Uncertainties from neighboring rival’s reservoirs challenge hydropower companies in participating in competitive markets. Cooperative behaviors are generally impractical due to stakeholders’ self-interest and regulatory requirements. Considering this obstacle, this paper proposes a data-driven bilevel model, in a competitive context, to estimate the operational information of the neighboring rival’s reservoir, including its historical operating states and operational functions. The proposed bilevel model is an inverse problem of the conventional hydropower scheduling model. The upper-level model is designed to find the most appropriate operational parameters of the estimated reservoir that fit its historical generation volumes. The lower-level model simulates the profit-maxing operation of the estimated reservoir. Since the lower simulating model is nonconvex, an Enhanced Parallel Genetic Algorithm (EPGA) is proposed. It avoids infeasible situations through several strategies and uses multiple CPU threads simultaneously in solving. A case study in China’s market demonstrates that the proposed model and solving method can efficiently obtain accurate state series and (near-)optimal operational parameters. More experiments are also taken to validate the parallel design.
Integrated hydro–wind–solar power generators (IPGs) in China face multi-timescale bidding challenges across provincial forward–spot markets, which are further compounded by hydropower nonconvexity and transmission constraints. This study proposes a stochastic optimization model addressing uncertainties from wind–solar generation and spot prices through scenario-based programming, integrating three innovations: average-day dimensionality reduction to harmonize monthly–hourly decisions, local generation function approximation to linearize hydropower operations, and transmission-aware coordination for cross-provincial allocation. Validation on a southwestern China cascade hydropower base transmitting power to eastern load centers shows that the model establishes hydropower-mediated complementarity with daily “solar–daytime, wind–nighttime” and seasonal “wind–winter, solar–summer” patterns. Furthermore, by optimizing cross-provincial power allocation, strategic spot market participation yields 46.4% revenue from 30% generation volume. Additionally, two transmission capacity thresholds are found to guide grid planning: 43.75% capacity marks the economic optimization inflection point, while 75% represents technical saturation. This framework ensures robustness and computational tractability while enabling IPGs to optimize profits and stability in multi-market environments.
This paper addresses the multi-source uncertainties faced by horizontal pumped storage-wind-solar (HWS) hybrid systems in the day-ahead market by proposing a hybrid stochastic-robust optimization model for bidding and scheduling. The model employs a scenario-based method to capture the randomness of wind and solar power output, utilizes Information Gap Decision Theory (IGDT) to handle the epistemic uncertainty in runoff inflow forecasting, and constructs a price-acceptance probability function based on historical statistics to characterize the market mechanism. By maximizing the system’s tolerable uncertainty immunity gap, the model co-optimizes generation schedules, pumped-storage operation, and market bids while ensuring that revenue under the worst-case inflow scenario does not fall below a predefined threshold. Simulation results based on an actual project in Hubei Province demonstrate that the proposed method effectively balances revenue and risk, showing significant advantages in both revenue stability and robustness compared to the system before retrofitting. This study provides practical decision-making support for hybrid systems with horizontal pumped storage participating in electricity markets.