The irregular forbidden zone (FZ) is a common phenomenon with giant hydropower plants developed in the past two decades in China. Irregular shapes of FZs significantly challenge hydro unit commitment (HUC). This paper proposes a novel MILP based framework for HUC considering irregular FZ related constraints including the FZ constraint, effects of linearization errors in both the net head and the output, and the FZ crossing constraint. In the framework, the FZ constraint is handled by the optimal convex partitioning algorithm and the common structure-based formulation method. Inspired by the planar translating robot placement problem, linearization errors are considered by the Minkowski sum method. To handle the FZ crossing constraint, we then propose a graph theory-based approximate formulation method. The framework is integrated into a HUC model with an objective of peak shaving. The model is then tested with a batch of real-world instances of a cascade hydropower system formed by ten giant units with highly irregular FZs. The results show our framework can effectively consider the irregular FZ related constraints. The major advantage of our framework is its ability to handle the irregular shapes of FZs without any tedious and error-prone manual processing.
China is implementing a new power system reform, with one goal of renewable energy absorption such as hydropower. However, the forthcoming spot market challenges cascade hydropower generation in terms of the short-term hydro scheduling (STHS) problem. Specifically, STHS involves fulfilling bilateral market obligations and bidding for the day-ahead market with uncertainty. Coordination of these two tasks while managing market risks becomes a problem that must be urgently solved. Herein, we propose a method based on the information-gap decision theory (IGDT) to solve the cascade hydropower STHS problem, wherein the aforementioned tasks are coordinated simultaneously. The IGDT method was used to deal with the uncertainty of the day-ahead market price, and the robustness function was derived. A mixed-integer nonlinear programming model was used to describe the proposed problem, and a commercial solver was used to solve it. A four-reservoir cascade hydropower company was used as the research object. Through the robust dispatching results, the preset profit objectives of the power generation company were satisfied within the price information gap, and the day-ahead market bidding strategy and daily contract decomposition curve were obtained. The proposed model is found to be superior to the scenario-based probability method. Moreover, a comparative analysis of bilateral contract fulfillment showed that more profits can be obtained by coordinating contract fulfillment in the day-ahead market.
Uncertainties from neighboring rival’s reservoirs challenge hydropower companies in participating in competitive markets. Cooperative behaviors are generally impractical due to stakeholders’ self-interest and regulatory requirements. Considering this obstacle, this paper proposes a data-driven bilevel model, in a competitive context, to estimate the operational information of the neighboring rival’s reservoir, including its historical operating states and operational functions. The proposed bilevel model is an inverse problem of the conventional hydropower scheduling model. The upper-level model is designed to find the most appropriate operational parameters of the estimated reservoir that fit its historical generation volumes. The lower-level model simulates the profit-maxing operation of the estimated reservoir. Since the lower simulating model is nonconvex, an Enhanced Parallel Genetic Algorithm (EPGA) is proposed. It avoids infeasible situations through several strategies and uses multiple CPU threads simultaneously in solving. A case study in China’s market demonstrates that the proposed model and solving method can efficiently obtain accurate state series and (near-)optimal operational parameters. More experiments are also taken to validate the parallel design.
Integrated hydro–wind–solar power generators (IPGs) in China face multi-timescale bidding challenges across provincial forward–spot markets, which are further compounded by hydropower nonconvexity and transmission constraints. This study proposes a stochastic optimization model addressing uncertainties from wind–solar generation and spot prices through scenario-based programming, integrating three innovations: average-day dimensionality reduction to harmonize monthly–hourly decisions, local generation function approximation to linearize hydropower operations, and transmission-aware coordination for cross-provincial allocation. Validation on a southwestern China cascade hydropower base transmitting power to eastern load centers shows that the model establishes hydropower-mediated complementarity with daily “solar–daytime, wind–nighttime” and seasonal “wind–winter, solar–summer” patterns. Furthermore, by optimizing cross-provincial power allocation, strategic spot market participation yields 46.4% revenue from 30% generation volume. Additionally, two transmission capacity thresholds are found to guide grid planning: 43.75% capacity marks the economic optimization inflection point, while 75% represents technical saturation. This framework ensures robustness and computational tractability while enabling IPGs to optimize profits and stability in multi-market environments.