), typical load profiles and their weights in each of the three phases are extracted by applying a non-negative matrix factorization method. Then, phase swapping guidance are developed for data-rich LV networks along with their rebalancing potentials (rebalancing potentials refer to the reduction of phase imbalance degree). Secondly, a rapid screening model is developed to identify the data-scarce LV networks with high rebalancing potentials. Phase swapping guidance are developed for these networks. Case studies reveal that the statistical approach produces effective phase swapping guidance, which reduce the phase imbalance degrees for 99% of the LV networks and the maximum reduction is 35%.
In this paper, battery energy storage systems (BESSs) are integrated into wind farms (WFs) to mitigate the wind power fluctuations. This paper presents a formulation to optimize the operation schedule of the BESS, with the objective of minimizing the energy of the fluctuating component extracted from the output power of the BESS-integrated WF. The optimal operation schedule of the BESS is utilized to generate the charging/discharging instructions for the BESS to enhance the performances on mitigating the wind power fluctuations. Without proper control, the BESS switches between the charging and discharging states frequently and, thus, degrading batteries significantly, which results in a high operation cost of the BESS. To address this issue, the BESS is divided into two parts, which implement charging and discharging instructions, respectively. Sequential Monte Carlo simulation is applied to simulate the operation of the BESS-integrated WF on a typical day and the simulation results are used to evaluate the technical and economic performances on mitigating the fluctuations. The simulation results validate that the solution can mitigate the output power fluctuations with better performance and a less operation cost than the existing solutions.
3 August 2021 in International Transactions on Electrical Energy Systems
The variations of wind generation result in the considerable fluctuations of the system frequency, which are difficult to be regulated in the acceptable range in electric power systems with highly penetrated wind generations. This paper suggests an enhanced frequency control scheme with dynamic droop coefficients of a doubly fed induction generator (DFIGs, type 3) that is able to mitigate the fluctuations of the system frequency with more efficiency. To this end, a supplementary control loop with system frequency-dependent droop control coefficients is employed based on the deviation of the system frequency. Simulation results clearly indicate that the suggested frequency control scheme is benefit to improving the frequency regulation capability under various wind speed patterns and penetration levels as energy storage systems do for frequency regulation, particular in highly wind generation penetrated power systems.