JERZY STASICA

Dr. JERZY STASICA

orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 June 2022 in Energies
Verified
Journal Article
Open access
PDF file
PMPiotr Małkowski
Piotr Małkowski
ŁOŁukasz Ostrowski
Łukasz Ostrowski
JSJERZY STASICA
JERZY STASICA
Floor heaving is a phenomenon that occurs in almost all mining roadways and tunnels. It can restrain the advance of the heading face or cause serious problems during roadway use. The highest levels of floor uplifting are observed in coal mines, which can reduce the output or even stop it altogether. The floor heaving intensity depends on the rock type, the stress in the rock mass, and rocks’ mechanical properties. Floor deformation develops when the secondary state of stress is formed around the working, and it is much higher and more dynamic in the case of waterlogged rocks. The presence of water increases the floor’s propensity to heave, especially clay rocks, such as claystones or mudstones, if they include water-absorbed minerals. In this paper, we present a new modeling methodology for roadway floor heave. The modeling covers a dry floor condition in which the parameters of the Hoek-Brown failure criterion are gradually lowered over time, and a waterlogged floor condition, in which the strength and strain parameters of the rocks are gradually reduced in line with their progressive saturation. In the second case, the claystone floor’s geomechanical parameters were investigated, and the rocks were subjected to water for up to 24 h. The results of the numerical simulation were compared with the in situ measurements of convergence and floor heave in the same coal mines from which the rock samples were collected. The consistency between the numerical simulations and the underground measurements reached 90–99%.

24 November 2020 in Resources
Verified
Journal Article
Open access
PDF file
ZRZbigniew Rak
Zbigniew Rak
JSJERZY STASICA
JERZY STASICA
ZBZbigniew Burtan
Zbigniew Burtan
DCDariusz Chlebowski
Dariusz Chlebowski
This paper presents our experience obtained when mining the thick and steeply-inclined Seam 510 in the Polish Kazimierz-Juliusz coal mine with the use of a unique mechanical face mining system. Seam 510, which is 15–20 m thick and inclined at angles of 40°–45°, was initially treated as uneconomical because effective mining systems were not available. However, to extract high-quality coal resources, a completely mechanized variant of the sublevel caving system was designed based on standard machines and equipment applied in coal mining. Extraction was conducted top-down at the levels of the particular mining sub-level drifts with roof caving. The faces in the extracted coal release areas were protected by a single pair of specially designed mechanized mining system sections. One of the basic problems revealed during extraction of subsequent mining panels, was the observed changeability of the resource mining rates. The extraction losses changed in the available resources from less than 10% to about 50%. This paper presents two typical courses of changes in the extractable resource mining rates. Similar rate changes occurred in both cases with continued mining of a single seam section. Our analysis enabled deposit loss estimations and production output planning under the sublevel caving systems applied in the extraction of seam deposits of similar structure.

30 June 2025 in Materials
Verified
Journal Article
Open access
PDF file
DADenis Akhmatnurov
Denis Akhmatnurov
NZNail Zamaliyev
Nail Zamaliyev
РМРавиль Мусин
Равиль Мусин
VDVladimir Demin
Vladimir Demin
NGNikita - Ganyukov
Nikita - Ganyukov
JSJERZY STASICA
JERZY STASICA
In the Karaganda coal basin, deteriorating geomechanical conditions have been observed, including seam disturbances, diminished strength of argillite–aleurolite strata, water ingress, and pronounced floor heave, all of which markedly increase the labor intensity of maintaining developmental headings. The maintenance and operation of these entries for a reference coal yield of 1000 t necessitate 72–75 man-shifts, of which 90–95% are expended on mitigating ground pressure effects and restoring support integrity. Conventional heave control measures—such as relief drifts, slotting, drainage, secondary blasting, and the application of concrete or rock–bolt systems—deliver either transient efficacy or incur prohibitive labor and material expenditures while lacking unified methodologies for predictive forecasting and support parameter design. This study therefore advocates for an integrated framework that synergizes geomechanical characterization, deformation prognosis, and the tailored selection of reinforcement schemes (incorporating both sidewall and floor-anchoring systems with directed preloading), calibrated to seam depth, geometry, and lithological properties. Employing deformation state assessments to optimize reinforcement layouts for floor stabilization in coal mine workings is projected to curtail repair volumes by 30–40% whilst significantly enhancing operational safety, efficiency, and the punctuality of face preparation.

