hamed hosseinnia

Dr. hamed hosseinnia


Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2019 in Electric Power Systems Research
Verified
Journal Article
Closed access
HHhamed hosseinnia
hamed hosseinnia
BTBehrouz Tousi
Behrouz Tousi

1 July 2018 in Sustainable Cities and Society
Verified
Journal Article
Closed access
HHhamed hosseinnia
hamed hosseinnia
DNDaryoush Nazarpour
Daryoush Nazarpour
VTVahid Talavat
Vahid Talavat

24 August 2018 in Journal of Ambient Intelligence and Humanized Computing
Verified
Journal Article
Closed access
PDF file
HHhamed hosseinnia
hamed hosseinnia
DNDaryoush Nazarpour
Daryoush Nazarpour
VTVahid Talavat
Vahid Talavat

15 October 2020 in IETE Journal of Research
Verified
Journal Article
Closed access
JMJavad Modarresi
Javad Modarresi
HHhamed hosseinnia
hamed hosseinnia
This paper aims to obtain the overall equations of the yearly, seasonal, monthly and daily optimum tilt angles worldwide. So, the daily optimum tilt angle variations are examined for 337 locations in the northern hemisphere and 247 locations in the southern hemisphere, and it is shown that the daily optimum tilt angle changes in cosine form over a year. Then, the daily optimum tilt angle is estimated using a cosine function. The daily optimum tilt angle is independent of the longitude and can be estimated using a function that depends on the latitude and the number of days. The resulting model can be used to calculate the optimum tilt angles in desired intervals. In order to verify the validity of the results, the results of the proposed model are compared with the results of the other papers. It is shown that the presented model can calculate the optimum tilt angles with acceptable accuracy in the southern and northern hemispheres.

30 August 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
HHhamed hosseinnia
hamed hosseinnia
Behnam Mohammadi-IvatlooBehnam Mohammadi-Ivatloo
Behnam Mohammadi-Ivatloo
MMMousa Mohammadpourfard
Mousa Mohammadpourfard
By installing distributed generation (DG) sources in a distribution system, there is a change from the inactive state, accompanied by one-way power flow, to the active state, with the possibility of bilateral power flow. Authorities involved in the electricity industry manage the consumption side by bringing in particular programs called demand response programs. To implement these programs, it is crucial to create infrastructure, including the installation of smart measuring units in the consumption sector. In this paper, we investigate the optimal design of smart meters and combined hydrogen, heat, and power in the active distribution system to provide two functions aimed at reducing voltage drop and minimizing the total planning costs by taking different scenarios into account. In the combined hydrogen, heat, and power (CHHP)-based DGs, due to the low efficiency of the electrolyzer, its power is supplied by a smart parking lot (including wind turbines, photovoltaic systems, and batteries). To model the unit’s uncertainties, a long short-time memory (LSTM) model is employed. Utilizing the technique for order preference by similarity to ideal solution (TOPSIS), a state that enhances both functions is acquired from different scenarios. All of the simulations are carried out in two 33-bus systems.

19 October 2018 in IET Generation, Transmission & Distribution
Verified
Journal Article
Open access
PDF file
HHhamed hosseinnia
hamed hosseinnia
DNDaryoush Nazarpour
Daryoush Nazarpour
VTVahid Talavat
Vahid Talavat
A huge motivation has recently made on microgrid (MG) financial issues, aimed to investigate the contribution of MG operator (MGO) and private investor to reach an optimal operational strategy. Motivating the private investors to contribute in an energy production, is a considering benefit sharing factor by MGO to satisfy both of MGO and private investor. In this study, a reliability‐constrained optimisation approach is presented to calculate the number and size of MG system components. To this aim, planning problem is solved in two cases; full available state and state with considering random outage of units. Furthermore, all uncertainties of generation units are considered in the problem formulation. Non‐sequential Monte Carlo method is used to generate all scenarios. The proposed model simultaneously optimises two objectives, namely the benefits of MGO. The two‐stage heuristic method is used to solve the objective function. In the first stage, by utilising genetic algorithm, the solution to form the Pareto optimal front is found. In the second stage, to select the trade‐off solution among obtained Pareto solutions, the fuzzy satisfying method has been used. Simulations are carried out in two cases, with and without considering the share of a private investor of MGO's benefit, i.e. β .