This contribution provides the implementation of a holistic operational security assessment process for both steady-state security and dynamic stability. The merging of steady-state and dynamic security assessment as a sequential process is presented. A steady-state and dynamic modeling of a VSC-HVDC was performed including curative and stabilizing measures as remedial actions. The assessment process was validated by a case study on a modified version of the Nordic 32 system. Simulation results showed that measure selection based on purely steady-state contingency analysis can lead to loss of stability in time domain. A subsequent selection of measures on the basis of the dynamic security assessment was able to guarantee the operational security for the stationary N-1 scenario as well as the power system stability.
The electrical energy system is transforming itself into a sustainable energy supply in response to the decline in fossil fuels. This conversion is driving the expansion of renewable energy facilities such as photovoltaic plants and wind power plants. Except for large hydropower plants and offshore wind farms, the integration of renewable energies takes place predominantly in the medium- and low-voltage distribution networks. This leads to a lack of observability and increasing grid complexity. Consequently, distribution network operators are constantly faced with a challenge in terms of observability. A comprehensive installation of measuring instruments in the medium- and low-voltage networks has proved economically unviable. An alternative approach to network state monitoring within the framework of power grid digital twin (DT) is therefore developed in this paper. The patterns of the electrical energy system are detected and modeled employing an artificial neural network (ANN) in connection with the associated harmonic spectra. Based on this DT model, the active powers of renewable energy facilities are estimated through the measured voltage data. In this regard, this work is first devoted to the modeling of an ANN-based DT estimator. The proposed power state estimation is then validated with the measured data from a field test. The accuracy of the estimation will be investigated according to the different influencing factors.
One solution to compensate for fluctuations in renewable energy sources is the use of power-to-gas (PtG) systems. These convert excess energy from the power grid into synthetic gases that can either be stored or used directly in other energy sectors. The PtG system, therefore, represents an interface between the electrical energy and gas sectors and enables energy transfer between the two. Furthermore, seasonal load fluctuations in the power grid are compensated, e.g. excess solar energy from the summer months can be stored in the form of gas and converted back into electricity in winter if necessary. As part of the work, we develop a simulation model for the modelling of PtG systems in the electrical energy system. This initially requires extensive literature research to characterize the various modules of PtG systems. These include the electrolysis of water, the methanation of hydrogen, the modelling of gas storage and the regeneration of synthetic gases via fuel cells or gas power plants. The model is intended to provide essential insights into the dynamic behavior of PtG systems to determine their suitability for the provision of secondary control power. Furthermore, the model is to be used to create a basis for an economic evaluation of various implementation options for PtG plants.
This paper deals with the possibility of coupling distribution networks by using point-to-point DC links. The advantages of this approach are due to the improved integration of RES in distribution networks through a direct compensation of Generation and load in the same voltage level. A method was proposed which allows a direct transport of the excess power from one distribution network to another distribution network with transit through an intermediate distribution network with a simple coordination effort. The method is only dependent on power flow measurements in the own distribution network and therefore does not require an additional coordinating instance. The DC links could thus work autonomously as far as possible. In a case study it could be shown that the approach has advantages with regard to system losses as well as relief of the coupling points to the overlayed transmission network in comparison to the previous power extension in AC transmission lines. However, the case study also showed that the method had to be further improved regarding network security.
Today's electrical power system is subjected to changes and improvements. In distribution grids, the number of converters, which connect the energy devices to the grid, is dramatically increased. The objective of this paper is to analyze the destabilization effect on system stability with increasing number of converter. Coinstantaneous this paper also developed a feasible solution by an enhancement of the converter control structure and an operation point dependent stabilizing factor. The results are demonstrated with Cigré benchmark grid in effective value time domain.
The development of modern LV distribution networks is characterized by the growth in the number of converter-interfaced prosumers using electronic elements with switching frequencies in the kHz range. It causes the emission of so-called “supraharmonics” into electrical networks. For the analysis of the propagation of supraharmonics it is necessary to known the corresponding frequency-dependent parameters of LV distribution lines. Modern LV distribution lines are mainly cable lines and designed for the operation at the fundamental frequency (e.g. 50 Hz). The calculation of line impedances at all other frequencies is the subject of special studies. The paper deals with the analysis of positive sequence series impedances of LV sector-shaped cables in the frequency range 2 to 9 kHz. The analysis is based on FEM simulation results. Novel formulas are suggested for the simplified determination of series resistances and inductances of LV 4-core cables with sector-shaped aluminium conductors.