Nikita - Ganyukov

Mr. Nikita - Ganyukov

orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 June 2025 in Materials
Verified
Journal Article
Open access
PDF file
DADenis Akhmatnurov
Denis Akhmatnurov
NZNail Zamaliyev
Nail Zamaliyev
РМРавиль Мусин
Равиль Мусин
VDVladimir Demin
Vladimir Demin
NGNikita - Ganyukov
Nikita - Ganyukov
JSJERZY STASICA
JERZY STASICA
In the Karaganda coal basin, deteriorating geomechanical conditions have been observed, including seam disturbances, diminished strength of argillite–aleurolite strata, water ingress, and pronounced floor heave, all of which markedly increase the labor intensity of maintaining developmental headings. The maintenance and operation of these entries for a reference coal yield of 1000 t necessitate 72–75 man-shifts, of which 90–95% are expended on mitigating ground pressure effects and restoring support integrity. Conventional heave control measures—such as relief drifts, slotting, drainage, secondary blasting, and the application of concrete or rock–bolt systems—deliver either transient efficacy or incur prohibitive labor and material expenditures while lacking unified methodologies for predictive forecasting and support parameter design. This study therefore advocates for an integrated framework that synergizes geomechanical characterization, deformation prognosis, and the tailored selection of reinforcement schemes (incorporating both sidewall and floor-anchoring systems with directed preloading), calibrated to seam depth, geometry, and lithological properties. Employing deformation state assessments to optimize reinforcement layouts for floor stabilization in coal mine workings is projected to curtail repair volumes by 30–40% whilst significantly enhancing operational safety, efficiency, and the punctuality of face preparation.

28 July 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
RNRinat Nizametdinov
Rinat Nizametdinov
RNRinat Nizametdinov
Rinat Nizametdinov
DADenis Akhmatnurov
Denis Akhmatnurov
NZNail Zamaliyev
Nail Zamaliyev
РМРавиль Мусин
Равиль Мусин
ZRZbigniew Rak
Zbigniew Rak
The development of mining operations in high-altitude regions is associated with a number of geomechanical challenges caused by increased rock fracturing, adverse climatic conditions, and high seismic activity. These issues are particularly relevant for the exploitation of gold ore deposits, where the stability of open-pit slopes directly affects both safety and extraction efficiency. The aim of this study is to develop and practically substantiate a comprehensive approach to assessing and ensuring slope stability, using the Bozymchak gold ore deposit—located in a high-altitude and seismically active zone—as a case study. The research involves the laboratory testing of rock samples obtained from engineering–geological boreholes, field shear tests on rock prisms, laser scanning of pit slopes, and digital geomechanical modeling. The developed calculation schemes take into account the structural features of the rock mass, geological conditions, and the design contours of the pit. In addition, special bench excavation technologies with pre-shear slotting and automated GeoMoS monitoring are implemented for real-time slope condition tracking. The results of the study make it possible to reliably determine the strength characteristics of the rocks under natural conditions, identify critical zones of potential collapse, and develop recommendations for optimizing slope parameters and mining technologies. The implemented approach ensures the required level of safety.

7 November 2025 in Mining
Verified
Journal Article
Open access
PDF file
DADenis Akhmatnurov
Denis Akhmatnurov
NZNail Zamaliyev
Nail Zamaliyev
РМРавиль Мусин
Равиль Мусин
VDVladimir Demin
Vladimir Demin
BTBaurzhan Tolovkhan
Baurzhan Tolovkhan
ZRZbigniew Rak
Zbigniew Rak
The development of a geomechanical model is aimed at enhancing the safety of mining operations through the determination of optimal slope angles and the probabilistic assessment of pit wall stability. For the conditions of open-pit mining, three-dimensional geomechanical models were constructed based on the calculation of the slope stability factor using the Rocscience Slide2/Slide3 (v.9.027, 2023) software package. The stress–strain state of the rock mass at the final stage of extraction was evaluated using the finite element method. Strength reduction factors (SRF) were determined considering the physico-mechanical properties of the rocks forming the near-contour zone of the massif. The stability of the pit slopes was assessed along individual geological cross-sections in accordance with the design contours of the Northern Katpar open pit. Calculations performed using several methods confirmed the overall stability of the pit walls. The final design parameters of the projected open pit were determined. For the first time, it was established that in the southern and southwestern sectors of the Northern Katpar pit, within the elevation range of +700 to +400 m, a reduction in the SFR (from 1.18 to 1.41) occurs due to the predominance of siltstones and the presence of tectonic disturbances. The generalized results of numerical slope stability analyses for the design pit contour, together with the developed geological–structural model of the deposit, provide a basis for ensuring the safe conduct of mining operations at the site.