25 August 2022 in Energies
Verified
Journal Article
Open access
PDF file
ŁBŁukasz Bołoz
Łukasz Bołoz
ZRZbigniew Rak
Zbigniew Rak
JSJERZY STASICA
JERZY STASICA
Mechanised plow and shearer systems are widely applied in underground mines all over the world. Both systems are used in the exploitation of hard coal deposited in the form of seams of various thickness. The selection of the appropriate complex depends on the mining and geological conditions and the thickness of the seam. However, with regard to thin and medium seams, these complexes are competitive solutions. Mines usually use either shearer or plow systems. Both have certain advantages and disadvantages resulting from their design and method of operation, which have been demonstrated and presented in many publications. However, in terms of their failure rate comparison, there are no relevant research and analysis results. Only selective studies of individual machines can be found. The article is concerned with the failure frequency of longwalls equipped with plow and shearer systems in the LW Bogdanka coal mine. The analysis covers a period of 13 months of the mine’s operation, during which 2589 failures were recorded. All failures were taken into account, irrespective of their type or cause. The analysis was conducted for all longwalls exploited in this period, i.e., five plow and five shearer systems working in six different sections. In the analysed period, these longwalls worked for a total of 1484 days. It should be emphasised that all the complexes worked in one mine, thanks to which the data are comparable. The analysis is unique material regarding the failure rate of machines. Both solutions were analysed independently and subjected to a detailed comparison. A comprehensive analysis revealed that the failure rate of longwalls equipped with plow systems is noticeably higher than that of shearer ones. The main purpose of the article was to conduct a comparative analysis of the failure rate of machines in shearer and plow complexes operating in the same conditions. The analysis results contradict the previous opinion on the failure frequency of plow and shearer systems. The final conclusion has been very well-argued and is supported by hard data. The comparison of both techniques in terms of their failure rate is new knowledge and can be treated as an argument when choosing an appropriate longwall complex.

28 July 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
RNRinat Nizametdinov
Rinat Nizametdinov
RNRinat Nizametdinov
Rinat Nizametdinov
DADenis Akhmatnurov
Denis Akhmatnurov
NZNail Zamaliyev
Nail Zamaliyev
РМРавиль Мусин
Равиль Мусин
ZRZbigniew Rak
Zbigniew Rak
The development of mining operations in high-altitude regions is associated with a number of geomechanical challenges caused by increased rock fracturing, adverse climatic conditions, and high seismic activity. These issues are particularly relevant for the exploitation of gold ore deposits, where the stability of open-pit slopes directly affects both safety and extraction efficiency. The aim of this study is to develop and practically substantiate a comprehensive approach to assessing and ensuring slope stability, using the Bozymchak gold ore deposit—located in a high-altitude and seismically active zone—as a case study. The research involves the laboratory testing of rock samples obtained from engineering–geological boreholes, field shear tests on rock prisms, laser scanning of pit slopes, and digital geomechanical modeling. The developed calculation schemes take into account the structural features of the rock mass, geological conditions, and the design contours of the pit. In addition, special bench excavation technologies with pre-shear slotting and automated GeoMoS monitoring are implemented for real-time slope condition tracking. The results of the study make it possible to reliably determine the strength characteristics of the rocks under natural conditions, identify critical zones of potential collapse, and develop recommendations for optimizing slope parameters and mining technologies. The implemented approach ensures the required level of safety.

7 November 2025 in Mining
Verified
Journal Article
Open access
PDF file
DADenis Akhmatnurov
Denis Akhmatnurov
NZNail Zamaliyev
Nail Zamaliyev
РМРавиль Мусин
Равиль Мусин
VDVladimir Demin
Vladimir Demin
BTBaurzhan Tolovkhan
Baurzhan Tolovkhan
ZRZbigniew Rak
Zbigniew Rak
The development of a geomechanical model is aimed at enhancing the safety of mining operations through the determination of optimal slope angles and the probabilistic assessment of pit wall stability. For the conditions of open-pit mining, three-dimensional geomechanical models were constructed based on the calculation of the slope stability factor using the Rocscience Slide2/Slide3 (v.9.027, 2023) software package. The stress–strain state of the rock mass at the final stage of extraction was evaluated using the finite element method. Strength reduction factors (SRF) were determined considering the physico-mechanical properties of the rocks forming the near-contour zone of the massif. The stability of the pit slopes was assessed along individual geological cross-sections in accordance with the design contours of the Northern Katpar open pit. Calculations performed using several methods confirmed the overall stability of the pit walls. The final design parameters of the projected open pit were determined. For the first time, it was established that in the southern and southwestern sectors of the Northern Katpar pit, within the elevation range of +700 to +400 m, a reduction in the SFR (from 1.18 to 1.41) occurs due to the predominance of siltstones and the presence of tectonic disturbances. The generalized results of numerical slope stability analyses for the design pit contour, together with the developed geological–structural model of the deposit, provide a basis for ensuring the safe conduct of mining operations at the site.