Sustainable electrification calls the need for more efficient protection schemes. Synchronous‐based distributed generations (SBDGs) are more susceptible to power grid faults owing to their low inertia time constants. Accordingly, fault elimination faster than the associated critical clearing time (CCT) is required to prevent unintentional disconnection of SBDGs, which inevitably makes the coordination of directional over‐current relays (DOCRs) complicated than before, especially in meshed structure distribution networks (DNs). This study proposes communication assisted dual‐setting DOCRs as effective solutions for providing fast‐response protection in order to meet transient stability constraints of SBDGs in meshed active DNs. Dual‐setting DOCRs are capable of operating in both forward and reverse directions with individual settings for each direction and thus providing flexibility in the coordination process. In this regard, time domain simulation as a reliable method is conducted to calculate CCTs. Afterwards, coupled with selectivity constraints associated with dual‐setting DOCRs, transient stability constraints are all together accommodated in the optimisation process. Moreover, dual‐setting DOCRs are allowed to follow user‐defined time‐inverse characteristics which help to alleviate clearing time of faults. The approach reveals a non‐linear programming model which is tackled by seeker algorithm. Detailed numerical studies are carried out to validate the performance of the proposed approach.
8 November 2018 in International Transactions on Electrical Energy Systems
Keeping selectivity among protective devices in electrical grids is of crucial importance. This task in the combinatorial protection scheme of distance and directional overcurrent relays (DOCRs) stands as a complicated problem, especially in interconnected networks. To overcome this issue, this paper proposes an enhanced protection coordination (PC) scheme by employing dual time‐current characteristics (D‐TCCs) for overcurrent relays which are followed by two inverse‐time curves in series. These characteristics simplify the complexity of the problem and yield higher flexibility and extensibility in PC process which helps to meet selectivity requirements. However, these characteristics can be implemented by numerical DOCRs which poses investment costs. Therefore, a techno‐economic optimal replacement model is devised to attain a least‐cost numerical DOCRs deployment plan while eliminating miscoordination and minimizing total operation time of the relays. Furthermore, inverse‐time curves of DOCRs are selected optimally among available options for conventional relays. By doing so, the attained flexibility is intensified which lessens imparted economic burden through alleviating the replacement level of numerical DOCRs. The proposed approach calls the need for making amendments in coordination points to handle coordination problem in the case where both conventional DOCRs and numerical DOCRs with D‐TCCs are present. Therefore, coupled with the conventional selectivity constraints, the constraint associated with new coordination points are all together accommodated in the optimization process. The proposed model demonstrates a mixed integer nonlinear programming fashion which is solved with sine‐cosine algorithm. Several numerical studies are carried out to interrogate the validity of the proposed approach. The obtained results are encouraging.
Soft open point (SOP) as a novel power electronics‐based device has been introduced to control active power flow, compensate reactive power, and regulate voltage for flexible operation of distribution networks. The increasing penetration of renewable energy sources (RESs) such as wind turbine (WT) and photovoltaic (PV) units with uncertain outputs in distribution networks increases the importance of optimal and robust allocation of SOP against multiple uncertainties to improve the performance of these networks. In this paper, a probabilistic multi‐objective framework is proposed for optimal allocation of SOP in RESs included distribution networks. A novel SOP modeling in the forward‐backward load flow method without any simplification is introduced. In addition, this study investigates the impact of various correlation levels between uncertain input variables in the problem. The multi‐objective particle swarm optimization (MOPSO) method is used to extract Pareto‐based solutions set considering the expected value of active power losses, feeder load balancing index (LBI), and investment cost of SOP as objective functions. Also, the Latin hypercube sampling (LHS) and Cholesky decomposition methods are implemented to uncertainties modeling and handling the correlations, respectively. The results of the proposed study framework are argued on the IEEE 33‐node and the IEEE 118‐node distribution networks.
2 July 2018 in International Journal of Ambient Energy
In this paper, the simultaneous placement of renewable distributed generation (DG) and protective devices are discussed in the distribution system with nonlinear load model. The load model is considered as a combination of various customers’ daily load patterns and sensitive to voltage frequency. The considered DGs are wind turbine and photovoltaic. The breaker, relay and fuse are considered as protective devices. The objective functions of the problem consist of the active and reactive power loss, the reliability index and the profit of company of distribution system. The whale optimisation algorithm is used for multi-objective optimisation. Moreover, a method based on fuzzy set theory is employed to extract one of the Pareto-optimal solutions as the best compromise one. The proposed algorithm is implemented on the 69-bus distribution system and actual 101-bus distribution system in Khoy–Iran. The results indicate the high performance of the proposed method in improving the technical and economic indices of the network.