SARAF (Soreq Applied Research Accelerator Facility) is based on a 5 mA, 40 MeV, proton/deuteron accelerator. Phase-I, operational since 2010, provides proton and deuteron beams up to 4 and 5 MeV, respectively, for basic and applied research activities. The high power Liquid-Lithium jet Target (LiLiT), with 1.912 MeV proton beam, provides high flux quasi-Maxwellian neutrons at kT ~30 keV (about 2 × 1010 n/s/cm2/mA on the irradiated sample, about 1 cm from the target), enabling studies of s-process reactions relevant to nucleo-synthesis of the heavy elements in giant AGB stars. With higher energy proton beams and with deuterons, LiLiT can provide higher fluxes of high energy neutrons up to 20 MeV. The experimental program with SARAF phase-I will be enhanced shortly with a new target room complex which is under construction. Finally, SARAF phase-II, planned to start operation at ~2023, will enable full capabilities with proton/ deuteron beams at 5 mA and 40 MeV. Liquid lithium targets will then be used to produce neutron sources with intensities of 1015 n/s, which after thermalization will provide thermal neutron (25 meV) fluxes of about 1012 n/s/cm2 at the entrance to neutron beam lines to diffraction and radiography stations.
Influence of strong solenoidal beam focusing on beam emittance was studied at the SARAF LEBT beam line using 5 mA 20 keV proton quasi-DC beams. The measurements show that within the experimental uncertainties, emittance does not change over the whole focusing range. Detailed beam dynamics simulations were performed to achieve better understanding of the experimental results. The experimental and simulation results are fully consistent with the assumption of nearly full space charge neutralization for the quasi-DC proton beam.
A 40-keV, 5-mA DC deuteron beam was operated at the SARAF with the purpose of characterizing the ion source and the low-energy beam transport system. We used this opportunity to address radiological concern of operating an intense deuteron beam. Fast and thermal neutrons produced via the D(d,n) reaction were measured in the vicinity of the components intercepting the beam using various methods. We found that the neutron yield from implantation of a deuteron beam in a graphite matrix is of the order of 2 × 106 n s−1 mA−1 into 4π.
A prototype of tungsten pins beam dump was tested with high power electron beam at the JUDITH 2 facility. A maximum electron beam power of 40 kW was applied on a nominal beam spot area of 4 × 4 cm2. This corresponds to the highest achieved beam power density of 1.4 kW/cm2. Approximately 16% of the deposited energy was removed by radiation at the highest beam power values, corresponding to estimated surface temperature of ≈ 3100 K. The results of the irradiation test are presented. The further improvements of the prototype are discussed. This result provides an encouraging input for possible design of a full power beam dump for SARAF Phase II.