10 May 2025 in Mining informational and analytical bulletin
Verified
Journal Article
Closed access
ASA. V. Sadchikov
A. V. Sadchikov
NZNail Zamaliyev
Nail Zamaliyev
DADenis Akhmatnurov
Denis Akhmatnurov
РМРавиль Мусин
Равиль Мусин
NGNikita - Ganyukov
Nikita - Ganyukov

8 September 2025 in Ugol'
Verified
Journal Article
Closed access
NZN.M. Zamaliev
N.M. Zamaliev
RMR.A. Musin
R.A. Musin
DADenis Akhmatnurov
Denis Akhmatnurov
MRM. Rabatuly
M. Rabatuly
NGNikita - Ganyukov
Nikita - Ganyukov
???????????????? ?????????? ?????? ?? ???????? ??????? ???????????? ????? ????????, ???????????? ?? ???????? ???????? ?????????? ????? ? ????????? ???????????? ?????? ?????, ???????? ???????? ???? ? ?????????? ????????? ?????????. ?????, ???????????? ? ???????? ???????, ???????? ?????? ?????????? ?????, ? ??? ???????? ???????? ? ??????????? ??????????? ????, ??????????????? ??????????? ??????????. ?????????? ?????? ?? ?????? ?????????? ???????????? ???????? ???????? ? ?????????? ????? ??????? ? ??????. ?????? ???? ??????? ????? ??????? ?? ????? ????????????? ????????, ????? ??? ??????????? ????????? ??? ? ????????? ?????????, ? ?????? ?? ????????? ????? ???????? ? ??????? ? ????????????? ?????? ??? ?????????? ?????. ??????? ??? ?????????? ????????? ?????????? ?????? ?????????? ????????? ????????? ?????? ????? ?????????????? ???????? ? ?????????????? ?????????????? ???????, ??? ???????? ?????????????? ??????????? ??? ????????? ? ?????????? ??????????? ?????????? ?????????? ?????????.

15 September 2025 in Resources
Verified
Journal Article
Open access
PDF file
YTYelena Tseshkovskaya
Yelena Tseshkovskaya
NTNatalya Tsoy
Natalya Tsoy
TVTseshkovskiy Vadim
Tseshkovskiy Vadim
MIMARAT IBRAYEV
MARAT IBRAYEV
NZNail Zamaliyev
Nail Zamaliyev
ZRZbigniew Rak
Zbigniew Rak
This article is devoted to the crucial actual problem of the restoration of lands disturbed by the mining industry. It has been determined that before the reclamation of disturbed lands, it is essential to conduct an environmental impact assessment. The main objective of the research is to find and study the most optimal methods for reducing the technogenic impact of the mining industry on the environment by restoring disturbed areas. The object of the study was a mining enterprise in the Karaganda region. The Karaganda region was chosen for the study due to being the one with the most mining industry. After the extraction of mineral resources, the territories of the region became the most vulnerable and required the clearest solution for land restoration, taking into account the physical and geographical conditions. The work includes a statistical analysis of historical data on the state of disturbed territories of the Karaganda region, and laboratory and field studies. The comprehensive study revealed a clear need to restore disturbed lands. This will prevent further degradation of land resources and will make it possible to use them for new agricultural purposes. For the first time, studies were conducted for various soils, including technogenic soils, typical for areas where mining enterprises are located. For the first time, a reclamation algorithm has been developed for a mining enterprise in the Karaganda region, taking into account engineering and geological surveys.