Deida Bassorizzi

Ms. Deida Bassorizzi

Politecnico di Milano, Milan, Lombardy, Italy
orcid

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
31 July 2025 in Digital
Verified
Journal Article
Open access
PDF file
CBCecilia Maria Bolognesi
Cecilia Maria Bolognesi
DBDeida Bassorizzi
Deida Bassorizzi
SBsimone balin
simone balin
VMVasili Manfredi
Vasili Manfredi
The integration of Life Cycle Assessment (LCA) into Building Information Modeling (BIM) processes is becoming increasingly important for enhancing the environmental performance of construction projects. This scoping review examines how LCA methods and environmental data are currently integrated into BIM workflows, focusing on automation, data standardization, and visualization strategies. We selected 43 peer-reviewed studies (January 2010–May 2025) via structured searches in five major academic databases. The review identifies five main types of BIM–LCA integration workflows; the most common approach involves exporting quantity data from BIM models to external LCA tools. More recent studies explore the use of artificial intelligence for improving automation and accuracy in data mapping between BIM objects and LCA databases. Key challenges include inconsistent levels of data granularity, a lack of harmonized EPD formats, and limited interoperability between BIM and LCA software environments. Visualization methods such as color-coded 3D models are used to support early-stage decision-making, although uncertainty representation remains limited. To address these issues, future research should focus on standardizing EPD data structures, enriching BIM objects with validated environmental information, and developing explainable AI solutions for automated classification and matching. These advancements would improve the reliability and usability of LCA in BIM-based design, contributing to more informed decisions in sustainable construction.

29 July 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
CBCecilia Maria Bolognesi
Cecilia Maria Bolognesi
DSDaniele Sorrenti
Daniele Sorrenti
DBDeida Bassorizzi
Deida Bassorizzi
Due to the astonishing speed in technological progress for new heterogeneous experiences, the Mixed Reality continuum represents nowadays an invaluable tool for cultural heritage applications, and the possibility of seemingly natural interaction with virtual elements is paving the way for more immerse, ve and deeply enjoyable experiences, both in dedicated spaces, such as museums and exhibitions, and in public spaces via the latest mobile AR technologies. This paper illustrates the complete workflow followed for the design and implementation of an Augmented Reality application on a holographic table, along with critical latency-quality tradeoffs encountered when combining both high-fidelity surveys and latency-sensibility devices and experiences. A workaround is provided in order to mitigate the impact of low-importance models on the overall latency utilizing a software toolchain employing Google Maps/Earth web applications; each software comprises the toolchain Free and Open-Source Software (FOSS) for a more adaptive workaround with a wider range of suitable applications. The application is then tested with the students of LaborA, which is the modeling laboratory of “Politecnico di Milano”.

24 June 2023 in The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences
Verified
Journal Article
Open access
PDF file
CBCecilia Maria Bolognesi
Cecilia Maria Bolognesi
DBDeida Bassorizzi
Deida Bassorizzi
The contemporary process that leads digital surveying of Cultural Heritage to the creation of informed models in a BIM environment follows paths that are now codified for most; however, processes to improve the workflows both in terms of accuracy of results and speed of process still arise. The main cause lies in the lack of interoperability between modelling software NURBS oriented if related to parametric BIM-oriented software. The possibilities of interfacing one with the other have grown exponentially. On one side BIM oriented software look for more accuracy in defining shape objects even if complex or irregular; on the other NURBS modellers look for solving lack of information, necessary for any informed model. Our research question grows in this area and concerns three ways of reconstructing a Neo-Gothic tower to be imported into a parametric modeler for its BIM definition from an accurate point cloud. Workflows are compared to define accuracy, information addable, speed of creation.

9 October 2026 in Buildings
Verified
Journal Article
Open access
PDF file
DBDeida Bassorizzi
Deida Bassorizzi
SMSebastiano Maltese
Sebastiano Maltese
CBCecilia Maria Bolognesi
Cecilia Maria Bolognesi
GBGiovanni Branca
Giovanni Branca
LHLeidy Guante Henriquez
Leidy Guante Henriquez
The integration of Environmental Product Declarations (EPDs) as structured data within Building Information Modelling (BIM) workflows for Life-Cycle Assessment (LCA) and design and maintenance decision-making remains constrained. Key barriers include data heterogeneity among EPD programme operators and persistent interoperability gaps between BIM environments and dedicated LCA tools. Consequently, environmental evidence is often disconnected from the decision-making workflow. This study proposes a BIM-integrated framework for evaluating maintenance and replacement strategies for building components against environmental and economic criteria. EPD data retrieved from ECO Platform and ÖKOBAUDAT are normalised to canonical reference units, mapped onto a Data Template compliant with ISO 22057:2022, and written automatically into the information model as explicit, traceable parameters. Operational demand is obtained through dynamic energy simulation. The results are represented through cumulative impact trajectories and element-level colour coding. Six maintenance and retrofit scenarios for the building envelope were compared over a 60-year period for an existing office building in Lugano, Switzerland. The global retrofit achieves the greatest reduction in total life-cycle carbon 26.7%, while the combination of external wall insulation and window replacement reaches 18.7%. External wall insulation alone provides the most favourable balance between carbon savings and cost, with a 16.6% reduction and a 6-year carbon payback.